Risk Mitigation Strategy for Public Private Partnership (PPP) of Airport Infrastructure Development Projects in Indonesia

Risk Mitigation Strategy for Public Private Partnership (PPP) of Airport Infrastructure Development Projects in Indonesia

Proceedings of the International MultiConference of Engineers and Computer Scientists 2017 Vol II, IMECS 2017, March 15 - 17, 2017, Hong Kong Risk Mitigation Strategy for Public Private Partnership (PPP) of Airport Infrastructure Development Projects in Indonesia Rusdi Usman Latief for the real economic Abstract—The capacity of the Government of Indonesia to grow the country to be developed country in 2025 as mentioned growth 6.4 to 7.5 percent during the period 2011-2014 and in The Master Plan for Acceleration and Expansion of about 8.0 to 9.0 for the period 2015-2025. However, the Indonesia's Economic Development (abbreviated MP3EI) faces inflation shall be declined from 6.5 percent in the period many challenges, one of them is financial capacity. Huge archipelago like Indonesia needs to be connected by good 2011-2014 to 3.0 percent for the period 2025. Which shows infrastructure, especially airport, and it’s needed a big amount the characteristic of developed countries. The demographic of money that the government still can afford it. The potential, the wealth of natural resources and geographical government realizes the limitation in funding the position will support the acceleration and expansion of infrastructure needs. The government comes with the concept Indonesia’s economic development. Although Indonesia has to form the cooperation with private sectors as known as a good strategic geographic position, but a number of Public Private Partnership (PPP). The national planning agency in Indonesia for PPP planning and implementation challenges are needed to be solved. One of them is the lack issues the PPP book to provide potential investors the of quality and quantity of infrastructures so that becomes information on available infrastructure investment in the reducing of competitiveness and attractiveness of Indonesia. Project listed in PPP Book are results of rigorous climate investment. Another challenge is that the main review and screening process by national planning agency. The investment problem of the Government of Indonesia in projects are organized into potential projects, prospective infrastructures is less of financial resources. Therefore, the projects, and ready to offer projects. The airport projects obtain the potential income from international flights and the participation of the private sector and both foreign and forecast of passengers becomes the main factor in increasing domestic sectors is desired. The presence of Public Private the development of infrastructure. The PPP schemes is Partnership (PPP) has been participating as an alternative expected to fulfill the financial problems in infrastructure and effective method to mobilize additional financial service providing. However, the private participation is resources to invest in infrastructures. PPP is not only for expected not only to fill the funding but also to share financial mechanism, but can also be appropriate to finance experience and knowledge in the development, operation, and management of qualified infrastructure service. Therefore, the resource for infrastructure projects. Currently, PPP is widely aim of the study is to develop risk mitigation strategy for taken a part in the sector of water treatment and highways airport infrastructure development projects and expected to be due to these sectors guarantees the financial benefits. problem solving for the lack of succession of PPP and can be a Moreover, PPP has been participating in other sectors such solution for acceleration of infrastructure development in as railway/railroad, housing, and airports. Indonesia. The research study was conducted by collecting The need of air transportation in Indonesia grows rapidly, data at several airports in Indonesia. The data used were primary and secondary data. The primary based upon field the increase of passenger and cargo reflects the survey, while secondary according to the study on the various circumstance each year. Surely it should be countered by literatures of the success with the implementation of PPP in the enlargement of airport infrastructure [6]. However, Indonesia and abroad. The findings and recommendations for Fiscal limitation which is from the national budget causes the study are risk response and risk strategy in order to the expansion of infrastructure capacity in Indonesia address of each risk that already identified. Risk response can hampered. Amongst of 2010-2014, it is estimated the need be: Retention, Avoidance, Reduction, or Transfer. of investment about an IDR1.450 quintillion [5]. One step Index Terms—risk mitigation, risk response, public private the government has taken to cope the infrastructure deficit is partnership to encourage active participation of the private sector, where private is allowed to join in developing infrastructure through Public – Private Partnership (PPP) scheme I. INTRODUCTION including risks share to each other. Until now there has been plan for the acceleration and expansion of no implementation of a successful PPP airport in Indonesia M Indonesia Economic Development (MP3EI) is an due to the high risk for private parties. Risk mitigation must ambitious plan by the government of Indonesia to be a be done to reduce the chances of occurrence of the risk or developed country in 2025. To reach this plan, it is required impact of a risk. Therefore, this study aims to develop risk mitigation strategy in airport infrastructure development and The author is from Civil Engineering, Hasanudin University, Jl. Poros expected to be problem solving for the lack of succession of Malino Km. 6, Gowa 92171, Indonesia, Email: [email protected] ISBN: 978-988-14047-7-0 IMECS 2017 ISSN: 2078-0958 (Print); ISSN: 2078-0966 (Online) Proceedings of the International MultiConference of Engineers and Computer Scientists 2017 Vol II, IMECS 2017, March 15 - 17, 2017, Hong Kong PPP in Indonesia, especially for airport infrastructure not eliminated completely but can only be reduced so that development. there will be residual risk. Thus, this can be done by risk retention, risk reduction, risk transfer and risk avoidance. II. LITERATURE REVIEWS III. RESEARCH METHODOLOGY A. PPP Airport Infrastructure Project in Indonesia The airport can be defined as one or more runways and A. Research Frameworks facilities to complement the aircraft (taxiway, apron area) This study have a framework which have five main steps along with Union terminal and facilities to lower passenger to achieving the purpose. Schematically, the research and cargo [1]. Airport operators are responsible for the frameworks following the steps as below. provision and maintenance of airport infrastructure, and on 1) Literature Study conditions of service, including the main searches of This research conducted an observation for the recent passengers, and security, fire, hygiene and maintenance condition of airport infrastructure of Indonesia and research areas of the passenger terminal. The operational of the related in the model. The references are collected to identify airport received income from aircraft service and marketing. the risks then determine all of variable risks for research. Major infrastructure airport terminal operations, Moreover, conduct the preliminary study not only for the consisting of runway operations, and taxiway facilities, are risk respond but also the risk strategy model as reference. such engineering facilities. The cargo, plane maintenance 2) Preparing Questionnaire facility, ARRF (Airport Rescue and Fire Fighting) fuel, Preparing a questionnaire with setting the total logistics facilities, administration, service aircraft, traffic respondents, draft, and the conceptual assessment model and utilities are also the main of airport infrastructures [3]. risk respond and mitigation for PPP airport in Indonesia. Airport operation such as service aircraft, service fleets, and The pilot survey is conducted to verify the feasibility of the marketing activities is a part of the main airport of service questionnaire through discuss with professionals in airport provision. This infrastructure becomes a reference for infrastructure before doing the main survey with a fix draft. BAPPENAS to develop the airport in the form of 3) Collecting Data cooperation PPP. The type of project that exists in PPP book The questionnaire distributed to all primary stakeholders 2010-2014 BAPPENAS diverse. The project will be soon in as respondents to get the model of risk mitigation with e- tender’s supports airport infrastructure in Indonesia, mail, post mail, or direct interview. especially in the form of PPP cooperation entered into PPP 4) Analysis and Discussion Book list (2010-2014) BAPPENAS. The feedback of the questionnaire from respondents is a primary data, then analysis to get the interpretation and B. Risk of PPP Airport Infrastructure further information. The main risk in investment related to the Airport directly 5) Result and Conclusions with the basic parameters of the PPP infrastructure The result describes the interpretation of analysis data and investment in the airport that is the decisive variable the new finding of this research. magnitude as the cost of the investment. PPP risks are B. Method of Data Collections divided the airport into Air Traffic Forecast, Airport Development Proposal, Airport Transport Risk, Revenue TABLE I PRIMARY RESPONDENT ON PPP AIRPORT PROJECTS Estimation, Capital Cost Estimates, Concessionaire Sum of PRIMARY STAKEHOLDER Competition & amp; Culture, Institutional Influence, Effect Respondents of Term

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    6 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us