Cornwall 5 Year Housing Land Supply Statement 2021.Docx

Cornwall 5 Year Housing Land Supply Statement 2021.Docx

Information Classification: CONTROLLED Cornwall Monitoring Report Cornwall 5 Year Housing Land Supply Statement 15th June 2021 1 Information Classification: CONTROLLED Table of Contents Page 1: Introduction 1 2: Establishing the Five Year Requirement 1 3: Calculating the Supply 10 4: Conclusion 23 Appendix 1: Cornwall Housing Trajectory 1st April 2021 Appendix 2: Summary Housing Trajectory Tables 2021 Appendix 3: Cornwall Housing Trajectory Lead in Times and Delivery Rates Methodology Appendix 4: Schedule of Outline Planning Permissions with evidence that are considered deliverable 2 Information Classification: CONTROLLED 3 Information Classification: CONTROLLED IMPORTANT NOTES CORONA VIRUS It is undeniable that COVID‐19 has had a considerable consequence for the planning and housing sector, though at the time of writing (May 2021) the government is on track to lift all remaining restrictions by the end of July. However the continued impact of the COVID crisis and the medium to long term associated effects on the housing market is not yet known or calculable. While the many problems COVID has introduced to the planning and housing markets have undeniably made housing delivery more difficult over the past year, it has also more recently resulted in a considerable boost in housing interest in rural areas such as Cornwall. At the time of writing, the MHCLG have not revised any guidance in relation to the 5 Year Supply. While it would be difficult to see how the measure could remain a robust indication of a Local Authorities ability to deliver enough homes should it fail on this measure; housebuilding will remain a crucial component of our recovery and so we must continue to focus on the delivery of homes to meet housing needs. At the time of writing, the majority of the working population have been vaccinated, the lockdown has ended and the government is confident all national restrictions should be lifted by summer. With this in mind, there have been no adjustments to the 5 year supply methodology on this basis this year. However, the likely impact the virus has had to date and the context in which this measure of housing delivery continues to take place should not be ignored. RIVER CAMEL SPECIAL AREA OF CONSERVATION The River Camel Special Area of Conservation is designated under the Habitat Regulations 2017. The SAC covers 69km and includes headwaters of the Camel and De Lank rivers and their joining with the River Allen. The area extends from: between Camelford and Tintagel in the north following close to the A30 from Bolventor to Bodmin and just south of the A30 from Bodmin to Roche to parts of St Breock downs and between Wadebridge and Egloshayle in the west of the area. You can view more information using these links: River Camel Designated Area of Conservation, and Cornwall Council’s webpage: Temporary pause on development in the River Camel Special Area of Conservation ‐ Cornwall Council The reasons for this area being a Special Area of Conservation are the populations of: Bullhead (Cottus gobio) Otter (Lutra lutra) Atlantic salmon (Salmo salar). Cornwall Council has received a letter from Natural England about the levels of phosphates in the River Camel. Natural England considers the River Camel SAC to be at risk from the effects of eutrophication. Excessive phosphates cause eutrophication. Current mitigation measures will not reduce nutrient levels enough. 4 Information Classification: CONTROLLED Impacts and a temporary pausing of development in the River Camel catchment area A nutrient neutral approach to development is needed to avoid direct and indirect adverse impact on the River Camel SAC. We are: reviewing advice from Natural England seeking legal advice. What this means for current planning applications The Council is taking precautions by pausing decision making in the River Camel catchment area. We cannot approve new developments unless they can show they are nutrient neutral. What this means for the 5YHLS As we cannot approve new developments in the area, development will be constrained and our capacity to deliver homes in the short to medium term will be reduced. The scale of delay to housing delivery this will represent cannot be known at this stage, but estimates are currently that delivery will likely be constrained over a period of 1 to 3 years. The council has concluded that given these estimates, a reasonably robust approach would be to ensure no effected sites in the catchment will be included towards the first two years of the five year supply. The effects on planning permissions already approved will differ depending on the age and stage of each site. To account for this, we have made the following adjustments to our traditional 5YHLS methodology for sites within the catchment: Any projected delivery of homes in the next two years from Local Plan allocated sites and large sites with Outline or Permission in Principle will be pushed back, so that no homes are projected to deliver within the first two years of the five year supply. On large sites ‐ full, outline, reserved matters, discharge of condition or Section 73 applications which would result in new residential use are all assumed to be effected by the River Camel issue. No homes are projected to come forward within the first two years on these sites. The assumption is made that all small sites of less than 10 homes are effected, and no delivery will be projected for these homes within the first two years of the 5YHLS. Though it is likely that many of these homes will in practice come forward without issue, applying this blanket reduction allows our estimates to remain cautious. As delivery on small sites is typically aggregated, discounted by 10% and delivery then projected at a flat rate across a 5 year period (to eliminate any artificial ‘spike’ from small sites in years 1 and 2); delivery on small sites within the River Camel catchment will mirror this method, but with delivery instead projecting to begin at year 3 as opposed year 1, effectively further discounting the first 2 years of the 5 year supply. 5 Information Classification: CONTROLLED 2021 Housing Land Supply 1 Introduction 1.1 Paragraph 73 of the revised National Planning Policy Framework (NPPF) (February 2019) requires local authorities to identify and update annually a supply of specific deliverable sites sufficient to provide 5 years worth of housing against their housing requirements. This report establishes the position as at 31st March 2021 in relation to whether or not there is a 5 year supply of land for housing in Cornwall. The Cornwall Local Plan was adopted on 22nd November 2016 and the adequacy of the housing supply has been assessed against the adopted Local Plan housing requirement, representing the most up to date assessment of housing need in Cornwall. 2 Establishing the Five Year Requirement 2.1 The Cornwall Local Plan establishes a housing requirement of 52,500 homes between 2010 and 2030 at 2,625 per annum. As the Local Plan is less than 5 years old the NPPF makes clear in paragraph 73 that it is the Local Plan housing requirement that should be used as the basis for calculating the 5 year supply. 2.2 The Local Plan identifies a separate housing requirement for Gypsy and Traveller provision and the provision of bed‐spaces in communal establishments for older persons. The overall housing requirement also does not include the provision of purpose built student accommodation. These three elements of supply have therefore not been included in any assessment of the housing supply that meets this requirement. 2.3 The Council’s position is that the Local Plan housing requirement of 52,500 can therefore now be given full weight. Completions and the Historic Record of Delivery 2.4 There were 2,677 completions during the year 2020/21. Since the start of the plan period there have been 29,313 completions at an average of 2,665 per year. This represents an over provision of 438 homes over the plan period when compared to the proposed Local Plan housing requirement of 2,625 per year, or 28,875 over 11 years. This means that to date the plan requirement has been met. The surplus in supply means that as last year, there is no shortfall to add to 5 year requirement this year (that would require this be met within 5 years), as advocated by Planning Practice Guidance (PPG). 2.5 Table 1 below sets out the annual completions achieved since the beginning of the plan period (2010). This table also shows how the stock of planning consents either not started or under construction that are available for development has increased significantly from 12,943 in 2010 to 27,330 in 2021. 6 Information Classification: CONTROLLED Table 1: Completions 2010‐2021 Year Number of Homes with Completions Planning Permission 1st April 2010 – Start of the Plan ‐ 12,943 2010/11 2,060 13,518 2011/12 2,375 15,097 2012/13 2,278 15,520 2013/14 2,040 18,978 2014/15 2,702 20,380 2015/16 2,536 21,752 2016/17 3,074 26,347 2017/18 3,429 27,966 2018/19 3,114 30,025 2019/20 3,028 27,933 2020/21 2,677 27,330 Housing Delivery Test 2.6 The government have introduced the Housing Delivery Test to determine a local authorities’ performance in terms of meeting its housing need. This test will be used to determine the appropriate buffer to be applied to the 5 year supply assessment. The results of the Housing Delivery Test for each local authority will be typically be published by the government in February each year.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    24 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us