Nizamabad-Constituency Wise Brochure Final.Cdr

Nizamabad-Constituency Wise Brochure Final.Cdr

Green Initiatives 1. Revival of water Bodies with a cost of `0.0387 crore has been completed at Nizamabad towards water conversation measures. 2. LED lighting has been provided at all Railway stations under the jurisdiction of Nizamabad Parliamentary constituency towards Energy conservation measures. Passenger Train Services Nizamabad Parliamentary Constituency Details of Special Trains/ Provision of Stoppages/ Extension of Trains in Nizamabad Parliamentary Constituency Jurisdiction. Shri Narendra Modi Hon’ble Prime Minister Provision of Stoppage 1. Tr.No.17417/17418 Tirupati-Shirdi-Tirupati Weekly Express at Nizamabad Extension of Trains RAIL DEVELOPMENTAL WORKS 1. Tr.No.77260/77259 Karimnagar – Lingampet Jagityal DEMU extended to Nizamabad with stoppages at Koratla, Metpalli, Morthad and Armur Nizamabad Parliamentary Constituency Jurisdiction 2.Tr.No.17429/17430 Tirupati-Hyderbad-Tirupai Rayalaseema Express extended to Nizamabad with new T.No.12793/12794 3. Tr.No. 12720/12719 Hyderabad – Ajmer up to Jaipur 4. Tr.No. 11205/11206 Lokamanya Tilak Terminus – Nizamabad up to Karimnagar Additional Stoppage provided for Existing Trains South Central Railway serving the entire state of 1. Tr.No.57557 Nizamabad–Nanded Passenger at Chikna Telangana, major portion 2. Tr.No.57558 Nanded–Nizamabad Passenger at Chikna of Andhra Pradesh and Special Trains on Originating basis considerable portion of SOUTH CENTRAL 1. Nizamabad to Kollam 6 special trains Karnataka, Maharastra 2. Nizamabad to Bhopal 1 special train states and small parts RAILWAY 3. Nizamabad to Adilabad 10 special trains of Tamilnadu and 4. Nizamabad to Basar 41 special trains Madhya Pradesh. 5. Nizamabad to Dharmabad 8 special trains 6. Nizamabad to Kacheguda 1 special train Nizamabad Parliamentary 7. Nizamabad to Malkajgiri 10 special trains Constituency falls under Telangana State. Entire 8. Nizamabad to Nanded 8 special train Railway Network of 9. Nizamabad to Purna 4 special trains this constituency 10. Nizamabad to Tirupati 1 special train is being served by (Total 90 special Trains) South Central Railway. ASSEMBLY SEGMENTS Road Over / Under Bridges With a view to strengthen safety at Level Crossing gates and to avoid untoward incidents and also to provide seamless journey to road traffic, the following Road under /over Bridges Armur (RuB/RoB) are constructed / proposed for construction under Nizamabad Parliamentary constituency. Bodhan Road Over Bridges/Limited Use Subway 2. Construction of RuB in Secunderabad-Mudkhed Nizamabad (Urban) section to eliminate Manned LC No.192A between 1. Proposed for construction of 2-lane RoB & LHS in Nizamabad and Dichpalli stations with an Nizamabad (Rural) lieu of LC No.193 between Dichpalli– Nizamabad estimated cost of ` 2.48 crore is completed with an estimated cost of ` 44.07 crore Balkonda 3. Construction of RuB in Secunderabad-Mudkhed Road Under Bridge section to eliminate Manned LC No.200 between Koratla 1. Construction of RuB in Secunderabad–Mudkhed Indalvai and Sirnapalli stations with an estimated section to eliminate Manned LC No. 194 between cost of `2.42 crore is completed Jagtial Nizamabad and Dichpalli stations with an 4. All unmanned Level Crossings in Nizamabad estimated cost of ` 2.44 crore is completed Parliamentary jurisdiction are eliminated completely by construction of RuBs RAIL DEVELOPMENTAL WORKS Nizamabad Parliamentary Constituency Jurisdiction Passenger Amenities Station Amenity Amount Status Dichpalli Platform Extension `0.29 crore Completed Infrastructural Development Provision of Passenger Amenities and Manoharabad Platform Extension Completed facilities, and its improvements at Dichpalli Platform Extension `6.18 crore Proposed New Railway Line Bodhan 3. Electrification of Lingampet Jagityal – 1. New railway line work between Lingampet Railway Stations is one of the most Sirnapalli Nizamabad for a distance of 95 kms at an Jagityal – Nizamabad for a distance of 95.6 important aspect Railway Services. Navipet Platform Extension `10 crore Proposed estimated cost of ` 80.29 crore is in fast Kms of Peddapalli -Karimnagar -Nizamabad Jankampet progress project (178 Kms) at a cost of ` 500 crore is Indalvai completed. Ticket Window Counters Yadavalli Capacity enhancement Nizamabad Platform Extension `0.15 crore Completed 1. Provided Ticket window counters at ` Electrification of Railway Lines 1. Yard Remodeling work at Nizamabad for Nizamabad, Katlakunta Medipalli, Metpalli, Nizamabad Toilets 0.10 crore In Progress Kamareddy Toilets `0.20 crore In Progress 1. Electrification of Peddapalli – Lingampet connecting PF No.1 & 2 to shunting neck is Korutla, Mortad, Anksapur, Armur and Mamidipalli Stations with a cost of `5 lakh Sirnapalli Toilets `0.15 crore In Progress Jagityal Railway line for a distance of 83 completed. towards passenger amenity. Indalvai Toilets `0.14 crore In Progress Kms is in fast progress at an estimated cost 2. Proposed for Remodeling of yard work at Nizamabad Platform Shelter `0.51 crore In Progress ` Nizamabad for arrangements to provide of 85 crore Nizamabad Station Building `0.53 crore In Progress 2. Proposed for Electrification of Manmad – additional platform with an estimated cost of `8.80 crore Nizamabad Circulating Area `0.25 crore Developed Dhone Railway line for a distance of 868 6 Stations Wi-Fi Facility `9 lakh Provided Kms at an estimated cost of ` 1031 crore Nizamabad CCTV Surveillance `0.53 crore Proposed Lingampet Safety – The First Priority Jagityal Toilets `0.01 crore Constructed Nizamabad Two Lifts `1 crore Provided Nizamabad Waiting Room `0.19 crore Renovated Safety is the priority on SCR, to ensure safety of the Rail users, Foot over Bridges (FoBs)are Nizamabad 4 WVMs Installed constructed / proposed for construction at various stations/locations in Nizamabad Nizamabad Concrete Apron `2 crore Proposed Parliamentary Constituency Jurisdiction. Nizamabad CoTVM `0.045 crore Installed Nizamabad 3 ATVMs `0.045 crore Installed Nizamabad TIB/CIB `0.1414 crore Provided 1. Constructed a FoB at Nizamabad Station at a cost of ` 1.6 crore Nizamabad Concrete Apron `2.40 crore In Progress 2. Proposed for construction of another FoB at Nizamabad with an estimated cost of ` 1.83 crore Nizamabad Improved Illumination - Provided Dharmabad Improved Illumination - Provided.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us