1. Arumeru District Council

1. Arumeru District Council

1. Arumeru District Council P.1.1 : RR_SI and RR_PM Gombe Estate Mmbogo and P 1.1 : RR_SI and RR_PM Gombe Estate‐Mmbogo and Mlalua‐Nduruma‐Bwawani Mlalua‐Nduruma‐Bwawani P 1. 3 : Construction of Materninty Ward at Oltrumet P 1.2 : Construction of Materninty Ward at Oltrumet Health Centre Health Centre P 1.5 : Construction of Materninty Ward at Oltrumet Health Centre P 1. 4 : Construction of Sekei Bridge P.1. 5 : Construction of Sekei Bridge P 1. 6 : Construction of Boundary Fence around ADC 2. BAHI DISTRICT COUNCIL P 2.1: Aditors at contractor's site office reviewing P2.2: Uncompacted fill and poor concrete drawings workmanship on Kongogo Dam P 2.3: Un‐cemented Riprap at Kongogo Dam P 2.4: Poorly trimmed borrow pit at Kongogo P 2.5: Auditors checking dimensions compliance at Bahi DC P 2.6: Completed Kigwe Mnadani Drift Servant Quarters P 2.7: Auditors confirming a borehole at Mchito P 2.8: Auditors discussing with village leader at Borehole Mundemu on the way forward - dry borehole 3. Bukoba District Council P. 3.1: Cracks can be seen on the floor and walls of a newly constructed Agricultural Centre at Kikomelo P. 3.2: A newly constructed small bridge P 3.3: Oversize, dirty, sand stone coarse aggregates used for bridges/box culverts along Kalebe- Nyakibimbili road P 3.4: A bridge whose width was increased a day after casting without engineer’s approval along Kalebe- Nyakibimbili road 4. Geita District Council P 4.1: Poorly constructed pavement at the New Geita Bus Stand P 4.2: An auditor and PE Technician carrying out P 4.3: Well constructed headwalls and wingwalls and measurements at the New Geita Bus Stand poorly compacted approaches along Geita Town – Katoma Area Roads P 4.4 Poor workmanship on constructed headwall P 4.5 One of the existing “Bridges” along Sungusira and wing walls along Sungusira – Nyakaduha Road Road 5. Igunga District Council P 5.1 ‐ Igunga Town ‐ Pipe culvert length P 5.2 ‐ Igunga Town ‐ Compaction checking, gravel measurement wearing course P 5.3 ‐ Igunga Town ‐ Pav. thickness measurement P 5.4 ‐ Igunga Town ‐ Poor concrete for wingwall P 5.5 ‐ Borehole at Bulangamilwa Village ‐ 150m P 5.6 ‐ Borehole at Matinje Village ‐ 200m drilled/dry drilled/successful P 5.7:‐ Washed out bridge to Mwanzugi village P 5.8:‐ Washed out bridge to Mbutu village 6. Ilala Municipal Council P 6.1: Rusted Handrails at Ulongoni Culvert P 6.2: Rusted Gabions at Ulongoni Box Culvert P 6.3: CIUP Project Signboard P 6.4: Obstructions within construction area - CIUP P 6.5: Effects of Leaking Roof on Ceiling board P 6.6: Cracks on walls and rusting wire mesh at at Msongola Secondary School Buyuni Secomndary School 7. Kinondoni Municipal Council P. 7.1: Failed pavement on Kagera - 1st Inn Road P. 7.2: Siltation on Open Drain at India Embassy P. 7.3: Cracks below the foundation on classroom at P. 7.4: Water Tank Riser and SIMTANK for X-Ray Room Mbeniteta Secondary at Magomeni Health Centre P. 7.5: Water Tank Riser at Makuburi P. 7.6: Disputed location of Water Tank Riser at Mburahati 8. Local Authorities Pension Fund P. 8.1: Block work as per specification P. 8.2: Column 1000mm wide as per drawings P. 8.3: Sub Contractors offices P. 8.4: Ongoing plastering works 9. Magu District Council Badugu – Nyangiri Road P. 9.1: A borrow pit adjacent to the road P. 9.2: Verifications of dimensions on site P. 9.3: A newly constructed road stretch without P. 9.4: Poor workmanship on constructed culvert proper compaction P. 9.5: Massive erosion on raised embankment P. 9.6: Concrete deck is nowhere to be found P. 9.7: Box culvert under construction P. 9.8: Exit Meeting 10. Masasi District Council P. 10.1 - Masasi Town - Conference hall concreting P. 10.2 - Masasi Town - Conference hall sand and work aggregate stoke pile P. 10.3 - Nagaga to Ng'uni Rd - Compaction checking, P. 10.4 - Lulindi to Mkundi Rd - Pav. thickness gravel wearing course measurement P. 10.4 - Masasi Town - Pipe culvert length P. 10.6 - Exit meeting - Findings Explanation inspection 11. Morogoro Urban Water Supply and Sewerage Authority (MORUWASA) in Turiani Township Annex 6: Photographic Documentation P. 11.1: Supplied UvP Pipes P. 11.2: Discussions on excvated trench ready for pipe laying P. 11.3: Poor Concrete on Guard House Column P. 11.4: Project Signboard 12. Mtwara Mikindani Municipal Council P 12.1 - PM works, Width measurement - Singino P 12.2 - Completed pipe culvert - Cast insitu road P 12.3 - Fish Market:-roofing and beams inspection P 12.4 - Fish Market:-Front view after roofing completed P 12.5 - Completed gravel wearing course - Tanu to P 12.6 - Exit Meeting - Finding and recommendation Tandika Road 1.2km discussion 13. Mtwara Urban Water Supply and Sewarage Authority (Mtuwasa) P 13.1 - entry meeting - objective and methodology P 13.2 - water conduit pipes stockpiles explanation P 13.3 - aggregate stockpile for concrete P 13.4 - test pit for geotechnical investigation P 13.5 - resident site office under construction P 13.6 - exit meeting - finding and recommendation discussion 14. Muleba District Council Secondary School Construction in Bumbire Island P 14.1: Boarding the Boat to the island P 14.2: The 90 Minutes journey is ready to begin P 14.3: Some of the newly constructed buildings of P 14.4: Are they really happy or simply fighting Bumbire Secondary School with fear and worries from the unknown? BUHANGAZA IRRIGATION SCHEME PROJECT P 14.5: Auditors listening to the contractor’s site P 14.6: The construction is ongoing but far from supervisor while seated in site “office” completion PERIODIC MAINTENANCE OF NSHAMBA P 14.7: Verification of Road width P 14.8: Hips of gravel ready to be spread on the Road 15. Mvomero District Council P 15.1 : Inadequate Septic Tank and poor workmanship P 15.2: Inadequate Soak Pit for Livestock Training P 15.3: Inadequate Septic Tank P 15.4: Well constructed Mvomero Town Road P 15.5: Auditors taking measurements P 15.6: Over flooded Mjonga Drift P 15.7: Roofed Livestock Training Building P 15.8: taking measurements at Mjonga Drift 16. National Health Insurance Fund (a) The pictures below shows Medical Centre of Excellence in Dodoma P 16.2(a): Steel truss for Roofing P 16.1(a): Entrance of the building P 16.4(a): Reinforcement are not stored properly and a P 16.3(a): Plumbing works completed water storage tank P 16.5(a): Aluminium Windows Installed at Site (b) The pictures below shows Medicare Centre at Dodoma University P 16.1(b): Entrance of the building P 16.2(b): Building Columns P 16.3(b): Reinforcement covered as per requirement 4.17 Public Service Pension Fund (PSPF) 18. Same District Council P. 18. 1: Placing of gravel on poorly compacted heavy P. 18. 2 :Cracked culvert/chipped before placement on black‐cotton on Kwasakwaa Roads Msikitini road drain works P. 18. 3 : Ongoing Relini drift construction P. 18. 4 : Narrow formation on Same‐Ruvu‐Mferejini P. 18. 5 : Thickness measurement on Makanya‐Mvungwe P. 18. 6 : Inspection of drainage structures on Majevu‐ P. 18. 7 : Inspection of drainage structures on Minyal‐ Dido‐Njoro Mbono‐Mgagao P. 18. 8 : Exit meeting with SDC DED and head of sections P. 18. 9: Entry meeting with SDC DED and head of sections 19. Sengerema District Council P. 19. 1: Kick Off Meeting P. 19. 2: Nyakasunga Water Supply Scheme P. 19. 3: Gravel on approach road was quoted for and P. 19. 4: This is a severe crack on the deck of a newly paid but not expedited constructed drift 20. Singida Municipal Council P. 20.1: ‐ PM works, Project Signboard ‐ Mwenge P. 20.2 ‐ Completed CRR base course layer ‐ Msikitini street road road P. 20.3‐ PM:‐Width measurement, Msikitini road P. 20.4‐ Spot improvement work:‐Heavy grading checking , Mandewa road P. 20.5 ‐ Width measurement ‐ Majengo ward road P. 20.6 ‐ Spot improvement work:‐Heavy grading checking , Mughanga road 21. TANROADS – Arusha P.21.1 : PM on TCA Jct‐Minjingu road, overaly and P.21.2 : PM on Tengeru ‐ Mererani shoulder graveling near Mondolu Jct P.21.3 : Bridge Major Repair on KIA‐TCA Jct ‐ Kikatiti P.21.4 : Bridge Major Repair on KIA‐TCA Jct ‐ Kikatiti CBC CBC P.21.5: Site for new CBC on USA River‐Oldonyo Sambu P.21.6 : Field Density measurement on Oldonyo Sambu road road P.21.7 : Entry meeting with TRD‐Kilimnjaro Heads of P.21.7 : Exit meeting with TANROADS ‐Manager Arusha and Departments and RM Heads of Departments 22. TANROADS – Kilimanjaro P.22.1: Overlay of Himo‐KIA Jct Maili Sita Area P.22.2 : Headwall to be with the new Contractor after M/s Absolute wa terminated on Kasadala‐ Lemira P.22.3 : Grouted stone pitching works to be finished P.22.4 : Same‐Kisiwa‐Mkomazi East by the new Contractor after M/s Absolute wa terminated on Kasadala‐ Lemira P.22.5 : Drainage and protection works on Mwembe‐ P.22.6 : Entry meeting with TRD‐Kilimnjaro Heads of Ndungu Departments P.22.7 : Exit meeting with TRD‐Kilimnjaro Heads of Departments and RM 23. TANROADS ‐ Dodoma P.23.1: Auditors taking measurements on Nzali – P.23.2: Side view of a well done Msagali Vented Drift Dabalo P.23.3: Flood on Nzali River P.23.4: A well constructed Msagali Vented Drift P.23.6: Erosion and ponding caused by not directing P.23.5: Erosion caused by undirected water into water into culvert inlet culvert inlet 24.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    31 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us