Cadenza Document

Cadenza Document

City of Perth Building Permits Issued 27/01/21 - 2/02/21 Application Number Application Description Primary Property Address Est Value Decision Decision Date Level 1 - Minor refurbishment works to existing retail space: Opening up of wall partitions (non-structural) and upgrading windows to tempered glass. Works do not affect any fire, 255 Murray Street Mall BPC-2020/634 mechanical or electrical system in the building. PERTH WA 6000 $2,500 Grant 28/01/21 "ALLENDALE SQUARE" Relocation of Sherwood Court entry to the Arcade, internal fitout 77 St Georges Terrace BPC-2020/690 and reconfiguration to suit PERTH WA 6000 $521,000 Grant 28/01/21 Stage 1 - Ground, First and Second Floor Refurbishment, including 42-46 Colin Street BPC-2020/707 interconnecting Stair between Ground and Level 1. WEST PERTH WA 6005 $4,070,000 Grant 27/01/21 Fitout 1118-1120 Hay Street BPC-2020/713 WEST PERTH WA 6005 $15,929,199 Grant 27/01/21 "ST JOHN'S LUTHERAN" Internal fitout (to create new classrooms) - Tenancy 3 - ANZ 16-18 Aberdeen Street BPC-2020/718 College PERTH WA 6000 $15,000 Grant 27/01/21 "QV1" 250 St Georges Terrace BPC-2021/12 Retail Shop Fit Out - Mak Mak Thai PERTH WA 6000 $200,000 Grant 27/01/21 227 Newcastle Street BPC-2021/13 Solar Panel Installation NORTHBRIDGE WA 6003 $27,237 Grant 28/01/21 9 Havelock Street BPC-2021/14 Proposed fitout of existing tenancy - G.04 WEST PERTH WA 6005 $120,000 Grant 29/01/21 "BROOKFIELD PLACE" 125-137 St Georges Terrace BPC-2021/15 Offices - Brookfield Office Relocation Works (Level 3) PERTH WA 6000 $548,815 Grant 29/01/21 108 St Georges Terrace BPC-2021/16 Office Alterations (Part Floor) PERTH WA 6000 $260,000 Grant 27/01/21 900 Hay Street BPC-2021/19 Performance Solution for ROW Walkway & Ramp PERTH WA 6000 $1,000 Grant 28/01/21 "BUTTERWORTH BUILDING" 886-890 Hay Street BPC-2021/22 Internal modification to Stables bar PERTH WA 6000 $98,868 Grant 1/02/21 "ALLENDALE SQUARE" Removal of existing fire door and install new fire wall, new store 77 St Georges Terrace BPC-2021/23 room and finishes PERTH WA 6000 $4,000 Grant 2/02/21 Base build works, alterations to sanitary facilities & make good 108 St Georges Terrace BPC-2021/24 works PERTH WA 6000 $950,000 Grant 2/02/21 14 Sum: $22,747,619.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us