Appendix a - Cost Estimates

Appendix a - Cost Estimates

Cynwyd Spur Trail Feasibility Study Appendix A - Cost Estimates Page 43 Cynwyd Heritage Trail Spur- Phase 1 & 2 (w/ Retaining Walls) Preliminary Construction Cost Estimate Length Width Trail Feature Item Number Description Quantity Unit Cost/Unit Total Cost (ft) (ft) Section 1: O'Neill property line to bridge crossing Superpave asphalt mixture design, HMA 0409-0385 wearing course, PG64-22, <0.3 million ESALS, 9.5 mm mix, 1.5" depth, SRL-L 1050 12 1400 SY $19 $ 26,600 12' Paved Shared Use Superpave asphalt mixture design, HMA base Path 0309-0320 course, PG64-22, <0.3 million ESALS, 25.0 mm mix, 3" depth 1050 12 1400 SY $26 $ 36,400 0703-0024 Subbase 6" Depth (No. 2A) 1050 12 233 CY $62 $ 14,467 0212-0014 Geotextile, Class 4, Type A 1050 12 1400 SY $4 $ 5,040 Shoulder 0703-0024 Subbase 6" Depth (No. 2A) 1050 4 78 CY $62 $ 4,822 0203-0001 Excavation - Class 1 (pavement box only) 1050 12 389 CY $32 $ 12,534 Trail Clearing/Excavation 0203-0001 Excavation - Class 1 for grading 1050 16 856 CY $32 $ 27,575 0201-0001 Clearing and grubbing 1 LS $20,000 $ 20,000 Railroad Bridge Rehab RR bridge for trail users 1 LS $75,000 $ 75,000 Signing 0931-0111 Post-mounted signs, type B 60 SF $36 $ 2,134 Right-of-way fence under 76 and along railroad 0624-0001 600 LF $21 $ 12,660 Fencing bridge 0624-0300 End posts for chain-link fence 8 EA $194 $ 1,551 0624-0400 Corner posts for chain-link fence 6 EA $199 $ 1,193 0804-0011 Seeding and soil supplement - formula B 15 LB $60 $ 881 Seeding 0803-0001 Placing stockpiled topsoil 77 CY $26 $ 2,031 Walking Trail along Clearing and grubbing 1 LS $10,000 $ 10,000 waterfront 0703-0021 AASHTO No. 10 (6" depth) 400 6 44 CY $48 $ 2,133 Drainage/Stormwater Drainage swale along trail, pipes 1 LS $30,000 $ 30,000 Boardwalk 450' x 10' timber boardwalk around outfall 1 LS $375,000 $ 375,000 Fishing Pier Wood structure over outfall with railings 1 LS $50,000 $ 50,000 Walking Trail connection Clearing and grubbing 1 LS $20,000 $ 20,000 to CHT 0850-0031 Rock, class R-3 1000 6 73 CY $90 $ 6,600 Adventure Area boulders and/or play equipment 1 LS $25,000 $ 25,000 Canopies at NS Railroad Bridge Two canopies (one each side) required by NS 2 Each $50,000 $ 100,000 Subtotal $ 861,621 Design (20%) 1 LS $ 172,324 Landscaping (10%) 1 LS $ 86,162 E&S Controls (5%) 1 LS $ 43,081 CM/CI (10%) 1 LS $ 86,162 Survey (5%) 1 LS $ 43,081 Mobilization (5%) 1 LS $ 43,081 Contingency (20%) 1 LS $ 172,324 Section Total $ 1,507,837 Section 2: Bridge Trail Bridge Bridge 150 1 LS $400,000 $ 400,000 9624-0001 Fence on both sides of bridge approaches 80 LF $21 $ 1,688 Fencing 9624-0300 End posts 8 EA $194 $ 1,551 9624-0400 Corner posts 4 EA $199 $ 796 Subtotal $ 404,035 Design (20%) 1 LS $ 80,807 E&S Controls (5%) 1 LS $ 20,202 CM/CI (10%) 1 LS $ 40,403 Survey (5%) 1 LS $ 20,202 Mobilization (5%) 1 LS $ 20,202 Contingency (20%) 1 LS $ 80,807 Section Total $ 666,657 1 Cynwyd Heritage Trail Spur- Phase 1 & 2 (w/ Retaining Walls) Preliminary Construction Cost Estimate Length Width Trail Feature Item Number Description Quantity Unit Cost/Unit Total Cost (ft) (ft) Section 3: Bridge crossing to Cynwyd Heritage Trail Superpave asphalt mixture design, HMA 0409-0385 wearing course, PG64-22, <0.3 million ESALS, 9.5 mm mix, 1.5" depth, SRL-L 800 12 1067 SY $19 $ 20,267 12' Paved Shared Use Superpave asphalt mixture design, HMA base Path 0309-0320 course, PG64-22, <0.3 million ESALS, 25.0 mm mix, 3" depth 800 12 1067 SY $26 $ 27,733 0703-0024 Subbase 6" Depth (No. 2A) 800 12 178 CY $62 $ 11,022 0212-0014 Geotextile, Class 4, Type A 800 12 1067 SY $4 $ 3,840 Shoulder 0703-0024 Subbase 6" Depth (No. 2A) 800 4 59 CY $62 $ 3,674 0203-0001 Excavation - Class 1 (pavement box only) 800 12 296 CY $32 $ 9,550 Trail Clearing/Excavation 0204-0101 Excavation - Class 3 (for retaining walls) 800 8 948 CY $36 $ 34,133 0201-0001 Clearing and grubbing 1 LS $20,000 $ 20,000 Retaining Walls Dual retaining wall 3650 SF $100 $ 365,000 Signing 0931-0111 Post-mounted signs, type B 60 SF $36 $ 2,134 Drainage/Stormwater Drainage swale along trail, pipes 1 LS $30,000 $ 30,000 9624-0001 Fence on downhill side of slope 800 LF $21 $ 16,880 Fencing 9624-0300 End posts 2 EA $194 $ 388 9624-0400 Corner posts 10 EA $199 $ 1,989 0804-0011 Seeding and soil supplement - formula B 15 LB $60 $ 881 Seeding 0803-0001 Placing stockpiled topsoil 77 CY $26 $ 2,031 Subtotal $ 549,522 Design (20%) 1 LS $ 109,904 Landscaping (10%) 1 LS $ 54,952 E&S Controls (5%) 1 LS $ 27,476 CM/CI (10%) 1 LS $ 54,952 Survey (5%) 1 LS $ 27,476 Mobilization (5%) 1 LS $ 27,476 Contingency (20%) 1 LS $ 109,904 Section Total $ 961,664 Section 1 $ 1,507,837 Section 2 $ 666,657 Section 3 $ 961,664 Project Total $ 3,140,000 2 Cynwyd Heritage Trail Spur- Phase 1 & 2 (w/ Boardwalk) Preliminary Construction Cost Estimate Length Width Trail Feature Item Number Description Quantity Unit Cost/Unit Total Cost (ft) (ft) Section 1: O'Neill property line to bridge crossing Superpave asphalt mixture design, HMA 0409-0385 wearing course, PG64-22, <0.3 million ESALS, 9.5 mm mix, 1.5" depth, SRL-L 1050 12 1400 SY $19 $ 26,600 12' Paved Shared Use Superpave asphalt mixture design, HMA base Path 0309-0320 course, PG64-22, <0.3 million ESALS, 25.0 mm mix, 3" depth 1050 12 1400 SY $26 $ 36,400 0703-0024 Subbase 6" Depth (No. 2A) 1050 12 233 CY $62 $ 14,467 0212-0014 Geotextile, Class 4, Type A 1050 12 1400 SY $4 $ 5,040 Shoulder 0703-0024 Subbase 6" Depth (No. 2A) 1050 4 78 CY $62 $ 4,822 0203-0001 Excavation - Class 1 (pavement box only) 1050 12 389 CY $32 $ 12,534 Trail Clearing/Excavation 0203-0001 Excavation - Class 1 for grading 1050 16 856 CY $32 $ 27,575 0201-0001 Clearing and grubbing 1 LS $20,000 $ 20,000 Railroad Bridge Rehab RR bridge for trail users 1 LS $75,000 $ 75,000 Signing 0931-0111 Post-mounted signs, type B 60 SF $36 $ 2,134 Right-of-way fence under 76 and along railroad 0624-0001 600 LF $21 $ 12,660 Fencing bridge 0624-0300 End posts for chain-link fence 8 EA $194 $ 1,551 0624-0400 Corner posts for chain-link fence 6 EA $199 $ 1,193 0804-0011 Seeding and soil supplement - formula B 15 LB $60 $ 881 Seeding 0803-0001 Placing stockpiled topsoil 77 CY $26 $ 2,031 Walking Trail along Clearing and grubbing 1 LS $10,000 $ 10,000 waterfront 0703-0021 AASHTO No. 10 (6" depth) 400 6 44 CY $48 $ 2,133 Drainage/Stormwater Drainage swale along trail, pipes 1 LS $30,000 $ 30,000 Boardwalk 450' x 10' timber boardwalk around outfall 1 LS $375,000 $ 375,000 Fishing Pier Wood structure over outfall with railings 1 LS $50,000 $ 50,000 Walking Trail connection Clearing and grubbing 1 LS $20,000 $ 20,000 to CHT 0850-0031 Rock, class R-3 1000 6 73 CY $90 $ 6,600 Adventure Area boulders and/or play equipment 1 LS $25,000 $ 25,000 Canopies at NS Railroad Bridge Two canopies (one each side) required by NS 2 Each $50,000 $ 100,000 Subtotal $ 861,621 Design (20%) 1 LS $ 172,324 Landscaping (10%) 1 LS $ 86,162 E&S Controls (5%) 1 LS $ 43,081 CM/CI (10%) 1 LS $ 86,162 Survey (5%) 1 LS $ 43,081 Mobilization (5%) 1 LS $ 43,081 Contingency (20%) 1 LS $ 172,324 Section Total $ 1,507,837 Section 2: Bridge Trail Bridge Bridge 150 1 LS $400,000 $ 400,000 9624-0001 Fence on both sides of bridge approaches 80 LF $21 $ 1,688 Fencing 9624-0300 End posts 8 EA $194 $ 1,551 9624-0400 Corner posts 4 EA $199 $ 796 Subtotal $ 404,035 Design (20%) 1 LS $ 80,807 E&S Controls (5%) 1 LS $ 20,202 CM/CI (10%) 1 LS $ 40,403 Survey (5%) 1 LS $ 20,202 Mobilization (5%) 1 LS $ 20,202 Contingency (20%) 1 LS $ 80,807 Section Total $ 666,657 1 Cynwyd Heritage Trail Spur- Phase 1 & 2 (w/ Boardwalk) Preliminary Construction Cost Estimate Length Width Trail Feature Item Number Description Quantity Unit Cost/Unit Total Cost (ft) (ft) Section 3: Bridge crossing to Cynwyd Heritage Trail Superpave asphalt mixture design, HMA 0409-0385 wearing course, PG64-22, <0.3 million ESALS, 9.5 mm mix, 1.5" depth, SRL-L 800 12 1067 SY $19 $ 20,267 12' Paved Shared Use Superpave asphalt mixture design, HMA base Path 0309-0320 course, PG64-22, <0.3 million ESALS, 25.0 mm mix, 3" depth 800 12 1067 SY $26 $ 27,733 0703-0024 Subbase 6" Depth (No. 2A) 800 12 178 CY $62 $ 11,022 0212-0014 Geotextile, Class 4, Type A 800 12 1067 SY $4 $ 3,840 Shoulder 0703-0024 Subbase 6" Depth (No.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    42 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us