Steeles West District Urban Design & Streetscape Plan Steeles West Urban Design & Streetscape Plan

Steeles West District Urban Design & Streetscape Plan Steeles West Urban Design & Streetscape Plan

City of Vaughan Fall 2012 (updated 2016) Sweeny Sterling Finlayson &Co Architects Inc + Dillon Consulting Steeles West District Urban Design & Streetscape Plan Steeles West Urban Design & Streetscape Plan Fall 2012 (Updated April 2016) Other documents to consult: Sweeny Sterling Finlayson &Co Architects Inc. Vaughan Official Plan 2010 , adopted by City of Vaughan Council on (“&Co Architects”) and Dillon Consulting: September 7, 2010 (as modified on September 27, 2011, March 20, 2012 Christian Huggett, &Co and April 17, 2012) Alan Ng, &Co Steeles West Secondary Plan, Volume 2 of the Vaughan Official Plan Mike Votruba, &Co (as modified at the Ontario Municipal Board, 2016) Kiran Chhiba, Dillon Term of Council Service Excellence Strategy Map (2014-2018) DJ Lee, Dillon Community Improvement Plan for the Steeles Avenue Corridor, Melissa Kosterman, Dillon Jane Street to Keele Street, City of Vaughan, June 11, 2007 Land Use Review: Steeles Avenue Corridor - Jane Street to Keele Street, Final Report, City of Vaughan, September 2004 Vaughan Vision 2020 – The City of Vaughan Strategic Plan, December 2007 Green Directions Vaughan – Community Sustainability and Environmental Master Plan, 2009 City of Vaughan Design Criteria and Standard Drawings, March 2004 OPA 620 Proposed East-West Collector Road Class Environmental Assessment, City of Vaughan, May 2010 Steeles Corridor: Jane to Keele OPA 620 Municipal Servicing Master Plan Class Environmental Assessment Study, October 2011 York Region Pedestrian & Cycling Master Plan, April 2008 Active Together Master Plan, Parks, Recreation, Culture & Libraries Master Plan, City of Vaughan, 2008 Pedestrian and Bicycle Master Plan Study, City of Vaughan, January 2007 York University Secondary Plan Update, City of Toronto, October 2009 Keele Street Class Environmental Assessment Study from Steeles Avenue to Rutherford Road, York Region, 2012 Metrolinx Mobility Hub Guidelines for the Greater Toronto and Hamilton Area Spadina Subway Extension Project, Toronto Transit Commission ii Steeles West Table of Contents Urban Design & Streetscape Plan Introduction 3 Existing Conditions 7 Planning Framework 19 Consultation 29 Development Concept 33 Urban Design Guidelines 61 Streetscape Plan 81 Conceptual Rendering West Along Mid Block Greenway 1 Steeles West Urban Design & Streetscape Plan 2 Steeles West Introduction Urban Design & Streetscape Plan • Purpose • Vision • Study Area • What is an Urban Design & Streetscape Plan? Purpose Vision The Steeles West Urban Design and Streetscape The new Steeles West District will be a multi-modal, Plan (the “Plan”) provides specific design parameters mixed-use precinct, centred around pedestrian and to enact and enhance the planning framework. transit-supportive development. A fine-grain and high The construction of the northward extension of the quality network of streets, blocks and buildings will be Spadina Subway line to a new stop at the site (Pioneer created that will provide connectivity, sustainability Village Station) creates a catalyst for the development and variety throughout. and redevelopment of the area. A primary objective of the Plan is to craft a plan that allows the City of Vaughan to evaluate and respond to development applications consistently, with a comprehensive set of overall design guidelines. This area is anticipated to develop over a long time frame (+25 years). This Plan is to catalogue and document the overall design thinking for the evolution of the area. The Plan also highlights and demands placemaking and identity building within the Steeles West Secondary Plan area to make it a unique and well identified community that will help connect the City of Vaughan, the City of Toronto, and York University. Included within this Plan are an overall Development Concept, Urban Design Guidelines and a Streetscape Plan. These are all elements to be read in conjunction with each other in assessing the anticipated development potential of the Study Area. These do not replace pertinent planning documents, but instead provide further clarification of the intentions of those documents. 3 Steeles Introduction West Urban Design & Streetscape Plan Study Area The Study Area of the Steeles West Urban Design & Streetscape Plan is located at the southern edge of the City of Vaughan, bordering on the City of Toronto. Steeles Avenue West is a City of Toronto road that borders the municipalities. As a result, this Plan only addresses lands on the north side of Steeles Avenue West, but the design and details have been coordinated wherever possible with the Study City of Toronto on the south side. Area Located on the north side of Steeles Avenue West, the Study Area is bounded by Jane Street to the west, Keele Street to the east, and an extensive hydro and rail corridor to the north. The total land area is approximately 47.8 hectares (118 acres). This land is located within the Humber River watershed/Black Creek subwatershed. regional scale SCHEDULE 14-A The primary development driver will be the Areas Subject to Secondary Plans northward extension of the Spadina Subway, King Vaughan Road municipal scale Secondary Plan Areas – Chapter 11 1 Carrville Centre Secondary Plan – 11.2 Jane Street Weston Road Highway 27 Highway 400 Keele Street Dufferin Street 2 Steeles West Secondary Plan – 11.3 Cold Creek Road Bathurst Street Kipling Avenue Pine Valley Drive extended northwards from its current terminus in Road Vaughan Albion 3 3 Highway 400 North Employment Lands – 11.4 Kirby Road Kirby Road 4 Kipling Avenue – 11.5 4 4 Secondary Plan Areas to be Approved Toronto at Downsview Station, to a new terminus 4 4 1 Vaughan Metropolitan Centre Huntington Road 2 Yonge Street Corridor 4 3 Woodbridge Focused Area Nashville Road Teston Road Teston Road 4 Kleinburg-Nashville Focused Area at the Vaughan Metropolitan Centre (Highway 7 5 West Vaughan Employment Area Required Secondary Plan Areas 1 Vaughan Mills Centre and Jane Street). The subway extension will provide 2 Weston Road and Highway 7 5 Major Mackenzie Drive West Major Mackenzie Drive West 3 Concord Centre 4 New Community Areas (Blocks 41 & 27) 5 Jane Street and Major Mackenzie Drive a stop, Pioneer Village Station, within the Steeles 6 Dufferin Street and Centre Street 7 Promenade Mall Islington Avenue 1 Rutherford Road Rutherford Road Minister’s Decision on ORMCP Designation Deferred West District at the intersection of Steeles Avenue 1 Municipal Boundary West and Street C/ Northwest Gate. The station 5 Langstaff Road Langstaff Road 3 2 will have a YRT/ Viva bus terminal on the north 4 Jane Street Highway 400 Weston Road Highway 27 Highway 50 Highway Kipling Avenue Yonge Street Pine Valley Drive Bathurst Street 3 Dufferin Street 1 Highway 7 Highway 7 Centre Street 2 6 side of Steeles Avenue and a TTC terminal on the 7 Highway 407 2 Proposed Spadina Subway Highway 427 2 Steeles Avenue West south side. A large surface commuter parking lot Steeles Avenue West Extension Map : TTC. 0 1,000 2,000 3,000 4,000 5,000 Meters will be located in the hydro corridor to the north of September 2010 the station.The Pioneer Village Station will provide Study Area convenient, reliable, higher order mass transit service to residents, workers, students and visitors. 4 Steeles West Introduction Urban Design & Streetscape Plan What is an Urban Design & Streetscape Plan? The Study Area is expected to change dramatically over the next 30 years, as (i) the Pioneer Village Pioneer Village Station subway station is built, (ii) a new bus terminal is (Vaughan) built, and (iii) as York University lands develop. In addition, the continued expansion and growth of the City of Vaughan will generate development pressure in this area as it transitions from suburban industrial rail corridor land use towards a more intensive and urban mixed- use community. The Steeles West Secondary Plan hydro corridor provides development principles and objectives, a public realm framework, and urban design policies for the new District. Jane Street Steeles Avenue West This Plan provides a design framework to (i) direct growth and change, and, (ii) to guide new development and redevelopment. This will include the location of future road alignments, Black Creek Pioneer Village proposed parks and open spaces, and transit York University station and infrastructure. The Plan will also detail road classifications, potential buildings types Keele Street and configurations, and street and built form relationships. This Plan is intended to represent the desired approach for growth of the Steeles West Primary Centre over the long term (25+ years) as the lands Pioneer Village Station York University Station develop. (Toronto) 5.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    7 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us