1 Introduction

1 Introduction

Final Terms of Reference for The Proposed Sapangar Bay Container Port Development, Sabah TABLE OF CONTENTS 1 INTRODUCTION........................................................................................1 1.1 Project Initiator .........................................................................................1 1.2 EIA Consultant..........................................................................................1 1.2.1 Supporting Laboratory .............................................................................1 1.2.2 Hydraulic Consultant................................................................................2 1.2.3 Purpose of Terms of Reference ................................................................4 1.2.4 S-EIA Study Guidelines.............................................................................5 2 BACKGROUND INFORMATION.................................................................6 2.1 The Project ...............................................................................................6 2.2 Borrow Area............................................................................................13 2.2.1 Land........................................................................................................13 2.2.2 Sea..........................................................................................................13 2.2.3 Reclamation Works.................................................................................14 2.3 Project Activities.....................................................................................14 2.4 Description of the project site.................................................................15 2.5 Project Status .........................................................................................18 3 SCOPE OF WORKS FOR THE SPECIAL EIA STUDY ...............................20 3.1 Key environmental Issues ......................................................................20 3.2 Methodology Of Impacts Identification and Prediction...........................22 (A) Physical Issues.......................................................................................22 3.2.1 Hydraulic Study Description...................................................................22 3.2.2 Baseline Water Quality ...........................................................................31 3.2.3 Baseline Air Quality ................................................................................32 3.2.4 Noise level ..............................................................................................33 (B) Biological System...................................................................................35 3.2.5 Habitat and Marine Biodiversity..............................................................35 3.2.6 Benthic Biology ......................................................................................35 3.2.7 Marine Habitat Survey.............................................................................35 3.2.8 Terrestrial Habitat...................................................................................38 (C) Socio-Economic System.........................................................................39 ERM Borneo Sdn Bhd i Final Terms of Reference for The Proposed Sapangar Bay Container Port Development, Sabah 3.2.9 Land use and Development....................................................................39 3.2.10Social System and Organisation.............................................................39 3.2.11Economic Impacts ..................................................................................40 3.2.12Utilities and Amenities............................................................................40 3.2.13Land Traffic Study ..................................................................................41 3.2.14Marine Navigation Study.........................................................................42 3.2.15Aesthetic and Cultural ............................................................................43 3.2.16Archaeological Value..............................................................................43 3.2.17Socio-Economic Approach and Methodology ........................................44 3.2.18Rapid Impact Assessment Matrix ...........................................................45 3.2.19Project Abandonment.............................................................................46 3.2.20Summary of Methods for Assessment Of Impacts..................................47 3.3 Mitigating Measures................................................................................48 3.3.1 Physical Issues.......................................................................................48 3.3.2 Ecology Issues .......................................................................................48 3.3.3 Socio-Economic Issues ..........................................................................48 3.4 Residual Impacts ....................................................................................48 3.5 Environmental Management and Monitoring Plan ..................................48 3.5.1 Overall Monitoring and Management Strategy........................................49 3.5.2 Environmental Audit...............................................................................50 3.6 Authorities to be consulted ....................................................................50 4 WORK SCHEDULE..................................................................................51 ERM Borneo Sdn Bhd ii Final Terms of Reference for The Proposed Sapangar Bay Container Port Development, Sabah List of Figures Figure 2-1 Wharf and reclamation of Phase I .....................................................7 Figure 2-2 Wharf and reclamation of Phase II .................................................... 8 Figure 2-3 Wharf and reclamation of Phase III ...................................................9 Figure 2-4 Wharf and reclamation of Phase IV................................................. 10 Figure 2-5 Layout of Proposed Container Port ................................................. 12 Figure 2-6 Overview of the Project Location, 10km North of Kota Kinabalu on the South West side of Sapangar Bay .............................................16 Figure 2-7 West Coast of Sabah Shoreline Management Plan, Sapangar Bay ... 17 Figure 3-1 Proposed bathymetry survey area...................................................24 Figure 3-2 Water quality sampling locations....................................................25 Figure 3-3 Existing and Planned Current Data for Model Calibration- Verification. ...................................................................................27 Figure 3-4 Marine Hydraulic Model Area..........................................................28 Figure 3-5 Location of Noise and Air Monitoring stations ..................................34 Figure 3-6 Proposed Coral Reef and Stationary Monitoring Stations..................37 List of Tables Table 1-1 Special-EIA Study Team Members........................................................... 3 Table 2-1 Project Activities...................................................................................15 Table 2-2 Industries found within the project vicinity .................................................18 Table 3-1 List of Environmental Key Issues to be studied..........................................21 Table 3-2 Parameters and Location of Water Sampling. ............................................32 Table 3-3 Summary of Assessment Methods ..........................................................47 List of Appendices Appendix 1 CVs of The Study Team Members Appendix 2 Correspondence from ECD Appendix 3 TOR Review Comments Appendix 4 Minutes of Meeting with DID Appendix 5 Relevant correspondence and Approval ERM Borneo Sdn Bhd iii Final Terms of Reference for The Proposed Sapangar Bay Container Port Development, Sabah 1 INTRODUCTION 1.1 Project Initiator The project proponent for this development is Sabah Ports Authority and the principal contact in respect to the project is: SABAH PORTS AUTHORITY 4th Floor, SPA Headquarters Bldg Jalan Tun Fuad Stephens, Tanjung Lipat 88617 Kota Kinabalu, Sabah Tel: 088-256 155 Fax: 088-243 284 Contact Person: Encik Ramli Amir (General Manager) 1.2 EIA Consultant The consultant for the Special-EIA study is: ERM Borneo Sdn Bhd (A subsidiary of Environmental & Risk Management Sdn Bhd) Suite 8, 10th Floor, Wisma Perindustrian Jalan Istiadat, Likas 88400 Kota Kinabalu, Sabah Tel: 088- 247 573 Fax: 088-266 572 K. L. Office: Suite 22.03-22.04, 22nd Floor, Plaza 138 No 138, Jalan Ampang 50450 Kuala Lumpur Tel: 03-2164 6037 Fax: 03-2164 9777 Contact Person: Mr. Rod McBride (Managing Director) 1.2.1 Supporting Laboratory Chemical and analytical services for water, air and noise quality monitoring has been provided by: Environmental Science (M) Sdn Bhd No 38, Jalan Tembaga SD 5/2H Bandar Sri Damansara, 52200, Kuala Lumpur Tel: 03-62736013 Fax: 03-62759325 Contact Person: Ms Felicia Choo/Mr. Zulkifli Ahmad ERM Borneo Sdn Bhd 1 Final Terms of Reference for The Proposed Sapangar Bay Container Port Development, Sabah 1.2.2 Hydraulic Consultant The hydraulic field work and modelling has been conducted by: Danish Hydraulic Institute Suite 10, 8th Floor, Wisma Perindustrian Jalan Istiadat, Likas 88400 Kota Kinabalu, Sabah Tel: 088-260780 Fax: 088-260781 Contact

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    54 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us