TYRE District WATER Assessment*

TYRE District WATER Assessment*

TYRE district WATER assessment* Existing Returned Village Available Damage Needs Families Families Capacity -Primary Network 200m -Secondary Network Arzoun 1 Water Tank 400m -Network repair (N/A) (N/A) -Water Tank partially Damaged. -2Water Tanks -Water network Bustan -Water available damaged in one area Electrical power (N/A) (N/A) -1water pump -water network -1generator -2water tanks 900m damaged -Water network Jibal Alboutom -1water source repair Jibyne -1water tank (N/A) (N/A) (N/A) (N/A) -2water tanks -1water -water network -1Water Mahlousieh source(private) partially damaged generator Kahirri -1water tank (N/A) (N/A) (N/A) (N/A) -1water tank damaged -water network -2water tanks damaged(the -Electrical power Barrish -1water source station) (N/A) (N/A) -2water tanks No Damage (N/A) (N/A) Bazourieh reported -Electrical power -2water tanks No Damage (N/A) (N/A) Bedias -1water source reported -Electrical power -Water network (N/A) (N/A) Borj shamali -2water tanks partially damaged -Fuel -Water network (N/A) (N/A) -2water tanks partially damaged -Water network Borj rahal -1water source 200m repair -3water tanks -6 tanks totally -Fuel, water (N/A) (N/A) Jouya damaged tanks. -Network repair -1 water tank -water network partially -Generator Hanaweh -1Generator damaged maintenance (N/A) (N/A) -Main line (residential) not operational -Main Network 20m damage -2water tanks -Internal Network 200m -Network repair Dibaal -1water source damage -Electrical power (N/A) (N/A) -Water network Shaityeh operational (N/A) (N/A) -Water network -Water network needs operational maintenance Yanouh (N/A) -water tank (N/A) (N/A) -1water tank -1water source -water 90% -water network -Fuel for the Mansouri available partially damaged Generators (N/A) (N/A) -1water tank -Water network Atoulyeh operational (N/A) (N/A) -Network repair -Water source Dayr Kanoun -1water tank -Secondary network maintenance Naher -1water source 600m damage -Electrical power 200 170 -Main network (N/A) (N/A) -2water tanks 300m damage Dayr K. Ras ( surrounded by -Secondary network -Network repair alEin cluster bombs) 200m damage -Water source -1water tank -Secondary network -Network repair (N/A) (N/A) Dayr Kayfa -water source 150m damage. -Electrical power Ribkeen - Main network 1000m -Network repair -1Water source damage -Electrical power (N/A) (N/A) Salaa -2Water tanks (N/A) -Water source (N/A) (N/A) -2Water tanks -water pump not -Maintenance for Shhour -1Water source operational the water pump (N/A) (N/A) -1Water tank -Main network -Secondary network Shamaa operational not operational -Network repair (N/A) (N/A) - Main network 1000m damage -Secondary network Shahabieh damaged but being -1water tank repaired -Network repair (N/A) (N/A) -water tank partially -1water tank damaged -Main & Secondary network partially Shihiine damaged. -Network repair (N/A) (N/A) - Main network 5000m damage -Secondary network Sidikine -2Water tanks 70000m damage - Network repair (N/A) (N/A) -Network repair (N/A) (N/A) -Water network -150KVA Srifa -2Water tanks damaged generator -2Water tanks (N/A) (N/A) -Water network Tayr Harfa operational (N/A) (N/A) (N/A) (N/A) Borghliee (N/A) (N/A) (N/A) Aljibin (N/A) (N/A) (N/A) (N/A) (N/A) Shknanieh (N/A) (N/A) (N/A) (N/A) (N/A) Bafleh (N/A) (N/A) (N/A) (N/A) (N/A) Existing Village Available Damage Needs Families Returned IDPs Capacity - Main network -Network operational except for maintenance Tayr Fleh -1Water source minor problems -Electrical power (N/A) (N/A) - Main network 100m damage -Secondary network -Network repair Aitite -3Water tanks 2500m damage -1Generator (N/A) (N/A) - Main network partially damaged -Maintenance for -4Water tanks -water pump not the water pump Ain Ebl -1Water source operational -Network repair (N/A) (N/A) -1Water tank -Main network -Secondary network Kana operational not operational -Network repair (N/A) (N/A) - Main network 1000m damage -Secondary network damaged but being Klayle -5water tank repaired -Network repair (N/A) (N/A) -1water tank - Main network 100m damage -Network repair Majadel -1Generator (N/A) (N/A) - Main network 5000m damage -Secondary network Majdel zoun -2Water tanks 70000m damage - Network repair (N/A) (N/A) -Network repair (N/A) (N/A) -Water network -150KVA Mahroune -1Water tanks damaged generator -2Water tanks - Main network not (N/A) (N/A) Marwaheen -1Water source operational. -Network repair - Main network -Network -1Water source operational except for maintenance Mazraa Meshref -1Water tank minor problems -Electrical power (N/A) (N/A) -Network repair Maarakeh -4Water tanks (N/A) -1Generator (N/A) (N/A) - Main network -1Water tanks operational except Yareen -1Water source for minor problems -Network repair (N/A) (N/A) TYRE district includes 70 villages and 57 Municipalities Total # of assessed villages: 42 villages *UNICEF assessment team *Municipalities official information .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    5 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us