TYRE district WATER assessment* Existing Returned Village Available Damage Needs Families Families Capacity -Primary Network 200m -Secondary Network Arzoun 1 Water Tank 400m -Network repair (N/A) (N/A) -Water Tank partially Damaged. -2Water Tanks -Water network Bustan -Water available damaged in one area Electrical power (N/A) (N/A) -1water pump -water network -1generator -2water tanks 900m damaged -Water network Jibal Alboutom -1water source repair Jibyne -1water tank (N/A) (N/A) (N/A) (N/A) -2water tanks -1water -water network -1Water Mahlousieh source(private) partially damaged generator Kahirri -1water tank (N/A) (N/A) (N/A) (N/A) -1water tank damaged -water network -2water tanks damaged(the -Electrical power Barrish -1water source station) (N/A) (N/A) -2water tanks No Damage (N/A) (N/A) Bazourieh reported -Electrical power -2water tanks No Damage (N/A) (N/A) Bedias -1water source reported -Electrical power -Water network (N/A) (N/A) Borj shamali -2water tanks partially damaged -Fuel -Water network (N/A) (N/A) -2water tanks partially damaged -Water network Borj rahal -1water source 200m repair -3water tanks -6 tanks totally -Fuel, water (N/A) (N/A) Jouya damaged tanks. -Network repair -1 water tank -water network partially -Generator Hanaweh -1Generator damaged maintenance (N/A) (N/A) -Main line (residential) not operational -Main Network 20m damage -2water tanks -Internal Network 200m -Network repair Dibaal -1water source damage -Electrical power (N/A) (N/A) -Water network Shaityeh operational (N/A) (N/A) -Water network -Water network needs operational maintenance Yanouh (N/A) -water tank (N/A) (N/A) -1water tank -1water source -water 90% -water network -Fuel for the Mansouri available partially damaged Generators (N/A) (N/A) -1water tank -Water network Atoulyeh operational (N/A) (N/A) -Network repair -Water source Dayr Kanoun -1water tank -Secondary network maintenance Naher -1water source 600m damage -Electrical power 200 170 -Main network (N/A) (N/A) -2water tanks 300m damage Dayr K. Ras ( surrounded by -Secondary network -Network repair alEin cluster bombs) 200m damage -Water source -1water tank -Secondary network -Network repair (N/A) (N/A) Dayr Kayfa -water source 150m damage. -Electrical power Ribkeen - Main network 1000m -Network repair -1Water source damage -Electrical power (N/A) (N/A) Salaa -2Water tanks (N/A) -Water source (N/A) (N/A) -2Water tanks -water pump not -Maintenance for Shhour -1Water source operational the water pump (N/A) (N/A) -1Water tank -Main network -Secondary network Shamaa operational not operational -Network repair (N/A) (N/A) - Main network 1000m damage -Secondary network Shahabieh damaged but being -1water tank repaired -Network repair (N/A) (N/A) -water tank partially -1water tank damaged -Main & Secondary network partially Shihiine damaged. -Network repair (N/A) (N/A) - Main network 5000m damage -Secondary network Sidikine -2Water tanks 70000m damage - Network repair (N/A) (N/A) -Network repair (N/A) (N/A) -Water network -150KVA Srifa -2Water tanks damaged generator -2Water tanks (N/A) (N/A) -Water network Tayr Harfa operational (N/A) (N/A) (N/A) (N/A) Borghliee (N/A) (N/A) (N/A) Aljibin (N/A) (N/A) (N/A) (N/A) (N/A) Shknanieh (N/A) (N/A) (N/A) (N/A) (N/A) Bafleh (N/A) (N/A) (N/A) (N/A) (N/A) Existing Village Available Damage Needs Families Returned IDPs Capacity - Main network -Network operational except for maintenance Tayr Fleh -1Water source minor problems -Electrical power (N/A) (N/A) - Main network 100m damage -Secondary network -Network repair Aitite -3Water tanks 2500m damage -1Generator (N/A) (N/A) - Main network partially damaged -Maintenance for -4Water tanks -water pump not the water pump Ain Ebl -1Water source operational -Network repair (N/A) (N/A) -1Water tank -Main network -Secondary network Kana operational not operational -Network repair (N/A) (N/A) - Main network 1000m damage -Secondary network damaged but being Klayle -5water tank repaired -Network repair (N/A) (N/A) -1water tank - Main network 100m damage -Network repair Majadel -1Generator (N/A) (N/A) - Main network 5000m damage -Secondary network Majdel zoun -2Water tanks 70000m damage - Network repair (N/A) (N/A) -Network repair (N/A) (N/A) -Water network -150KVA Mahroune -1Water tanks damaged generator -2Water tanks - Main network not (N/A) (N/A) Marwaheen -1Water source operational. -Network repair - Main network -Network -1Water source operational except for maintenance Mazraa Meshref -1Water tank minor problems -Electrical power (N/A) (N/A) -Network repair Maarakeh -4Water tanks (N/A) -1Generator (N/A) (N/A) - Main network -1Water tanks operational except Yareen -1Water source for minor problems -Network repair (N/A) (N/A) TYRE district includes 70 villages and 57 Municipalities Total # of assessed villages: 42 villages *UNICEF assessment team *Municipalities official information .
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages5 Page
-
File Size-