31-58-23/4,, SFLAT NO.202, SRI MAHALAKSHMI TOWERS, KURMANNAPALEM GAJUWAKA, VISAKHAPATNAM, ANDHRA, Pin-530046, Ph.No-592553

31-58-23/4,, SFLAT NO.202, SRI MAHALAKSHMI TOWERS, KURMANNAPALEM GAJUWAKA, VISAKHAPATNAM, ANDHRA, Pin-530046, Ph.No-592553

ANDHRA PRADESH INDUSTRIAL INFRASTRUCTURE CORPORATION LTD (A Government of Andhra Pradesh Undertaking) Provisional Allotment Letter Lr. No: 19550/APIIC/APIIC_ATCHUTAPURAM_APSEZ/SPECIAL PROJECTS/2017 Date: 03/11/2017 To M/S. MANI INDUSTRIES 31-58-23/4,, SFLAT NO.202, SRI MAHALAKSHMI TOWERS, KURMANNAPALEM GAJUWAKA, VISAKHAPATNAM, ANDHRA, Pin-530046, Ph.No-592553. Dear Sir, Sub:- APIIC Limited - SPECIAL PROJECTS – Allotment of Land to M/S. MANI INDUSTRIES measuring AC.0.21 / 876 Sqmts in PLOT NO. 27A42A3 in APSEZ APIIC_ATCHUTAPURAM_APSEZ Provisional Allotment Orders - Issued - Reg. Ref: Your Online Application No:19550 dated:14-OCT-2017 filed ONLINE. * * * * * * * * With reference to your application cited, you are hereby allotted land admeasuring to an extent of AC.0.21 / 876 Sqmts.in plot No 27A42A3 APSEZ at APIIC_ATCHUTAPURAM_APSEZ Mandal of Visakhapatnam District on “AS IS WHERE IS BASIS” for manufacturing of Engineering 'on lease basis for a period of 33 (THIRTY THREE) YEARS , subject to the following terms & conditions of lease deed. 1. The “LEASE PREMIUM” for the land is fixed at Rs. 1,949.00 per Sq.Mt. The said rate excludes the cost of Effluents Conveyance, CETP, Marine out fall, Sewerage etc. The total “LEASE PREMIUM” for 876 Sq. Mts / Ac. 0.21 works out to Rs. 17,07,324.00 ( Seventeen Lakh Seven Thousand Three Hundred and Twenty Four Rupees only). 2. You should pay the total “LEASE PREMIUM” of Rs. 17,07,324.00 ( Seventeen Lakh Seven Thousand Three Hundred and Twenty Four Rupees only). within 90 DAYS from the date of receipt of this letter minus Rs. 0.00 already paid towards EMD.Besides the Lease Premium you should pay an amount of Rs. 43,800.00 towards special impact fee since towards CSR.Therefore, total amount payable to APIIC is Rs. 17,51,124.00. 3. All payments against this allotment shall be made to the APIIC Head Office / Zonal Office concerned , by way of a crossed Demand Draft drawn in favour of APIIC Limited or through Online Transaction (RTGS / NEFT). 4. If payment as stipulated in the condition No. (2) above is not made within 90 DAYS of receipt of this allotment letter, this allotment shall stands CANCELLED automatically and the EMD paid shall remain FORFEITED as per APIIC Allotment Regulations. You may, before expiry of the 90 DAYS period, seek time for making payment duly giving reasons for such request. In such a case corporation may grant further period of 90 DAYS for making such payment. Interest at the prescribed rate / 16% shall be levied on the payments made after 90 DAYS . No application for extension of time and no payments beyond 180 DAYS will be entertained. In case of failure to make the payment within this extended period along with the applicable interest, the allotment shall stand cancelled automatically and EMD paid shall be forfeited as per APIIC Allotment Regulations. 5. Any application for extension of time, for project implementation shall be examined as per the Allotment Regulations of APIIC, as amended from time to time. However, mere making of an application for such extension does not guarantee any extension of time and does not absolve the applicant of its obligations as per this provisional allotment letter. 6. You should file the necessary documents such as Project Report, Memorandum and Articles of Association, Incorporation Certificate, Board Resolution, IEM Registration Certificate, Certificated stating Present Directors and Share Holders and their percentage of Share Holding duly certified by the Chartered Accountant etc. before execution of lease deed. 7. a) You should pay annual lease rentals @ Percent 2% on the total lease premium which works out to Rs. 35,022.48 per annum for the land allotted in your favour commencing from the date of taking possession of the land.The Annual Lease Rent will be enhanced by 5% every year on the 2% of the Annual Lease Rentals on cumulative basis. b) The annual lease rentals shall be paid in advance ie., on or before by 15th of April of every year.If not paid interest will be charged @ 16% p.a.The “LEASE PREMIUM” and “ANNUAL LEASE RENTALS” will be charged based on the actual measurements of the area taken possession. c) The Development Charges for WATER requirement up to 10 KL per day per acre is included in the above charges. For Additional Water requirement over and above 10 KL per day/per Acre, you have to pay Additional Development Charges @ Rs. 15,000.00 for each Additional One (1) KL per day.However, water connection charges, including Security Deposits, Water Meter cost and Road Cutting Charges etc., and subsequent Monthly Water Consumption Charges shall be borne by you. d) APIIC will provide 33/11 KV Power line upto the site. If more power is required, the allottee shall bear the Development Cost of power supply including Line Charges / Power Corridor Area / Sub- Station etc., The present cost of water is Rs40/- per 1KL. 8. The land shall be utilized for the purpose for which it is allotted, but not for any other activity. You shall fulfill the Export obligations envisaged in the LETTER OF APPROVAL (LOA) accorded by the Development Commissioner of SEZ. Failure on your part in this regard will entail cancellation of allotment and resumption of the Plots/Land allotted to you. 9. On request of the allottee, the Lease can be extended for a further period of 33 YEARS on payment of Yearly Rent and charges as may be determined by APIIC (developer). 10. On payment of “LEASE PREMIUM” you shall enter in to a LEASE DEED on appropriate stamp duty as per the Stamps & Registration Act within one month period from the date of payment of total lease premium and take possession of the land allotted immediately. 11. You should start construction activity within three 3 MONTHS of handing over possession of land duly obtaining necessary statutory approvals/permissions building plans approval etc., clearance from APIIC IALA, Fire services, Airport, APPCB and from any other competent authorities by paying necessary fee as per applicable norms from time to time to the concerned statutory bodies and commence the production/manufacturing activity within two 2 YEARS 12. Property tax or any other statutory payments/charges when demanded by the respective Statutory Bodies shall be paid by you from the date of handing over possession of land. 13. Power is supplied to the units by the Distribution Authority concerned at their terms and conditions and APIIC (Developer of SEZ ) is not responsible in case of any power failure/outages. 14. You should obtain water connection to your unit from the APIIC Limited at approved terms and conditions and to pay the consumption charges accordingly. 15. You should make all arrangements for proper disposal of Garbage/Waste at regular intervals and keep the premises inside and outside clean and hygienic. 16. You shall pay Land Use Conversion Charges, Layout Approval Charges to the concerned Local Bodies, as the case may be, and any and all charges to respective departments that may arise before, during and after the development of the SEZ facility in the land allotted. 17. You should maintain Greenery/Avenue plantation as required under the provisions of MoEF, GoI / State Pollution control board. 18. Cancellation of Letter of Permission (LOP) by the Development Commissioner of SEZ for any reason whatsoever will entail automatic cancellation of Letter of Allotment (LoA) or premises and vice versa. 19. You shall at your own risk, account and cost, apply for and obtain approval for your unit from the designated authorities as laid down in this regard by the Government of India / State Government / Local Bodies. 20. You should not Transfer, Assign, Underlet, Sub-Let, Mortgage, Sub-Lease or give on license or otherwise deal with or part with possession of the allotted land or any part thereof during the tenure of lease. 21. This allotment and occupancy of the land is subject to adherence to the directives issued by the State Board for Prevention and Control of Water and Air Pollution. 22. Please note that the EMD amount paid by the allottee, if any, will be forfeited as per APIIC rules in vogue if the terms and conditions stipulated in the allotment letter are not complied with. 23. APIIC reserves the right to appropriate the money paid by the Company or standing to its credit towards any outstanding dues payable by it on any account whatsoever. “Payments made by the company shall be adjusted first towards (penal) interest and balance, if any towards principle outstanding on any accounts. 24. Any environmental clearances required shall have to be obtained by the allottee at their own cost. 25. You should provide employment in your industry for the eligible land losers, which are effected by APSEZ Project. 26. This allotment of land is subject to compliance of all rules, regulations, terms and conditions of allotment of APIIC imposed from time to time, terms and conditions of lease deed all other terms and conditions of SEZ Act 2005, Rules of 10th Feb. 2006 and AP State SEZ Act (which is under assent of President of India). 27. The allottee shall obtain Consent for Establishment (CFE), Consent for Operation (CFO) from Andhra Pradesh Pollution Control Board (APPCB) under the Air (Prevention and Control of Pollution) Act, 1981 as well as Water (Prevention & Control of Pollution) Act, 1974. 28. Allottee shall comply all the time with applicable environmental standards stipulated by statutory authorities and shall aware of any new modifications in the standards / notifications etc., In case of non-compliance, APIIC shall have the right to close the operations of the industries Allottee shall document all environmental activities with proper attestation all the time.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    7 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us