Waste Water REGIONS OF Wastewater treatment facility in CLIMATE ACTION Novi Knezevac Expected project CAPEX : 2’500’000 € Mandating Authority : Autonomous Province of Vojvodina Project Type : Summary This project aims to build a wastewater treatment facility as a finishing phase of connecting all households and industries to the city’s wastewater system. Location and population Novi Knezevac, Serbia 12’000 inh. Social and environmental impact Creation of a modern town with a proper wastewater disposal system; job creation; improved quality of drinking water; improved health; reduction of water pollution; pro- tection of biodiversity and improved living conditions for fish and other aquatic species. Main stakeholders Autonomous Province of Vojvodina: key stakeholder; The owner of the Project: Municipality of Novi Knezevac (administrative centre Novi Knezevac, and it’s settlements: Banatsko Arandjelovo, Djala, Filic, Majdan, Podlokanj, Rabe, Siget and Srpski Krstur); JKP 7. Oktobar (Public utility enterprise) Novi Knezevac, JKP Direkcija za izgradnju grada Novi Knezevac (Municipality Development Agen- cy); Provincial Authorities (Provincial secre- tariat for urban planning and environmental protection); and citizens (all people that are living in municipality of Novi Knezevac and downstream of Tisa River) 100 Climate Solutions Project Campaign ~ 2016 100 Climate Solutions Project Campaign ~ 2016 Project maturity ( IFC / World Bank Categories ) STAGE 4 : Permitting / Financing / Contracts STAGE 1 : Concept Development, Site identification STAGE 2 : Pre-Feasibility Studies Land concession signed STAGE 3 : Feasibility Studies Tbd STAGE 4 : Permitting / Financing / Contracts Building permits signed STAGE 5 : Engineering/Construction/Commercial Operation Tbd STAGE 1 : Concept Development, Site identification Environmental impact study Tbd Expected capacity 486’000 m3 per year Identified sources of fundings Tbd Land identified Yes STAGE 5 : Engineering / Construction / Commercial Operation Site access : Adequate road Rail access Port facilities ✓ Engineering, Procurement and Construction Contractor Tbd Technology : Operation and Maintenance Contractor Waste water stream data Tbd Yes Comments When the wastewater treatment facility starts to operate, there will STAGE 2 : Pre-Feasibility Studies be the option to utilize collected mud. This mud treated with certain chemicals would be suitable to make compost. Pre-feasibility study : Yes STAGE 3 : Feasibility Studies Feasibility study : Yes 100 Climate Solutions Project Campaign ~ 2016 100 Climate Solutions Project Campaign ~ 2016.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us