Expedition Dates

Expedition Dates

Information Exchange Under United States Antarctic Activities Articles III and VII(5) of the Modifications of Activities Planned for 2008-2009 ANTARCTIC TREATY II. Expedition Dates II. Expedition Dates Section II of the Modifications of Activities Planned for 2008-2009 lists the actual dates of significant events occurring during this time period. Significant Dates of Expeditions Date Activity 22-Mar-08 Cruise LMG08-03 8-Apr-08 Cruise LMG08-04 18-Apr-08 Cruise NBP 08-05 27-Apr-08 Cruise LMG08-06 28-May-08 Cruise LMG08-07 31-May-08 Cruise NBP 08-06 24-Jun-08 Cruise LMG08-08 10-Jul-08 Cruise NBP 08-08 13-Jul-08 Cruise LMG08-09 8-Aug-08 Cruise NBP08-09 USCG/ABS Inspections 13-Aug-08 Cruise LMG08-10 4-Sep-08 Winfly Begins 14-Sep-08 Cruise LMG08-11 Palmer Station Opening 10-Oct-08 Marble Point Opening 11-Oct-08 Black Island Opening 15-Oct-08 Cruise LMG 08-12 18-Oct-08 Lake Hoare opening 19-Oct-08 Copacabana Opening 21-Oct-08 Cape Crozier Opening National Science Foundation Section II, page 1 Arlington, Virginia 22230 October 1, 2009 Information Exchange Under United States Antarctic Activities Articles III and VII(5) of the Modifications of Activities Planned for 2008-2009 ANTARCTIC TREATY II. Expedition Dates Date Activity 24-Oct-08 Kenn Borek Basler (MKB) arrives McMurdo Station 24-Oct-08 Cape Shirreff Opens 26-Oct-08 South Pole Station begins summer operations using Basler aircraft (MKB) 26-Oct-08 Kenn Borek Twin Otter (KGB) arrives McMurdo Station 30-Oct-08 Siple Dome Camp opens 1-Nov-08 WAIS Divide opens 3-Nov-08 Lake Fryxell Opening 4-Nov-08 F6 Opening 10-Nov-08 Lake Bonney opening 12-Nov-08 Cape Royds Opening 14-Nov-08 Lower Erebus Hut camp put in 17-Nov-08 New Harbor opening 17-Nov-08 Kenn Borek Twin Otter (SJB) arrives McMurdo Station 18-Nov-08 Kenn Borek Twin Otter (CKB) arrives McMurdo Station 20-Nov-08 Cruise NBP 08-12 21-Nov-08 AGAP South camp put-in 1-Dec-08 Cruise LMG08-14 NSF Job Walk 14-Dec-08 Cruise NBP 08-13 NSF Job Walk 30-Dec-08 Cruise LMG 09-01 LTER Cruise 5-Jan-09 C-130 flights to McMurdo Station, operated by the Royal New Zealand Air Force, commenced (1 of 6) 5-Jan-09 Cruise NBP 09-01 21-Jan-09 AGAP South camp close 24-Jan-09 Cape Royds camp close 27-Jan-09 Lower Erebus Hut science group departure 29-Jan-09 Lower Erebus Hut closing 30-Jan-09 Cape Crozier Closing 3-Feb-09 New Harbor Closing 4-Feb-09 Lake Fryxell closing 4-Feb-09 F6 Closing 5-Feb-09 Lake Bonney closing National Science Foundation Section II, page 2 Arlington, Virginia 22230 October 1, 2009 Information Exchange Under United States Antarctic Activities Articles III and VII(5) of the Modifications of Activities Planned for 2008-2009 ANTARCTIC TREATY II. Expedition Dates Date Activity 5-Feb-09 Siple Dome Camp closes 5-Feb-09 WAIS Divide Camp closes 6-Feb-09 Lake Hoare closing 6-Feb-09 M/V American Tern arrives at McMurdo Station, cargo offload commences 6-Feb-09 Black Island Closing 7-Feb-09 Siple Dome Camp closes 7-Feb-09 WAIS Divide Camp closes 11-Feb-09 Cruise LMG 09-02 12-Feb-09 M/V American Tern Departs McMurdo Station, cargo operations completed 15-Feb-09 Livingston Island Opens (MacPhee) 16-Feb-09 109th AW LC-130 begin departing McMurdo Station 16-Feb-09 James Ross Island Opens (Kirschvink) 16-Feb-09 Winter operations commence at South Pole Station 17-Feb-09 109th AW LC-130, last aircraft departs McMurdo Station 18-Feb-09 Livingston closes (MacPhee) 22-Feb-09 Winter operations commence at McMurdo Station 6-Mar-09 Cruise NBP 09-02 10-Mar-09 Cape Shirreff closes 11-Mar-09 James Ross Island Closes (Kirschvink) 11-Mar-09 Copacabana closes 21-Mar-09 LMG09-03 22-Mar-08 Cruise LMG08-03 8-Apr-08 Cruise LMG08-04 18-Apr-08 Cruise NBP 08-05 27-Apr-08 Cruise LMG08-06 28-May-08 Cruise LMG08-07 Note: LMG = R/V Laurence M. Gould NBP = R/V Nathaniel B. Palmer National Science Foundation Section II, page 3 Arlington, Virginia 22230 October 1, 2009 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us