Item No. RE 2014-15 Allocation Particulars

Item No. RE 2014-15 Allocation Particulars

1.1.1 CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE 2014-15 No. NEW LINES (CONSTRUCTION) A - Works in Progress 1 Amravati - Narkher (138 km) Cap. 30,00,00 2 Ahmednagar - Beed - Parli Vaijnath (250 km) Cap. 37,00,00 EBR 20,00,00 3 Baramati - Lonand (54 km) Cap. 4,30,00 4 Puntamba - Shirdi (16.4 km) Cap. 80,00 5 Wardha - Nanded (via Yevatmal-Pusood) (270 km) Cap. 18,90,00 EBR .. TOTAL-WORKS IN PROGRESS Cap. 91,00,00 EBR 20,00,00 TOTAL-New Lines (Construction) Cap. 91,00,00 EBR 20,00,00 GAUGE CONVERSION A - Works in Progress 6 Miraj - Latur (359 km) Cap. 2,20,00 DRF .. TOTAL-WORKS IN PROGRESS Cap. 2,20,00 TOTAL-Gauge Conversion Cap. 2,20,00 DOUBLING A - Works in Progress 7 Wardha (Sevagram)-Nagpur - 3rd line (76.3 km) Cap. 6,00,00 8 Bhusawal-Jalgaon - 3rd line (24.13 km) Cap. 13,17,00 9 Kalyan-Kasara - 3rd line (67.62 km) Cap. 3,50,00 10 Panvel-Roha (75.44 km) - Land acquisition Cap. 35,00 C.Fund .. EBR .. 11 Diva-Kalyan - Doubling of 5th & 6th lines Cap. .. Dep(RVN) .. EBR .. 12 Panvel-Jasai-Jawaharlal Nehru Port Trust (28.5 km) Dep(RVN) .. EBR .. 13 Panvel-Pen (35 km) Cap. 27,00,00 14 Pen-Roha (40 km) Cap. 42,00,00 15 Godhani-Kalumna Chord (13.7 km) Cap. 15,00,00 TOTAL-WORKS IN PROGRESS Cap. 107,02,00 Dep(RVN) .. TOTAL-Doubling Cap. 107,02,00 Dep(RVN) .. TRAFFIC FACILITIES-YARD REMODELLING & OTHERS A - Works in Progress 16 Jalgaon - Yard remodeling DF(3) 5,00,00 17 Amravati - Provision of platform No.4 DF(3) 1,00,00 1.1.2 CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE 2014-15 No. TRAFFIC FACILITIES-YARD REMODELLING & OTHERS 18 Vasai Road-Diva-Panvel - Automatic signalling Cap. 8,00,33 19 Panvel - Kalamboli coaching terminus (Phase-I) (Stage-I) DF(3) .. 20 Kalamboli Yard - 2nd goods line DF(3) .. 21 Lokmanya Tilak Terminus - Augmentation of coaching facilities DF(3) .. 22 Akola - Yard remodeling DF(3) 4,17,00 23 Bhusawal - New rail level goods siding for handling full rakes DF(3) 3,40,00 24 Mumbai VT - Remodelling of main line complex (Phase-I) Cap. .. DF(3) 20,00 25 Chhatrapati Shivaji Terminus Mumbai - Kurla - Thane - Kalyan - Train describer DF(3) 2,50,00 system 26 Gaigaon - Up loop line to achieve standard 4-line layout DF(3) 12,00 27 Lonavala - Extenasion of platform No.1, 2 & 3 for 24/28-coach trains DF(3) 60,50 28 Itarsi-Amla - Intermediate block sections (4 block sections) Cap. 80,67 C.Fund .. EBR .. 29 Bhivandi - Kharbao - Kaman - Nilje - Taloje Pachhnad - Intermediate block section DF(3) 48,68 30 Bagmar - Standardisation of station layout by loop lines in both directions Cap. 25,00 31 Solapur - High level platforms & covered shed on new jumbo rake siding DF(3) 30,00 32 Amravati - Development of station with terminal facilities DF(3) 10,00 33 Bale - Development of goods shed DF(3) 5,00 34 Igatpuri - Extension of platform lines No 1, 2, 3 & 4 for dealing 24-coach trains DF(3) 1,50,00 alongwith banker engine 35 Kasara - Extension of receipt & despatch lines (3 Nos each in up & down yards) DF(3) 30,00 36 Karjat - Extension of receipt & despatch lines, addl line connecting up yard to Karjat- DF(3) 20,00 Panvel and 4th line between Karjat-Palasdari 37 Bhivandi Road - New loop line to deal full rake parcel (710 m) DF(3) 1,89,00 38 Jalgaon - Improvements to goods shed circulating area (rail level) and approach road DF(3) 50,00 by concreting 39 Manmad - Extension of passenger platform No.1 for 24 coaches, extension of DF(3) 2,00,00 up/down goods line No.3, 4 & 5 (725 m CSL) 40 Works costing below Rs.2.5 crore each Cap. 1,71,00 DRF 70,00 DF(1) 30,00 DF(3) 11,71,12 TOTAL-WORKS IN PROGRESS Cap. 10,77,00 DRF 70,00 DF(1) 30,00 DF(3) 36,03,30 B - New Works 41 Works costing below Rs.2.5 crore each Cap. 5,00 DRF 30,00 DF(1) 10,00 DF(3) 50,00 1.1.3 CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE 2014-15 No. TOTAL-NEW WORKS Cap. 5,00 DRF 30,00 DF(1) 10,00 DF(3) 50,00 TOTAL-Traffic Facilities-Yard Remodelling & Others Cap. 10,82,00 DRF 1,00,00 DF(1) 40,00 DF(3) 36,53,30 COMPUTERISATION A - Works in Progress 42 Central Railway - Extension of unreserved ticketing system to balance A, B, C & D- DF(1) .. category stations 43 Central Railway - Extension of unreserved ticketing system to E-category stations DF(1) 20,00 44 Central Railway - Extension of automatice ticket vending machines Cap. 20,62,00 45 Unreserved ticketing through mobiles at Mumbai & Chennai suburban areas DF(1) 4,25,45 46 Works costing below Rs.2.5 crore each DRF 4,36,00 DF(1) .. DF(3) 4,55 TOTAL-WORKS IN PROGRESS Cap. 20,62,00 DRF 4,36,00 DF(1) 4,45,45 DF(3) 4,55 B - New Works 47 Works costing below Rs.2.5 crore each DRF 38,00 DF(1) .. DF(3) .. TOTAL-NEW WORKS DRF 38,00 DF(1) .. DF(3) .. TOTAL-Computerisation Cap. 20,62,00 DRF 4,74,00 DF(1) 4,45,45 DF(3) 4,55 LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT A - Works in Progress 48 Leased Assets - Payment of Capital component of lease charges to Indian Railway C.Fund 476,92,00 Finance Corporation TOTAL-WORKS IN PROGRESS C.Fund 476,92,00 TOTAL-Leased Assets - Payment of Capital Component C.Fund 476,92,00 ROAD SAFETY WORKS-LEVEL CROSSINGS. A - Works in Progress 49 Nagpur Division - Interlocking of manned level crossing gates (21 Nos) S.Fund 11,96 50 Nagpur Division - Repl.of cables, relays, booms & accessories (A-route) (10 level S.Fund 2,87,75 crossing gates) 51 Manmad - Electrically operated lifting barriers in lieu of mechanical barriers outside S.Fund 1,00,00 station limits (13 level crossing gates) 1.1.4 CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE 2014-15 No. ROAD SAFETY WORKS-LEVEL CROSSINGS. 52 Bhusawal-Igatpuri - Quarters for gatekeepers of manned level crossings (RB-I type - S.Fund 50,00 127 units) 53 Nagpur Division - Repl. of duty bunks (48 Nos) S.Fund 2,12 54 Central Railway - Manning of unmanned level crossings (60 Nos) S.Fund 2,26,80 55 Works costing below Rs.2.5 crore each S.Fund 22,66,39 TOTAL-WORKS IN PROGRESS S.Fund 29,45,02 B - New Works 56 Works costing below Rs.2.5 crore each S.Fund 1,00,00 TOTAL-NEW WORKS S.Fund 1,00,00 TOTAL-Road Safety Works-Level Crossings. S.Fund 30,45,02 ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES. A - Works in Progress 57 Mhasavad - Road over bridge in lieu of level crossing No.144 S.Fund 1,60,00 EBR .. 58 Nagpur Division - Elimination of level crossings by limited height subways (7 Nos) S.Fund 1,00,00 59 Nandgaon-Chalisgaon Nagar Road - Road over bridge in lieu of level crossing S.Fund 70,00 No.118 on state highway No.24 EBR .. 60 Thane-Kalyan - Road over bridge in lieu of level crossing No.28/C S.Fund 70,00 EBR .. 61 Itarsi-Nagpur - Road over bridge in lieu of level crossing No.247 S.Fund .. EBR .. 62 Jasai-Jawahar Lal Nehru Port Trust - Road over bridge in lieu of level crossing No.6 S.Fund .. EBR .. 63 Jawaharlal Nehru Port Trust-Jasai - Road over bridge in lieu of level crossing No.2 S.Fund .. EBR .. 64 Diva-Vasai - Road over bridge in lieu of level crossing No.9 S.Fund .. EBR .. 65 Panvel-Roha - Road over bridge in lieu of level crossing No.20 S.Fund .. EBR .. 66 Panvel-Jasai - Road over bridge in lieu of level crossing No.26 S.Fund .. EBR .. 67 Panvel-Jasai - Road over bridge in lieu of level crossing No.23 S.Fund .. EBR .. 68 Diva-Panvel - Road over bridge in lieu of level crossing No.6 S.Fund .. EBR .. 69 Diva-Vasai - Road over bridge in lieu of level crossing No.4 S.Fund .. EBR .. 70 Diva-Vasai - Road over bridge in lieu of level crossing No.8 S.Fund .. EBR .. 1.1.5 CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE 2014-15 No. ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES. 71 Jasai-Jawaharlal Nehru Port Trust - Road over bridge in lieu of level crossing No.3 S.Fund .. EBR .. 72 Diva-Panvel - Road over bridge in lieu of level crossing No.9/C S.Fund .. EBR .. 73 Diva-Vasai - Road over bridge in lieu of level crossing No.1 S.Fund .. EBR .. 74 Diva-Panvel - Road over bridge in lieu of level crossing No.10 S.Fund .. EBR .. 75 Diva-Vasai - Road over bridge in lieu of level crossing No.6 S.Fund .. EBR .. 76 Kurduwadi-Miraj - Elimination of level crossing by road under bridges (20 Nos) S.Fund 14,62,78 77 Kurduwadi-Latur - Elimination of level crossings by limited height subways (7 Nos) S.Fund 3,32,94 78 Diva-Panvel - Road under bridge in lieu of level crossing No.3 S.Fund .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    26 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us