Future Works in Murweh Shire 0 5 10 20 Revision: 03/2014 Version: 10

Future Works in Murweh Shire 0 5 10 20 Revision: 03/2014 Version: 10

Legend LONGREACH TAMBO CENTRAL HIGHLANDSCompleted Not Completed BLACKALL TAMBO BANANA BARCOO 247/13B/652 Aramira Shadforths Joint Venture Repairing damaged road surface March 2014 to April 2014 13B BANANA AUGATHELLA INJUNE 24E ADAVALE 247/23C/650 247/13A/650 Aramira Shadforths Joint Venture Full width reconstruction in sections Patching, repairs and drainage works Completed May 2013 November 2013 to April 2014 4403 13A 247/18F/651 Full width reconstruction in sections 23C (combined with Maranoa works) 13A LANDSBOROUGH HIGHWAY (Morven - Augathella) Completed November 2013 13B LANDSBOROUGH HIGHWAY (Augathella - Tambo) 24D 7101 18D WARREGO HIGHWAYQUILPIE (Miles - Roma) 18E WARREGO HIGHWAY (Roma - Mitchell) 18F WARREGO HIGHWAY (Mitchell - Morven) 247/93A/650 CHARLEVILLE 18G WARREGO HIGHWAY (Morven - Charleville) Patching, repairs and drainage works 18G 18F MARANOA 23A MITCHELL HIGHWAY (Barringun - Cunnamulla) Completed December 2013 MITCHELL 23B MITCHELL HIGHWAY (Cunnamulla - Charleville) 23C MITCHELL HIGHWAY (Charleville - Augathella) ROMA 24A CARNARVON HIGHWAY (MungindiQUILPIE - St George) 247/18F/650 18E 24B CARNARVON HIGHWAY (St George - Surat)93A 93A Repairs and drainage works 24C CARNARVON HIGHWAY (Surat - Roma) 247/18G/650 & 651 Completed February 2013 24D CARNARVON HIGHWAY (Roma - Injune) Full width reconstruction in sections 24E CARNARVON HIGHWAY (Injune - Rolleston) Completed September 2013 247/18G/652 3501 31B BARWON HIGHWAY (Talwood - Nindigully) 23B Pavement stabilisation and overlay 344 ROMA - CONDAMINE ROAD 247/23B/650 Completed March 2014 24C 3441 WALLUMBILLA SOUTH ROAD Aramira Shadforths Joint Venture 348 THE BORDER - CARNARVON HIGHWAY Repairing damaged road surface 3501 ROMA - SOUTHERN ROAD March 2014 to April 2014 3514 NOONDOO - THALLON ROAD 355 MITCHELL - ST GEORGE ROAD 35A MOONIE HIGHWAY (Dalby - St George) 355 P:\GIS\Projects\217063TMR Southwest NDRRA\Mapping\PackageWorks_Murweh_V4.mxd 17/07/2013 16:12 3601 CHARLEVILLE - BOLLON ROAD 36A BALONNE HIGHWAY (St George - Bollon) 36B BALONNE HIGHWAY (Bollon - Cunnamulla) 37A CASTLEREAGH HIGHWAY (St George - Hebel) 4302 JACKSON - WANDOAN ROAD WYANDRA 4397 ROMA - TAROOM ROAD 4403 MITCHELL - FOREST VALE ROAD 7001 HUNGERFORD ROAD 7003 QUILPIE - THARGOMINDAH ROAD 7101 QUILPIE - ADAVALE ROAD 7103 BLACKALL - ADAVALE ROAD PAROO 79A COOPER DEVELOPMENTAL ROAD (Quilpie - Bundeena) 86A SURAT DEVELOPMENTAL ROAD (Surat - Tara) 93A DIAMANTINA DEVELOPMENTAL ROAD (Charleville - Quilpie) 93B DIAMANTINABULLOO DEVELOPMENTAL ROAD (Quilpie - Windorah) 94A BULLOO DEVELOPMENTAL ROAD (Cunnamulla - Thargomindah) 94B BULLOO DEVELOPMENTAL ROAD (Thargomindah - Bundeena) BALONNE 3601 Copyright:© 2013 Esri Mapby: Aurecon Australia: ZontaRA(Aurecon) 7003 Project values and construction timeframes are subject to change. A3 scale: 1:1,500,000 Job No: 217063-001 South West Transport Network Reconstruction Program Coordinate System: GCS GDA 1994 ° Kilometres Future Works in Murweh Shire 0 5 10 20 Revision: 03/2014 Version: 10.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us