Environmental and Social Impact Report for Construction of Bridges on Torit Kapoeta Road Draft

Environmental and Social Impact Report for Construction of Bridges on Torit Kapoeta Road Draft

Environmental and Social Impact Report for Construction of Bridges on Torit Kapoeta Road Draft Ministry of Roads and Bridges June 2016 www.smec.com 5116021 | Unit Rate Analysis Report | Draft Ver #02 | 02 January 2016 Page i TABLE OF CONTENTS EXECUTIVE SUMMARY.................................................................................................................. 7 1 INTRODUCTION ....................................................................................................................15 1.1 Background Information................................................................................................. 15 1.2 Description of the Project............................................................................................... 16 1.3 Importance of the Project .............................................................................................. 17 1.4 Requirement for an Environmental and Social Impact Assessment (ESIA) .................... 17 1.5 Project Component......................................................................................................... 17 1.6 Objectives of Environmental and Social Impact Assessment ......................................... 18 1.7 Environmental Impact Assessment Methodology.......................................................... 18 1.8 Contents of the ESIA report............................................................................................ 20 2 POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK .............................................................21 2.1 Regulatory Framework for Environmental Management .............................................. 21 2.1.1 The Constitution of South Sudan............................................................................ 21 2.1.2 The Interim National Constitution of South Sudan (ICSS)...................................... 21 2.1.3 The Comprehensive Peace Agreement (CPA) ........................................................ 21 2.1.4 The Transitional Constitution of the Republic of South Sudan, 2011 (TCRSS) ....... 22 2.1.5 Environment Policy (2010) ..................................................................................... 22 2.1.6 Draft Environment Protection Bill (2010)............................................................... 22 2.1.7 National Environmental and Social Screening Assessment Framework (ESSAF) ... 23 2.1.8 Land Act 2009......................................................................................................... 23 2.1.9 Wildlife Conservation and National Parks Act 2003............................................... 25 2.1.10 The Forestry Commission Act, 2003....................................................................... 25 2.1.11 Wildlife Conservation and Protected Areas Bill, 2010 ........................................... 26 2.1.12 Draft Forestry Policy............................................................................................... 26 2.1.13 Mines and Quarries Act 1972................................................................................. 26 2.1.14 Traffic Act ............................................................................................................... 26 2.1.15 World Bank safeguard policies triggered by the project .................................... 27 2.2 International Conventions and Treaties ......................................................................... 28 2.3 Institutional Arrangements............................................................................................. 29 3 DESCRIPTION OF PROECT AND JUSTIFICATION ...................................................................31 4 DESCRIPTION OF PROJECT ENVIRONMENT ............................................................................32 4.1 Physical Setting............................................................................................................... 32 4.1.1 Location .................................................................................................................. 32 4.1.2 Topography and Soils ............................................................................................. 32 4.1.3 Geology................................................................................................................... 33 4.1.4 Rainfall and Temperature....................................................................................... 33 4.1.5 Agro-Economical Zoning within South Sudan ........................................................ 34 4.1.6 Drainage Pattern and Surface Water ..................................................................... 35 4.1.7 Soil Erosion ............................................................................................................. 35 4.2 Historic and Cultural Resources...................................................................................... 36 150616 | ESIA Report – Construction of Nine Bridges between Torit and Kapoeta | June 2016 Page i 4.3 Biological Resources and Ecological Analysis ................................................................. 37 4.3.1 Vegetation Description........................................................................................... 37 4.4 Socio Economic Baseline Results and Discussions.......................................................... 38 4.4.1 Social Environment................................................................................................. 38 4.4.2 Religion................................................................................................................... 38 4.4.3 Economic Environment .......................................................................................... 42 4.4.4 Community Health Status....................................................................................... 47 5 DETAILED DESCRIPTION OF THE PROJECT ..............................................................................52 5.1 Kapoeta –Torit Bridges ................................................................................................... 52 5.1.1 Road Condition between Kapoeta and Torit.......................................................... 53 5.1.2 Activities Associated with the Construction of bridges and approach roads......... 53 5.1.3 Sources of Construction materials for bridges project........................................... 54 5.2 Clearance for the Project................................................................................................ 55 5.3 Specific Environmental Characteristics of the Proposed Bridges................................... 55 6 PRESENTATION OF ALTERNATIVES CONSIDERED AND COMPARISONS....................................59 6.1 Project alternatives......................................................................................................... 59 6.2 The “No Project” Alternative .......................................................................................... 59 6.3 Alternative I – Use of Existing road route for Bridges and Approach Roads.................. 59 6.4 Alternative II – Construction of all bridges on New alignment ...................................... 60 6.5 Alternative III – The realignment alternatives................................................................ 60 6.6 Advantage....................................................................................................................... 61 6.7 Dis-advantage ................................................................................................................. 61 6.8 Quarry and borrow pit sites............................................................................................ 61 6.9 Campsites........................................................................................................................ 61 6.10 Results of comparison of alternatives ............................................................................ 61 7 POTENTIAL ENVIRONMENTAL AND SOCIAL IMPACTS.............................................................62 7.1 Positive Impacts or Project Benefits............................................................................... 62 7.1.1 Improvement of Internal and Regional Trade........................................................ 62 7.1.2 Improved access to social services due to availability of reliable and faster road transportation........................................................................................................................ 63 7.1.3 Employment creation and income improvement .................................................. 63 7.1.4 Other benefits mentioned by stakeholders ........................................................... 63 7.2 Biological Environment................................................................................................... 63 7.2.1 Climate change ....................................................................................................... 63 7.2.2 Natural vegetation.................................................................................................. 63 7.2.3 Wildlife.................................................................................................................... 64 7.3 Physical Environment ..................................................................................................... 64 7.3.1 Interference with natural flow of rivers and sedimentation.................................. 64 7.4 Human Environment......................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    121 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us