6 APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information Sr. Item Details No. 1. Name of the project/s Environmental Clearance for the proposed Residential Project jointly developed by M/s Purva Realities Pvt. Ltd. & M/s Melmont Construction Pvt. Ltd. 2. S. No. in the schedule 8 (a), Construction Project with built-up area 72,716.56 sq. m. 3. Proposed capacity / area / length Total Plot Area = 1.50 ha. (14,999.48 sq.m.) /tonnage to be handled/command Total Built-up Area = 72,716.56 sq. m. area/lease area/ number of wells Total no. of Apts. = 647 Nos. to be drilled 4. New/Expansion/Modernization New (Proposed Residential Building Project) 5. Existing capacity/area etc., Not applicable 6. Category of Project i.e. ‘A’ or ‘B’ Category ‘B’ 7. Does it attract the general NO condition? If yes, please specify 8. Does it attract the specific NO condition? If yes, please specify 9. Location Sy. Nos. 140/2, 9, 10 (part), 11 (part), 13, 140/23, 141/3, 15, 159/1, 137/11 part & 137/6 part, Village Vazhakkala, Thrikkakara Municipality, Kanayannur Taluk, Ernakulam District, Kerala. Plot/Survey/Khasra No. Sy. Nos. 140/2, 9, 10 (part), 11 (part), 13, 140/23, 141/3, 15, 159/1, 137/11 part & 137/6 part, Village Vazhakkala Tehsil Kanayannur District Ernakulam State Kerala 10. Nearest railway station/airport The nearest railway stations (Edappally along with distance in Kms Railway Station) which is located at about 2.5 km. (NW) and Cochin International Airport is at about 23 km. (NE) away from the project site. 11. Nearest Town, city, District City – Project site is within the Kochi city Headquarters along with distance limits in Kms District Headquarters – Civil Station, Thrikkakara, about 5 km. (SE) 12 Village Panchayats, Zilla Village office address :- Parishad, Municipal Corporation, Village Office Vazhakkala, Local body (complete postal NGO Quarters, Vazhakkala, Vazhakkala, addresses with telephone nos. to Ernakulam, Kerala 682021. be given) Municipality Address :- Thrikkakara Municipality Address :- Thrikkakara Municipality, 7 Kakkanad Village, Kanayannur Taluk, Ernakulam, Kerala-682030. Ph. No. 0484 – 2422383. 13 Name of the applicant M/s Purva Realities Pvt. Ltd. & M/s Melmont Construction Pvt. Ltd. 14 Registered Address No. 41/199A, Padivattom, N.H. 47 Byepass, Edappally P.O., Kochi, Kerala-682024. 15 Address for correspondence : No. 41/199A, Padivattom, N.H. 47 Byepass, Edappally P.O., Kochi, Kerala-682024. Name Mr. Ranjit Thomas Designation(Owner/Partner/CEO) Authorized Signatory Address M/s Purva Realities Pvt. Ltd. & M/s Melmont Construction Pvt. Ltd. No. 41/199A, Padivattom, N.H. 47 Byepass, Edappally P.O., Kochi, Kerala-682024. Pin Code Kerala-682024 E-Mail [email protected] & [email protected] [email protected] Telephone No. 0484-2886209 / Mobile No. 09895712101 Fax No. 0484-2319904 16 Details of Alternative Sites Not Applicable examined, if any. Location of Village-District-State these sites should be shown on a 1. topo sheet 2. 17 Interlinked Projects Not applicable 18 Whether separate application of Not applicable interlinked projects has been submitted? 19 If yes, date of submission Not applicable 20 If no, reason Not applicable 21 Whether the proposal involves approval/clearance under: If yes, details of the same and their status to be given. (a) The Forest (Conservation) NO Act, 1980? (b) The Wildlife (Protection) Act, NO 1972? (c) The CRZ Notification, 2011 ? NO 22 Whether there is any NO Government Order/Policy relevant/relating to the site? 23 Forest land involved (hectares) NO 24 Whether there is any litigation NO pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project. 8 (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes Details thereof (with approximate No. confirmation / No quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary Yes There will be permanent change in land change in land use, land cover use, land cover or topography including or topography including increase in intensity of land use. increase in intensity of land use The present project is a residential (with respect to local land use project and is located at Vazhakkala plan) Village which is falling in Municipal limits of Thrikkakara, Ernakulam District, Kerala. During construction phase, about 150 workers (average) will be at site. During operation phase, on full occupancy of housing project, the maximum population expected is 3,235 persons (residents) and hence there is increase in the intensity of land use. (Source: population is calculated based on NBC) 1.2 Clearance of existing land, Yes There are some of native species of vegetation and buildings? trees and different varieties of shrubs, herbs, grass & climbers at site. For the development of the proposed project, existing trees, different varieties of shrubs, herbs, grass & climbers will be cleared. Also there is old shed/structure which also to be cleared from the site. 1.3 Creation of new land uses? Yes The new land use will be for 647 Apartments project. 1.4 Pre-construction investigations Yes Pre-construction Soil Investigation has e.g. bore houses, soil testing? been carried out for the site. It is observed that the water table is higher level from the existing ground level. 1.5 Construction works? Yes Construction of 647 Apartments. Internal roads for movement inside the complex will be constructed. 1.6 Demolition works? Yes For the development o f the proposed project, existing old sheds/s tructures will be cleared from the site. 1.7 Temporary sites used for Yes Temporary sheds constructed for construction works or housing housing of construction workers (about of construction workers? 150 persons). 1.8 Above ground buildings, Yes It is proposed to construct residential structures or earthworks project with supporting infrastructure including linear structures, cut facilities within the site. and fill or excavations Excavation of earthwork for f oundation of structures work will be carried out. The top soil which is fertile will be kept 9 at site for landscaping work. The excavated soil will be used for back filling work and for internal road construction purposes. 1.9 Underground works including Yes No underground works including mining mining or tunneling? / tunneling required except the work and foundation work for the structures. 1.10 Reclamation works? No Not applicable 1.11 Dredging? No No dredging work required. 1.12 Offshore structures? No No offshore structure required. 1.13 Production and manufacturing No No production / manufacturing process processes? involved. 1.14 Facilities for storage of goods Yes Separate raw material store of cement or materials? and other construction mate rials is made within the project premises. Bricks and steel laid in open. 1.15 Facilities for treatment or Yes Construction phase :- disposal of solid waste or liquid Solid waste generation from the project effluents? during construction phase will be a bout 60 Kg/day and domestic sewage will be about 9 KL/day. The non-biodegradable waste and other packaging material will be sold to the vendors. The bio- degradable solid waste will be disposed in a bio-bin system for microbial composting and a mobile STP f or the treatment of domestic sewage from the labour colony. Operation phase :- Solid waste generation will be about 1,294 Kg/day. The Solid Waste Management Rules, 2016 will be followed in the solid waste disposal. Collection & segregation within the sit e (bio-degradable waste (green bins), non- biodegradable waste (blue bins) and domestic hazardous waste (yellow bins). The recyclable waste like packaging material, paper etc. would be sold through vendors and the area earmarked for the storage of the same. The Bio- degradable waste would be disposed through the bio-gas generation unit/bio- bin to be installed within the site. The bio-gas generated will be utilized within the site and the manure generated will be utilized for green area development within the premises. The domestic hazardous waste which includes discarded painted drums, pesticide cans, CFL bulbs, tube lights, expired medicines, broken mercury thermometers, used batteries, used needles and syringes and contaminated gauge etc. generated at the ho usehold level will be collected in yellow bins and 10 to be handed over to authorized waste pickers or waste collectors. Effluent :- The domestic sewage about 362 KL/day will be generated which will be treated through proposed Sewage Treatment Plant to be i nstalled within the project premises. 1.16 Facilities for long term housing No The proposed project is housing project of operational workers? and therefore no accommodation facility is proposed for the operational workers. 1.17 New road, rail or sea traffic No Not applicable during construction or operation? 1.18 New road, rail, air waterborne No Not applicable or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not applicable transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission No Not applicable lines or pipelines? 1.21 Impoundment, damming, No Not applicable culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? Yes The proposed land is divided in to two portions by a small drain flowing in north east to south direction which is join to Edapally thodu in south side. 1.23 Abstraction or transfers of Yes Use of ground water only based on the water form ground or surface permissible yield from the large open waters? wells.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages15 Page
-
File Size-