Final Overpass Road Route Study

Final Overpass Road Route Study

Final Overpass Road Route Study From Old Pasco Road to Fort King Road Pasco County Prepared for: Pasco County Engineering Services Department Work Order Number C6463.00 Work Order Number C6463.20 March 2005 URSCorporation Southern 7650 West CourtneyCampbell Caauseway Tampa, Florida 33607-14662 TABLE OF CONTENTS Section Page EXECUTIVE SUMMARY...........................................................................................ES-1 1.0 INTRODUCTION ........................................................................................................... 1-1 1.1 Purpose and Need ................................................................................................ 1-2 1.2 Project Description...............................................................................................1-2 1.3 Coordination with Other Projects ........................................................................ 1-2 2.0 EXISTING ROADWAY CONDITIONS........................................................................ 2-1 2.1 Existing Roadway Characteristics ....................................................................... 2-1 2.1.1 Typical Sections.................................................................................... 2-1 2.1.2 Pedestrian and Bicycle Facilities .......................................................... 2-1 2.1.3 Right-of-Way ........................................................................................ 2-1 2.1.4 Drainage................................................................................................ 2-1 2.1.5 Floodplains............................................................................................ 2-1 2.1.6 Soil Data................................................................................................2-2 2.1.7 Traffic ................................................................................................... 2-2 2.1.7.1 2003 Traffic Counts ............................................................ 2-2 2.1.7.2 Existing Conditions Capacity Analysis .............................. 2-3 2.1.8 Existing Crash Data .............................................................................. 2-5 2.1.9 Intersections and Signalization ............................................................. 2-6 2.1.10 Railroad Crossings................................................................................ 2-6 2.1.11 Utilities.................................................................................................. 2-6 2.1.12 Pavement Conditions............................................................................ 2-6 3.0 ENVIRONMENTAL ANALYSIS.................................................................................. 3-1 3.1 Environmental Characteristics............................................................................. 3-1 3.1.1 Land Use Data....................................................................................... 3-1 3.1.1.1 Existing Land Use............................................................... 3-1 3.1.1.2 Future Land Use.................................................................. 3-1 3.1.2 Natural Environment and Wildlife........................................................ 3-3 3.1.2.1 Existing Vegetative Communities ...................................... 3-3 3.1.2.2 Potential for Protected Species ........................................... 3-4 3.1.2.3 Protected Species................................................................ 3-8 3.1.2.4 Impacts to Natural Areas .................................................... 3-8 3.1.3 Cultural Resources.............................................................................. 3-10 3.1.3.1 Results of the Background and Field Research ................ 3-10 3.1.3.2 Conclusions....................................................................... 3-11 3.2 Physical Environment ........................................................................................ 3-12 3.2.1 Potentially Contaminated Site Survey ................................................ 3-12 3.2.2 Noise Analysis.................................................................................... 3-14 4.0 LONG-RANGE PLANNING.......................................................................................... 4-1 4.1 Land Use.............................................................................................................. 4-1 4.1.1 Future Land Use.................................................................................... 4-1 4.1.2 Future Developments............................................................................ 4-1 4.2 Traffic Projections............................................................................................... 4-2 4.2.1 Traffic Forecasts................................................................................... 4-2 4.2.2 Year 2030 Capacity Analysis................................................................ 4-3 W:\12003847_Overpass Road\Final Route Study\TOC.doc/03/31/05 i Final Overpass Road Route Study TABLE OF CONTENTS (Continued) Section Page 4.2.3 Traffic Analysis Summary.................................................................... 4-3 5.0 SAFETY/DESIGN CRITERIA....................................................................................... 5-1 5.1 Safety Improvements ........................................................................................... 5-1 5.2 Design Criteria..................................................................................................... 5-2 6.0 ALTERNATIVE ANALYSIS......................................................................................... 6-1 6.1 No-Build Concept................................................................................................ 6-1 6.2 Build Alternatives................................................................................................ 6-1 6.2.1 Project Segments................................................................................... 6-2 6.2.2 Typical Section Evaluation................................................................... 6-2 6.2.2.1 Urban Typical Section ........................................................ 6-3 6.2.3 Proposed Alternatives........................................................................... 6-4 6.2.3.1 Alternative O-1................................................................... 6-4 6.2.3.2 Alternative O-2................................................................... 6-4 6.2.3.3 Alternative O-3................................................................... 6-4 6.3 Alternative Evaluation......................................................................................... 6-5 6.3.1 Potential Business Relocations ............................................................. 6-5 6.3.2 Potential Residential Relocations ......................................................... 6-5 6.3.2.1 Alternative O-1................................................................... 6-5 6.3.2.2 Alternative O-2................................................................... 6-5 6.3.2.3 Alternative O-3................................................................... 6-7 6.3.3 Natural Environment Effects ................................................................ 6-7 6.3.3.1 Alternative O-1................................................................... 6-7 6.3.2.2 Alternative O-2................................................................... 6-7 6.3.3.3 Alternative O-3................................................................... 6-7 6.3.4 Potential Contamination Sites............................................................... 6-7 6.4 Other Alternatives Considered............................................................................. 6-7 7.0 ALTERNATIVE CONCEPTS........................................................................................ 7-1 8.0 ESTIMATED PROJECT COSTS ................................................................................... 8-1 8.1 Right-of-Way Costs............................................................................................. 8-1 8.1.1 Alternative O-1..................................................................................... 8-2 8.1.2 Alternative O-2..................................................................................... 8-2 8.1.3 Alternative O-3..................................................................................... 8-2 8.2 Estimated Construction Costs.............................................................................. 8-2 8.2.1 Estimated Wetland Mitigation Costs .................................................... 8-5 9.0 PUBLIC INVOLVEMENT............................................................................................. 9-1 9.1 Public Meeting Summary .................................................................................... 9-1 9.1.1 Public Workshop Overview.................................................................. 9-1 9.1.2 Written Comments................................................................................ 9-2 9.1.3 Second Public Workshop Overview ..................................................... 9-2 9.1.4 Written Comments................................................................................ 9-3 W:\12003847_Overpass Road\Final Route Study\TOC.doc/03/31/05 ii Final Overpass Road Route Study TABLE OF CONTENTS (Continued) Section Page

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    78 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us