Teton Pass Wyoming FLAP Project 2020 Draft List 9/18/20

Teton Pass Wyoming FLAP Project 2020 Draft List 9/18/20

Teton Pass Wyoming FLAP Project 2020 Draft list 9/18/20 Design and Construction Projects Length/Quantity Cost Estimate Lead Agency Coordination Notes and needs East Side Teton Pass Summit and Overflow lots, Parking and Needs additional engineering analysis/established as FS Pedestrian Safety Enhancements 10-30 spaces $300,000 Teton County WYDOT/BTNF trailhead Phillips Trailhead Bike/Hike/Ski Underpass, Parking and 1@100', 50 spaces +/- total Needs additional engineering analysis, address WYDOT Rock Safety Enhancements capacity $1,500,000 Teton County WYDOT/BTNF storage Turning lane at Trail Creek Road 1 $300,000 WYDOT TC Needs additional engineering analysis, ROW Concerns Chain up and skier pick up below Heidelburg 1 $300,000 WYDOT TC Chain up, Skier Ride share Backcountry ski info desk at Stilson transit center 1 $0 TBCA BTNF Include in future Stilson Transit Center West Side Coal Creek Trailhead Bike/Hike/Ski Underpass, Parking and Safety Enhancements 1 @ 100' +/- $1,200,000 Teton County CTNF/WYDOT Needs additional engineering analysis, CTNF approval Coal Creek to BPA/Old Pass Road Reconnect connect 1,300' $400,000 Teton County CTNF/WYDOT NEPA approved, would require retaining wall BPA/Old Pass Road Repaving 1.8 miles +/- $700,000 Teton County CTNF EA needed. Ask Jim Verdone for cost estimates Safety Pedestrian beacons top of Pass, other crossing areas 3-4 locations? $50,000 WYDOT TC/BTNF Analyze needs and solutions Transit Transit - Purchase START Ski Shuttles 4 small vans/buses $400,000 TOJ/TC Victor Driggs Stilson/Wilson/Teton Pass Shuttle Planning WY-22 / Teton Pass Corridor Plan; Include Snow Shed Economic Impact Study, Study Large Truck Permit System, Safety improvements 12 miles $350,000 Multi-Agency Include ITD for Idaho 33 section Total All Project $5,500,000 Percent Planning. Note FLAP prioritizes Construction Planning percentage 6.36% projects Federal Lands Access Program Grant and Match Federal FLAP Grant 90.49% $4,976,950 Federal FLAP Request for above projects Minimum Match 9.51% $523,050 Higher match would give bonus points $5,500,000 Partners and Nonprofits Interest Area Revenue Organization Notes and needs Teton Backcountry Alliance Teton Pass TBD Nonprofit Supports Teton Pass skier access and safety maintenance Friends of Old Pass Road/Jim Verdone, FOP Teton Pass WY TBD Nonprofit Pathway Maintenance needs TVTAP Teton Pass, ID TBD Nonprofit Pledge to help Idaho Victor FLAP project Wyoming Pathways Wilson-Victor TBD Nonprofit Teton Pass Trail and Greater Yellowstone Trail project Jackson Hole Mountain Resort Teton Pass Snow Sheds TBD Private Support for study of snow sheds Staff support, information, maintenance, Friends groups, USDA Forest Service BTNF, CTNF TBD Federal direct agency funding. WYDOT Highway Infrastructure WY-22 as needed State, Federal Maintenance for any direct WY-22 Highway improvments.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us