Desert Sunlight Solar Farm Plan of Development

Desert Sunlight Solar Farm Plan of Development

Stateline Solar Farm Page i September 3, 2010 Plan of Development Table of Contents Volume I 1.0 Introduction ..................................................................................................................................................1 1.1 Proponent Introduction: First Solar....................................................................................................2 1.2 Project Background.............................................................................................................................2 1.3 Type of Facility, Planned Uses, and Generation Output....................................................................3 1.4 Project Permitting and Construction Schedule...................................................................................3 1.5 Proponent’s Purpose and Need for the Project..................................................................................4 2.0 Project Description ......................................................................................................................................7 2.1 Project Study Area ..............................................................................................................................7 2.1.1 Solar Farm Site and Access Corridor ...................................................................................7 2.1.2 Transmission Corridor and Substation Interconnection Location........................................7 2.2 General Facility Description, Design, and Operations .......................................................................7 2.2.1 Existing Site Conditions.........................................................................................................7 2.2.2 Land Use Planning and Zoning ............................................................................................8 2.2.3 Geological Conditions ...........................................................................................................9 2.2.4 Hydrological Conditions ......................................................................................................10 2.2.5 Biological Resources...........................................................................................................13 2.2.6 Cultural and Paleontologic Resources ...............................................................................17 2.2.7 Project Location, Land Ownership, and Jurisdiction ..........................................................21 2.2.8 Legal Description.................................................................................................................21 2.2.9 Power Plant Facilities ..........................................................................................................22 2.2.10 First Solar Cadmium Telluride (CdTe) PV Technology......................................................22 2.2.11 PV Arrays and Combining Switchgear ...............................................................................24 2.2.12 Monitoring and Maintenance Facility ..................................................................................26 2.2.13 Meteorological Station.........................................................................................................26 2.2.14 Other Ancillary Facilities......................................................................................................27 2.2.15 Site Security and Fencing...................................................................................................27 2.2.16 Temporary Construction Facilities ......................................................................................28 2.2.17 Acreage and Dimensions of Project Facilities and Components.......................................28 2.2.18 Geotechnical Studies ..........................................................................................................28 2.2.19 Water Uses and Sources ....................................................................................................29 2.2.20 Erosion Control and Storm Water Drainage.......................................................................30 2.2.21 Vegetation Treatment and Weed Management .................................................................30 2.2.22 Waste and Hazardous Materials Management..................................................................31 2.2.23 Reusable and Recyclable Materials/PV Module Recycling...............................................32 2.2.24 Fire Protection .....................................................................................................................32 2.2.25 Electrical Components, New Equipment, and Existing System Upgrades .......................33 Copyright © 2009 - 2010 First Solar Inc. All Rights Reserved Stateline Solar Farm Page ii September 3, 2010 Plan of Development 2.2.26 Interconnection to Electrical Grid........................................................................................33 2.2.27 Spill Prevention and Containment ......................................................................................33 2.2.28 Health and Safety Program.................................................................................................35 2.3 Other Federal, State, and Local Agency Permit Requirements......................................................35 2.3.1 Federal Permits and Status.................................................................................................35 2.3.2 State Permits and Status ....................................................................................................37 2.3.3 Local Permits and Status ....................................................................................................38 2.4 Financial and Technical Capability ...................................................................................................38 3.0 Construction of Facilities..........................................................................................................................39 3.1 Design, Layout, Installation, and Construction Processes ..............................................................39 3.2 Construction and Operations Approach – Phased Project..............................................................39 3.3 Access and Transportation System, Component Delivery, Worker Access ...................................39 3.4 Construction Workforce Numbers, Vehicles, Equipment, Timeframes ...........................................39 3.5 Surveying and Staking ......................................................................................................................40 3.6 Site Preparation, Clearing, Grading, and Compaction.....................................................................41 3.6.1 Preconstruction Activities ......................................................................................................41 3.6.2 Site Preparation .....................................................................................................................41 3.6.3 Construction and Installation ..................................................................................................43 3.7 Solar Array Assembly and Construction...........................................................................................44 3.8 Gravel, Aggregate, and Concrete Needs and Sources...................................................................44 3.9 Solar Module and Electrical Construction Activities.........................................................................44 3.10 Aviation Lighting (Power Towers, Transmission).............................................................................45 3.11 Site Stabilization, Protection, and Reclamation Practices...............................................................45 4.0 Related Facilities and Systems................................................................................................................47 4.1 Transmission System Interconnect ..................................................................................................47 4.1.1 Existing Transmission System............................................................................................47 4.1.2 Proposed Transmission System .........................................................................................47 4.1.3 Ancillary Facilities and Substations ....................................................................................48 4.1.4 Status of Power Purchase Agreements (PPAs).................................................................48 4.1.5 General Design and Construction Standards.....................................................................48 4.2 Gas Supply Systems.........................................................................................................................48 4.3 Other Related Systems.....................................................................................................................48 4.3.1 Communications System Requirements ............................................................................48 Copyright © 2009 - 2010 First Solar Inc. All Rights Reserved Stateline Solar Farm Page iii September 3, 2010 Plan of Development 5.0 Operations and Maintenance ...................................................................................................................49 5.1 Operation and Facility Maintenance Needs .....................................................................................49

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    66 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us