China Hong Kong Railway Institution P.O

China Hong Kong Railway Institution P.O

CHINA HONG KONG RAILWAY INSTITUTION P.O. Box No. 626 Shatin Central Post Office Fax : 2947 7001 Web Site : www.chkri.hk 26th September 2018 Technical Visit – Hin Keng Station Date: 13 October 2018 (Saturday) Time: 09:30 - 12:00 noon Venue: SCL Hin Keng Station CHKRI will organize a visit to the works site of Hin Keng Station of the Shatin to Central Link (SCL). In this visit, you will have the chance to appreciate the various features of this new SCL station in particular its architectural and environmental design blending with the community. The SCL will connect several existing railway lines. Tai Wai to Hung Hom Section will connect the West Rail Line and Ma On Shan Line to form Tuen Ma Line, while Hung Hom to Admiralty Section will extend the existing East Rail Line from Hung Hom across the harbour to Hong Kong Island. The SCL will have 10 stations. Six will be interchange stations where passengers can conveniently change to other railway lines. Since the commencement of further planning and design in 2008, the Government established that the addition of Hin Keng Station will relieve congestion at Tai Wai Station and recognized the need of railway service for the residents of Hin Keng area. Hin Keng Station is therefore added to the project. Hin Keng Station will be an elevated station situated to the southwest of the former Agriculture, Fisheries and Conservation Department New Territories South Animal Management Centre, the former Shatin Plant Quarantine Station and Hin Tin Playground. Attendees shall wear their own PPE including helmets, reflective vest and safety shoes during the visit . The maximum number of participants for this visit is 25. In the event of over-subscription, a ballot will be held. Paid-up members will be given the first priority to participate the visit and eligible for attendance certificate. The itinerary is as follows: 09:30 Assemble at outside of PARKnSHOP, G/F Hin Keng Shopping Centre, 69 Che Kung Miu Road, Hin Keng, Tai Wai 09:45 Presentation of project brief at concourse area of Hin Keng Station 10:15 Site walk introducing the Hin Keng Station 11:45 Group Photo. Visit ends and participants leave Registration For registration, each participant has to confirm to CHKRI his/her name, employer and contact telephone number by filling the online form on or before 3rd Oct 2018. https://goo.gl/forms/pRuy5vggorD0XSk12 Alex Lo Secretary, CHKRI .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us