LOFAR Technical Issues

LOFAR Technical Issues

LOFAR Technical Issues M.A. Brentjens ASTRON, Dwingeloo, The Netherlands 2019-05-20 Windmills: time line 2018 Raad van State dismissed all appeals 2018 spring manufacturer selected: Nordex NOW Development detailed measurement procedure 2019 summer windturbine RFI assessment 2020 H1 start construction 2020 Dec wind farm operational Windmills: covenant EM interference reduction Consequence < 35 dB No permission to build 35 dB ≤ improvement < 40 dB 56–62× 12 h idle 40 dB ≤ improvement < 50 dB Reduced idle time to be negoti- ated improvement ≥ 50 dB No restrictions • Astron must find 7 dB additional improvement in signal processing. (WMM project) • Agentschap Telecom establishes method to measure improvement in cooperation with Astron and wind farm developers. Being adapted to LOFAR • In case of conflict: binding arbitration. • Neither party will claim damage due to wind farm or lack thereof. RS509 RS508 RS407 RS406 Solar parks RS409 Planned solar parks near the LOFAR core 52.96 Nieuw-Buinen RS503 Paardetangendijk Buinerveen 52.94 Nieuw-Buinen HooghwegHooghweg Energy Energy Buinen Buinen Nieuw-Buinen Nieuw-Buinen 52.92 Daalkampen 52.90 RS305 Westdorp Latitude [deg] RS306 Westdorp Exloo 52.88 RS106 Valthermond M2883 Valthermond M3006 52.86 RS205 6.75 6.80 6.85 6.90 6.95 Longitude [deg] RS307 RS310 RS208 RS210 Other Spectrum Management • 52–54 MHz range: no amateur digital broadband allowed • 70–74 MHz range transferred from military to radio astronomy • Prevented bat-based transmitters at 150 MHz • Special liaison to government for coordination of clean energy initiatives (solar PV, wind, LED (street)lighting, . ) and LOFAR: Ilse van der Waaij. Data inspection: goals and status • ML for data inspection “Goal: automatic “operator email” suggestion” • HDF5 MS summary • Full complex dynamic spectra • 1000s plots: cluster first • Browser to explore clusters DAB+ spurious: spectrum Ger de Bruyn BREAKING! DAB spurious understood! BREAKING! DAB spurious understood! • PAGER = DITHERING SIGNAL! • P2000 only on when transmitting • KPN ERMES pager system decommissioned AT SAME TIME DAB+ rollout ended • Just a happy accident. • Possible solutions: I inject artificial dither I insert (and later remove) artificial delays I insert analogue DAB-suppression filter LOfar BEams: LOBEs David Prinsloo “The primary objective of the LOBEs project is to derive, implement, and commission beam models for all low- and high-band antenna elements within the international LOFAR telescope.” Phase I LOfar BEams: LOBEs David Prinsloo “The primary objective of the LOBEs project is to derive, implement, and commission beam models for all low- and high-band antenna elements within the international LOFAR telescope.” Phase II • Actual simulation of all antenna’s in the ILT • Implementation of new LOFAR beam library based on database of simulated element beams • Full-band verification of this library using 24-h cross-calibration of several flux density calibrators at all their azimuths and elevations LOBEs: Altair-FEKO sims David Prinsloo Total power spectroscopy: main problems Mean spectral power (PPF) 1.0 0.8 0.6 Power 0.4 0.2 0.0 0 200 400 600 800 1000 Channel • Station subband bandpass correction on Cobalt insufficient for narrowband work • Core not coherent, particularly in LBA Total power spectroscopy: cobalt vs BG/P Subband bandpass correction versions FFT of subband bandpass correction versions 1.0 Cobalt 64 ch 1.04 Cobalt 256 ch BG/P 0.8 1.02 0.6 1.00 0.4 Normalized power Normalized power 0.98 0.2 Cobalt 64 ch 0.96 Cobalt 256 ch BG/P 0.0 0 50 100 150 200 250 0 20 40 60 80 100 120 Channel Fourier mode Total power spectroscopy: core coherence • Reasonable in HBA • Horrific in LBA • New LBA (and HBA) core cal solutions by Tied Array Beam holography • More permanent solution: replace clock distribution by WhiteRabbit technology: CSYLOPHON project Tied Array Holography: HBA pre cal Tied Array Holography: LBA pre cal Tied Array Holography: LBA post cal Summary • Windmills: clarity this fall • Solar parks: covenants being signed • Data inspection: new tools available internally at ASTRON • DAB spurious: understood and solution underway for DUPPLO • Beams: Phase I modelling underway • Tied array spectroscopy: LBA beams solved, bandpass not yet.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    21 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us