Testimony of David A. Schlissel and Peter J. Lanzalotta On

Testimony of David A. Schlissel and Peter J. Lanzalotta On

THE CONNECTICUT SITING COUNCIL DOCKET NO. 272 The Connecticut Light and Power Company and the United Illuminating Company Application for a Certificate of Environmental Compatibility and Public Need for the Construction of a New 345-kV Electric Transmission Line and Associated Facilities between the Scovill Rock Switching Station in Middletown and the Norwalk Substation in Norwalk, Connecticut Testimony of David A. Schlissel And Peter J. Lanzalotta On behalf of The Towns of Bethany, Cheshire, Durham, Easton, Fairfield, Hamden, Middlefield, Milford, North Haven, Norwalk, Orange, Wallingford, Weston, Westport, Wilton, and Woodbridge, Connecticut May 25, 2004 1 Q. Mr. Schlissel, please state your name, position and business address. 2 A. My name is David A. Schlissel. I am a Senior Consultant at Synapse Energy 3 Economics, Inc., 22 Pearl Street, Cambridge, MA 02139. 4 Q. Mr. Lanzalotta, please state your name, position and business address. 5 A. My name is Peter J. Lanzalotta. I am a Principal with Lanzalotta & Associates 6 LLC, (“Lanzalotta”) 9762 Polished Stone, Columbia, Maryland 21046. 7 Q. On whose behalf are you testifying in this case? 8 A. We are testifying on behalf of the Towns of Bethany, Cheshire, Durham, Easton, 9 Fairfield, Hamden, Middlefield, Milford, North Haven, Norwalk, Orange, 10 Wallingford, Weston, Westport, Wilton and Woodbridge, Connecticut (the 11 "Towns"). 12 Q. Mr. Schlissel, please summarize your educational background and recent 13 work experience. 14 A. I graduated from the Massachusetts Institute of Technology in 1968 with a 15 Bachelor of Science Degree in Engineering. In 1969, I received a Master of 16 Science Degree in Engineering from Stanford University. In 1973, I received a 17 Law Degree from Stanford University. In addition, I studied nuclear engineering 18 at the Massachusetts Institute of Technology during the years 1983-1986. 19 Since 1983, I have been retained by governmental bodies, publicly-owned 20 utilities, and private organizations in 24 states to prepare expert testimony and 21 analyses on engineering and economic issues related to electric utilities. My 22 clients have included the Staff of the California Public Utilities Commission, the 23 Staff of the Arizona Corporation Commission, the Staff of the Kansas State 24 Corporation Commission, the Arkansas Public Service Commission, municipal 25 utility systems in Massachusetts, New York, Texas, and North Carolina, and the 26 Attorney General of the Commonwealth of Massachusetts. I am currently a 27 Senior Consultant at Synapse Energy Economics. 1 1 I have testified before state regulatory commissions in Connecticut, Arizona, New 2 Jersey, Kansas, Texas, New Mexico, New York, Vermont, North Carolina, South 3 Carolina, Maine, Illinois, Indiana, Ohio, Massachusetts, Missouri, and Wisconsin 4 and before an Atomic Safety & Licensing Board of the U.S. Nuclear Regulatory 5 Commission. 6 A copy of my current resume is attached as Exhibit SL-1. 7 Q. Please describe Synapse Energy Economics. 8 A. Synapse Energy Economics ("Synapse") is a research and consulting firm 9 specializing in energy and environmental issues, including electric generation, 10 transmission and distribution system reliability, market power, electricity market 11 prices, stranded costs, efficiency, renewable energy, environmental quality, and 12 nuclear power. 13 Q. Mr. Lanzalotta, please summarize your educational background and recent 14 work experience. 15 A. I am a graduate of Rensselaer Polytechnic Institute, where I received a Bachelor 16 of Science degree in Electric Power Engineering. In addition, I hold a Masters 17 degree in Business Administration with a concentration in Finance from Loyola 18 College in Baltimore. 19 I am currently a Principal of Lanzalotta & Associates LLC, which was formed in 20 January 2001. Prior to that, I was a partner of Whitfield Russell Associates, with 21 which I had been associated since March 1982. My areas of expertise include 22 electric system planning and operation, cost of service, and utility rate design. I 23 am a registered professional engineer in the states of Maryland and Connecticut. 24 In particular, I have been involved with the planning and operation of electric 25 utility systems as an employee of and as a consultant to a number of privately- 26 and publicly-owned electric utilities over a period exceeding twenty-eight years. 27 I have presented expert testimony before the FERC and before regulatory 28 commissions and other judicial and legislative bodies in 16 states, the District of 2 1 Columbia, and the Provinces of Alberta and Ontario. My clients have included 2 utilities, regulatory agencies, ratepayer advocates, independent producers, 3 industrial consumers, the United States Government, and various city and state 4 government agencies. 5 A copy of my current resume is included as Exhibit SL-2. 6 Q. Mr. Schlissel, have you filed testimony in support of the construction of a 7 new high voltage transmission line? 8 A. Yes. I filed testimony before the West Virginia Public Service Commission in 9 March 1998 supporting Appalachian Power Company's proposal to build a 765- 10 kV transmission line from West Virginia to Virginia. My support of that 11 transmission line was based on my review of Company and consultant analyses 12 which showed that the line was needed to enable the Company to adequately and 13 reliably serve the needs of customers in its Eastern/Southern service areas. 14 Q. Mr. Lanzalotta, have you ever filed testimony in support of the construction 15 of a new high voltage transmission line? 16 A. Yes. I filed testimony in 1992 before the Public Utilities Commission of Hawaii 17 in which I supported the construction of a double-circuit 138-kV transmission 18 line. 19 Q. What is the purpose of your testimony? 20 A. Synapse and Lanzalotta were retained by the Towns to evaluate the length of the 21 proposed Middletown to Norwalk Project that could be installed underground and 22 to examine whether there are technically viable alternatives to the Project. This 23 testimony presents the results of our review of the materials on these issues filed 24 by Connecticut Light & Power Company and United Illuminating Company. (“the 25 Applicants”) We will file testimony on July 19, 2004 that will present our 26 conclusions on undergrounding issues and on the viability of alternatives to the 27 proposed Middletown to Norwalk Project. 3 1 Q. Please explain how you conducted your analyses. 2 A. We originally reviewed the Applicants’ Municipal Consultation Filing and 3 prepared comments that the Town of Durham submitted to the Company in June 4 2003. Since that time we have reviewed the Applicants’ October 9, 2003 5 Application to the Siting Council, the Applicants’ December 16, 2003 6 Supplemental Filing, and Addenda Nos. 1, 2, and 3 to that Supplemental Filing. 7 We also have reviewed the testimony and studies submitted in support of the 8 Application, the Supplemental Filing and the three Addenda. 9 The Towns also have submitted interrogatories to the Applicants and to ISO-NE. 10 We have reviewed the responses to that discovery and to questions submitted by 11 the Attorney General and the Siting Council. In addition, we have reviewed 12 regional transmission studies. Finally, we have undertaken, but not yet completed, 13 load flow studies to examine whether there are viable alternatives to the 14 Applicants’ proposed Middletown to Norwalk Project. 15 Q. Please summarize your conclusions. 16 A. We have reached the following conclusions at this time: 17 1. The Siting Council should not reject the possibility that there could be a 18 technically feasible East Shore Alternative based upon the results of the 19 load flow studies submitted by the Applicants. 20 2. The Siting Council should not reject the possibility that additional 21 underground cable could be installed in Segment 1 and/or 2 Towns based 22 upon the studies submitted to date by the Applicants. 23 Q. Do you agree that the transmission system needs reinforcement to ensure 24 adequate system capability and reliability to serve customer demands in 25 Southwest Connecticut? 26 A. Yes. Based on our familiarity with the transmission system in Southwest 27 Connecticut from earlier studies and our review of the analyses provided in this 4 1 proceeding, we believe that additional reinforcement of the transmission system is 2 necessary to ensure adequate system capability and reliability. 3 The Applicants’ East Shore Route Load Flow Studies 4 Q. Please describe the East Shore Route studied by the Applicants. 5 A. In response to concerns raised by the Town of Wallingford, the Applicants have 6 studied an East Shore Route for its proposed Beseck to East Devon 345-kV line. 7 This East Shore Route would use the existing ‘387’ line from Wallingford to the 8 East Shore substation. A new 345-kV line would be built from East Shore to East 9 Devon. The East Shore Route studied by the Applicants also included some 10 reconfiguring of the East Shore substation and, in some cases, the reconductoring 11 of a portion of the ‘387’ line to enable the line to carry more power. 12 Q. What is the Applicants’ conclusion concerning the East Shore Route they 13 studied? 14 A. They have rejected the East Shore Route as a viable alternative to their proposed 15 Middletown to Norwalk Project. This rejection appears to have been based on the 16 load flow studies that the Applicants commissioned from PowerGEM. 17 Q. Should the Siting Council reject the concept of an East Shore Alternative to 18 the proposed Middletown to Norwalk Project based on the results of the East 19 Shore Route load flow studies presented by the Applicants in Addenda Nos. 20 1, 2, and 3 to their December 16, 2003 Supplemental Filing? 21 A. No. The Applicants have studied only a very limited version of an East Shore 22 Alternative.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    55 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us