SI. N am e o f the Am ount N am e of th e W ork No. (R&B) Division (Rs. In lakh) 1 2 3 4 Badakamar - PangatiraBush cutting, flank dressing, pothole repair & painting 421 Dhenkanal 10.00 trees, С Ds0/0-27/300 Aluajharana-BhalumundaBush cutting, flank dressing & painting trees, 422 Dhenkanal 5.00 CDs16/0-34/0 423 Dhenkanal Aluajharana-BhalumundaS/R from 0/0-1/800 20.00 Muktapasi-BadakamarBush cutting, flank dressing, pothole repair & painting 424 Dhenkanal 5.00 trees, CDsO/O-18/O 425 Dhenkanal S/R to Muktapasi-Badakama from 0/0 to16/800 (in stretches} 30.00 Barihapur-Basoi-Kankili-Sanda Bush cutting, flank dressing, pothole repair & 426 Dhenkanal 5.00 painting trees, CDs 0/0-19/0 427 Dhenkanal S/R toBarihapur-Basoi-Kankili-Sanda from2/300 to 17/800 (in stretches) 30.00 Kankadahad - MahabirodBush cutting, flank dressing, pothole repair & painting 428 Dhenkanal 10.00 trees, CD s 0/0-29/058 429 Dhenkanal Kankadahad - Mahabirod Road sig nages 0/0-29/058 5.00 430 Dhenkanal Pitri -Khalpal Bush cutting, flank dressing & painting trees, CDs 0/0-3/212 1.50 Dhenkanal - KamakhyanagarBush cutting, flank dressing & painting trees, 431 Dhenkanal 10.00 CDs0/0-29/256 Dhenkanal - KamakhyanagarRamial Bridge & right approach bridge (Painting 432 Dhenkanal 3.00 & repair of railing)25/550-26/00 & 26/184-26/514 433 Dhenkanal Dhenkanal - KamakhyanagarGantry Road signages0/0 & 26/500 10.00 Kamakhyanagar-KankadahadBush cutting, flank dressing, pothole repair & 434 Dhenkanal 5.00 painting trees, CDs 0/0-17/78 435 Dhenkanal Kamakhyanagar-Kankadahad Road signages 0/0-29/256 5.00 Rekula hadabhanga colony chawk to house of bharat dehury in K. Nagar 436 Dhenkanal 1.50 NACBush cutting flank dressing & painting 0/0-2/616 Batagaon-Birasal-Kalarang (Otta)Bush cutting, flank dressing, pothole repair & 437 Dhenkanal 5.00 painting trees, CDsO/O-14/75 438 Dhenkanal S/RBataqaon-Birasal-Kalarang (0tta)0/300 to 14/0 (in stretches) 25.00 439 Dhenkanal Lokanathpur-BirasalBush cutting flank dressing & painting trees, CDs 0/0-14/0 5.00 S/RLokanathpur-Birasal 0/800-0/900, 8/900-9/200, 10/100-10/280, 12/600- 440 Dhenkanal 10.00 13/100 441 Dhenkanal Lokanathpur-Birasal Road signages 0/0-14/0 5.00 Bhuban-NilakanthapuBush cutting flank dressing & painting trees, CDs 0/0- 442 Dhenkanal 1.50 3/100 443 Dhenkanal Bhuban-NilakanthapuRoad signages 0/0-3/100 3.00 NH-53 to Budheswar via Bandalo in Bhuban NACBush cutting flank dressing & 444 Dhenkanal 1.50 painting 0/0-2/700 445 Dhenkanal Sarang- BhalumundaPainting of trees & CDs. 0/0-10/40 3.00 446 Charbatia S/R to Baruan Balichandrapur Road 0.28 447 Charbatia S/R to Chhatia Kalakala Road 0.06 S/R to Barachana Balichandrapur road from 4/300 km to 6/800 km&14/200 km 448 Charbatia 3.89 to 14/600 km S/R to NH 5A at Krushnadaspur to Udayagiri 6/570 km to 7/150km,7/150 km 449 Charbatia 13.60 to 7/730km & at 0/370 km 450 Charbatia S/R to Nayasadaka Godijhar road 9.77 SI. Nam e o f the A m ount Nam e of th e W ork NO. (R&B) Division (Rs. In lakh) 1 2 3 4 451 Charbatia S/R to Khuntaka Subranapur road 9.77 452 Charbatia S/R to 0 d C.S.Road 4.89 453 Charbatia S/R to Nuntikiri Barapada road 0.02 454 Charbatia Improvement to Birupa Left to Balarpur (ULB) road 7.00 S/R to Tangi Haripur road such as construction of New Box cell culvert at 455 Charbatia 40.00 1/800 km S/R to Baramba Sankhamari road such as construction of :oe wall and boulder 456 Charbatia 1.90 packing from 3/091 km to 3/115 km (LHS) 457 Charbatia S/R to Charbatia Mangarajpur road from 0/700 km to 0/90^ km 4.49 458 Charbatia Improvement to Birupa Left to Balarpur (ULB) road 48.46 S/R to Badahula Parbatipur road such as construction of Box cell culvert 1 x 459 Angul 22.00 8m x 4.5m atch.6/730km S/R to Maimura Korab road from 0/0 to 5/0 km & Sanhula 3aikasahi via Mindol 460 Angul 0.50 road from 0/0 to 10/0 km . such as fixing of tree sticker S/R to Handapa to Gunthapada Luhamunda road via Bidising , such as 461 Angul 4.69 providing RCC culvert at 5/550km S/R to Parsumal Kishorenagar road . such as repairing flar iks and painting and 462 Angul 3.68 CDs from 0/0 to 10/00 km 463 Angul Extension of Box Cell Culvert at Ch.4/0km of Talcher Angu Border road 11.20 P/R to Kaintiragarh Daruhan road providing SDBC from 2/180 to 22/460 km 464 Angul 5.00 S/R to Ogi para Tainsi Jagannathpur road such as providi ig Box cell culvert of 465 Angul 61.00 size 2 x 6m x 4m at 22/585km S/R to Maimura Korab road . (such as construction of toe wall near humepipe 466 Angul 4.11 culvert at 2/500km & 2/800 km) S/R to Maimura Korab road . (such as construction of toe wall near humepipe 467 Angul 3.40 culvert at 1/800 to 2/200 km Periodical Renewal to Badkera Maidharpur road from С .0km to 0.200km, 468 Angul 0.500km to 2.500km, 3.0km to 4.500km, 6.0km to 8 Okm and 9.0km to 56.80 10.0km. 469 Angul S/R to Badahulla Parbatipur road from 4/930 to 6Я60 km 3.32 470 Angul S/R to Bdahula Parbatipur road single lane road from 3/37' 7 to 4/900 km 7.85 S/R to Handapa Patrapada road from 0/0 to 1/630 km sue :h as construction of 471 Angul single lane road 6.00 S/R to Handapa Luhamunda Gunthapada via Bidising road such as 472 Angul 20.81 construction of S/L road from 1/100 to 3/150 km NH-42 to Ogi Para Tainsi- Jagannathpur roadMaintenanc 9 from 0/0 to 31320 473 Angul 10.00 km 474 Angul Angul Sankhapur Karatapata roadDrain works 5.00 475 Angul Angul Sankhapur Karatapata roadMaintenance from0/0 to 18/600 km 5.00 476 Angul Saheed Manas Marg road Maintenance from 0/0 to 4/0 km 2.00 477 Angul P/Rfrom Chhendipada Jarapada road from 0/0 to 1/500 kn 20.00 478 Angul Chhendipada Jarapada road Maintenance from 0/0 to 25/C km 10.00 SI. Name of the A m ount Name of the Work No. (R&B) Division (Rs. In lakh) 1 2 3 4 479 Angul S/RAngul Ekagharia FCI road (Inter locking paving Block) from 0/500 to 1/0 km 5.00 480 Angul Angul Ekagharia FCI road Maintenance from 0/0 to 9/0 km 5.00 481 Angul Kulad Talcher roadMaintenance from 0/0 to 11/900k m 5.00 482 Angul Nuahata Maidharpur roadMaintenance from 0/0 to 18/0 km 10.00 483 Angul Kulad Gotamara roadDrain from1/250 to 1/370 km 10.00 484 Angul Kosala Korada roadMaintenance from 0/0 to 11/90 km 3.00 485 Angul Kosala Chhendipada via BrahmanibilMaintenance from 0/0 to 22/0 km 5.00 Majhika Benagadia , sanakerejang, Badakerejang Tukuda roadMaintenance 486 Angul 9,95 from 0/0 to 20/200 km Hinjagula Kadalibareni road via Gangada Dandasinga Badataila Baragotha 487 Angul 5.00 Tainisi Maintenance work from 0/0 to 18/600 km Bagedia Nuapada road via Purunagarh TangiriMaintenance work from 0/0 to 488 Angul 5.00 8/500 km Putunga to Madhapur Jungle via Thukuta Kanihanagar Para Gobindapur 489 Angul 5.00 Madhapur Maintenance work from 0/0 to 8/0 km 490 Angul Tainisi Kadalibareni road via Kothabhuin from 0/0 to 11/800 5.00 491 Angul Bagedia to Basantapur via Sapoinali workO/O to 7/0 km 10.00 492 Angul Ogi Malisahi to Jarpada road via ParaMaintenance work from 0/0 to 2/600 km 5.00 493 Angul Karadapada to MajhipadaMaintenance wor1<0/0 to 8/500 km 10.00 494 Angul Kaintaragarh to DaruaPothole Repair from 0/0 to 22/78 km 10.00 495 Angul Athamallik Town roadCD at 1/650 km 3.00 496 Angul Athamallik Town road Pothole Repair from 0/0 to 6/34 km 2.50 PHD office to Mahanadi of ward No. 10 of Athamallik NACPothole Repair from 497 Angul 1.00 1/03 to 4/0 km 498 Angul Madhapur-Belpunji roadPothole Repair from 0/0 to 7/68 2.00 499 Angul NH-157 (B) to Helei via Belataila roadPothole RepairO/O to 6/75 2.00 500 Angul Bamur Dhaurapali Madhapur roadPothole Repair0/0 to 32/0 14.00 501 Angul Thakurgarh Nakchi RoadPothole Repair0/0 to 17/5 8.00 502 Angul Parsumal KishornagarPothole Repair0/0 to 20/3 8.00 503 Angul Dohali-Bareni roadPothole Repair0/0 to 17/25 8.00 504 Angul Handapa to Patapathar via BileinaliPothole RepairO/O to 11/500 km 8.00 505 Angul Handapa Luhamunda Gunthapada via BidisinghaCD at 6/676 km 4.64 Handapa Luhamunda Gunthapada via BidisinghaPothole Repair from 0/0 to 506 Angul 4.00 7/07 km 507 Angul Handapa to PatrapadaDrain from 10/0 to 10/300 km 5,00 508 Angul Handapa to PatrapadaPothole Repair from 0/0 to 16/163 km 15.00 509 Angul Badahula Parbatipur roadPothole Repair from 0/0 to 3/4 km 5.00 Boinda Ichhapur via padmapur roadDrain from 4/030 to 4/180,4/340 to 4/44 510 Angul 5,00 km 511 Angul Phulamba-Thelkanali roadCD at 0.650 km 3.00 512 Angul Sanahula Paikasahi KantapadaPothole Repair 0/0 to 17/60 km 15.00 513 Angul Thakurgarh kantapada Pothole Repair from 0/0 to 16/99 km 15.00 Thakurgarh Akharakata road via Bhuasuni nali CD at 3.950, 5.280, 5.520, 514 Angul 10.00 6.435 515 Angul Sanahula Paikasahi via mindol road Pothole Repair from 0/0 to 9/937 8.00 516 Angul Sanahula Paikasahi via mindol road CD At 5.800, 6.900 6,00 SI.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages45 Page
-
File Size-