Changes to Southern and Gatwick Express Services This Easter While Engineering Work Takes Place

Changes to Southern and Gatwick Express Services This Easter While Engineering Work Takes Place

Mar 23, 2016 09:28 GMT Changes to Southern and Gatwick Express services this Easter while engineering work takes place Passengers are being urged to check before travelling over Easter as major improvement work on the railway means Southern and Gatwick Express services will be amended over the Easter weekend of 25 – 28 March. The Network Rail project at Battersea, which replaces a major railway junction, means Southern and Gatwick Express trains will not be able to use London Victoria station. Southern will run a revised service on the rest of the network, but the Gatwick Express service will not run at all. Travel by train between London, Gatwick Airport and the coast will still be possible, from London Bridge or London Blackfriars using Southern or Thameslink trains. Work to a bridge over the River Arun means parts of the Horsham line will close for the weekend with rail replacement buses running instead, adding up to 60 minutes to the journey. Smaller projects are also taking part on some of the days across the network. A Southern and Gatwick express spokesperson said: “We're putting arrangements in place to keep passengers moving while these essential works are being done, but it will mean some passengers' journey times could be extended, or alternative routes should be used, so please check before you travel.” A summary of Easter services, rail replacement buses and alternative ticket acceptance on other operators can be found atsouthernrailway.com/easter2016. Details of journeys and train times are now available at nationalrail.co.uk For more information, contact the press office on 0203 750 2031. Govia Thameslink Railway Govia Thameslink Railway (GTR) operates Thameslink, Great Northern, Southern and Gatwick Express services as follows: • Thameslink – cross-London services between Bedford/Peterborough/Cambridge and Brighton/Horsham/Littlehampton/East Grinstead, and between Luton/St Albans and Sutton/Wimbledon/Rainham; plus services between London and Sevenoaks • Great Northern – services between London and Welwyn, Hertford, Peterborough, Cambridge and King’s Lynn • Southern – services between London and the Sussex coast (Brighton, Worthing, Eastbourne, Bognor Regis, Hastings) and parts of Surrey, Kent and Hampshire (Ashford International, Southampton, Portsmouth) • Gatwick Express – fast, non-stop direct services between Gatwick Airport and London Victoria (currently suspended during the pandemic) www.southernrailway.com, www.thameslinkrailway.com, www.gatwickexpres s.com, www.greatnorthernrail.com.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us