District Taluk Gram Panchayat Year Work Name Type of Building

District Taluk Gram Panchayat Year Work Name Type of Building

Estimated Expenditure For District Taluk Gram Panchayat Year Work Name Type Of Building Expenditure Work status Amount SC/ST Home in the concrete road from the house, closely cikkananjappanavara Tumkur Kunigal Amruthur 2006-07 CC Road 100000 99000 0 Completed driver narasinhayyana Tumkur Kunigal Amruthur 2006-07 Rameshwar house to house, street and sewer construction amrturu Srinivas Drainage 100000 99000 0 Completed Tumkur Kunigal Amruthur 2006-07 Village on the corner of the inner area of ​​the village yacinahalli dambarikarana other works 100000 99000 0 Completed Tumkur Kunigal Amruthur 2006-07 Anganwadis in the 1st building block amrturu Anganavadi building 103000 102000 0 Completed Tumkur Kunigal Amruthur 2006-07 Hancinaliruva precepts of the road near the home of Kal dudda yadavani vart construction CC Road 150000 149000 0 Completed Tumkur Kunigal Amruthur 2007-08 The construction of village drinking water halevuru sistan Drinking Water Supply 100000 99000 0 Completed Tumkur Kunigal Amruthur 2007-08 Village on the inner side of the road is gravel for construction CC Road 150000 123000 0 Completed Tumkur Kunigal Amruthur 2007-08 st building block in the anganwadis Anganavadi building 150000 147000 0 Completed Tumkur Kunigal Amruthur 2007-08 Harijan Colony, near the temple dudda hiriyamma amrturu mesanari drainage (S. C. Work) Drainage 200000 147000 0 Completed Tumkur Kunigal Amruthur 2008-09 Information, education enrichment program IEC 28000 0 0 Not Started Tumkur Kunigal Amruthur 2008-09 Houses near the street rajannanavara sampige kanakannanavara manevarege cement road CC Road 50000 49000 0 Completed Tumkur Kunigal Amruthur 2008-09 Domestic sewage construction kempannana husa syanuboganahalli home village ramannana Drainage 50000 49000 0 Completed Tumkur Kunigal Amruthur 2008-09 Husapalya village sewer and road construction Drainage 50000 49000 0 Completed Tumkur Kunigal Amruthur 2008-09 Sewer construction near Mill bajjappana susaitivarage Drainage 50000 49000 0 Completed Tumkur Kunigal Amruthur 2008-09 The development of the village road and drainage construction syanuboganahalli halevuru Drainage 50000 49000 0 Completed Tumkur Kunigal Amruthur 2008-09 Suresh Nagaraj Houses near Dairy sattigaudara manevarege mesanari Wall Construction other works 50000 49000 0 Completed Tumkur Kunigal Amruthur 2008-09 Kempegowda Circle is part of the village and sistan amrturu pipeline construction Pipeline 50000 49000 0 Completed Tumkur Kunigal Amruthur 2008-09 Tar Village yacanahalli work other works 200000 134000 0 Completed For convenience of the public drinking water kurediruva amrturu and syanuboganahalli village Tumkur Kunigal Amruthur 2008-09 Drinking Water Supply 350000 193000 193000 Completed bore well to the pump, motor, sistan disposition (s c Work) Tumkur Kunigal Amruthur 2009-10 Information Education and Communication Program IEC 0 0 0 Not Started Tumkur Kunigal Amruthur 2009-10 Jelly Road from Tapasegowda`s House to Madivala `Ganganna`s House CC Road 28000 0 0 Not Started Tumkur Kunigal Amruthur 2009-10 Pipeline from KEB Circle to Galligowda House to Supply Water from Overhead tank Pipeline 37000 0 0 Not Started Tumkur Kunigal Amruthur 2009-10 Bridge Construction infront of Angana Informatin Education & Development IEC 39000 0 0 Not Started Construction of Stone Drainage From Tumkur Kunigal Amruthur 2009-10 Drainage 50000 0 0 Not Started the Anjanaya Temple to Somashekar`s House Tumkur Kunigal Amruthur 2009-10 Construction of Machinery Wall From the site of Renukumar to house of Raghu other works 50000 0 0 Not Started Tumkur Kunigal Amruthur 2009-10 Machinery Wall From Maramma Temple to Karigowda`s House other works 58000 0 0 Not Started Tumkur Kunigal Amruthur 2009-10 Jelly Road from Kulluriah House to Govindappa`s House CC Road 90000 0 0 Not Started Tumkur Kunigal Amruthur 2009-10 Machinary Wall From Yachanahalli to Markonhalli Road CC Road 99000 0 0 Not Started Tumkur Kunigal Amruthur 2009-10 Pipeline & mini tank formation from Bajane Mandira to Krishnappa`s House Pipeline 99000 0 0 Not Started Tumkur Kunigal Amruthur 2009-10 2 Bridge & Drinage Construction infent Of Society Drainage 46000 46000 0 0 Tumkur Kunigal Amruthur 2010-11 Up to 3% of disabled people 0 15000 0 0 Not Started Houses near the main road srikanthayyana husa and houses close Tumkur Kunigal Amruthur 2010-11 CC Road 70000 0 0 Progress to the pipe line and the two sistan vajid Tumkur Kunigal Amruthur 2010-11 Village drinking water pipe line and construction of two sistan Pipeline 75000 0 0 Progress Ramannana manevarege concrete road construction on the Tumkur Kunigal Amruthur 2010-11 CC Road 50000 42000 0 Completed street near home sampige rajannana Husuru mariyappana house near the village and a bridge construction Tumkur Kunigal Amruthur 2010-11 Bridge work 70000 59000 0 Completed mesanarival Patel kencayyana manevarege The interior of the main road, the road is the village of markonahalli Tumkur Kunigal Amruthur 2010-11 CC Road 75000 61000 0 Completed mesanari Wall Construction Any construction of cement concrete kallurivit amrturu colony Tumkur Kunigal Amruthur 2010-11 CC Road 173000 172000 0 Completed renukanagara S. C. Tumkur Kunigal Baagenahalli 2006-07 The front of the drainage construction of the temple mailaralinga (s c) Drainage 50000 49000 0 Completed Tumkur Kunigal Baagenahalli 2006-07 P. W.. D. renukappana manevarege gravel road construction CC Road 65000 64000 0 Completed Gangadhar mugayyara homing bridge construction, bridge construction Tumkur Kunigal Baagenahalli 2006-07 Bridge work 85000 84000 0 Completed narasinhayyana houses near the bridge going kanakke dudda Home Tumkur Kunigal Baagenahalli 2006-07 Size of stone from the road on a mosque in the Muslim Colony sewage CC Road 85000 84000 0 Completed Tumkur Kunigal Baagenahalli 2006-07 Government younger elementary school, near the stone drainage construction Drainage 85000 84000 0 Completed Tumkur Kunigal Baagenahalli 2006-07 Swami Temple until the Temple cannigaraya marammana Village Sanitation Construction of Toilet 110000 109000 0 Completed Tumkur Kunigal Baagenahalli 2007-08 P. W. De road, sea, road construction kariyannana home CC Road 95000 94000 0 Completed Tumkur Kunigal Baagenahalli 2007-08 Catur side of the bridge construction Bridge work 100000 99000 0 Completed Tumkur Kunigal Baagenahalli 2007-08 Road and Bridge Construction Bridge and Road work 100000 99000 0 Completed Tumkur Kunigal Baagenahalli 2007-08 Kal Lake hallakke Wall Compound wall 160000 157000 0 Completed Tumkur Kunigal Baagenahalli 2007-08 Colony Road, the development of the road, chin annayyanapalya CC Road 160000 158000 0 Completed Tumkur Kunigal Baagenahalli 2008-09 Information, education, enrichment programs IEC 33000 0 0 Completed Tumkur Kunigal Baagenahalli 2008-09 Renukappana house near the bridge construction Bridge work 25000 25000 0 Completed Tumkur Kunigal Baagenahalli 2008-09 Hanumayyana hunnappana home away from home village sanitation Construction of Toilet 35000 35000 0 Completed Tumkur Kunigal Baagenahalli 2008-09 Turehalla road development CC Road 40000 39000 0 Completed Gramadevate devasthanadavarage nanjundayyana home near Tumkur Kunigal Baagenahalli 2008-09 Construction of Toilet 70000 69000 0 Completed the village sanitation Tumkur Kunigal Baagenahalli 2008-09 High School compound production Compound wall 100000 82000 0 Completed Colony road development and road chin palya annayyana gramasvaraj year 2006-07 Work Plan, Tumkur Kunigal Baagenahalli 2008-09 CC Road 120000 93000 0 Completed no further work on the remaining purnagulisuvudu Tumkur Kunigal Baagenahalli 2008-09 P. W.. D. Harijan colony, gravel road and bridge construction work Bridge and Road work 120000 120000 0 Completed Tumkur Kunigal Baagenahalli 2008-09 Gravel road and bridge construction document arepalya village Bridge and Road work 200000 199000 0 Completed Tumkur Kunigal Baagenahalli 2008-09 The bridge and road in the development of the colony three esti Bridge and Road work 102000 96000 96000 Completed Tumkur Kunigal Baagenahalli 2009-10 Information Education Communication Program IEC 7000 0 0 Not Started Tumkur Kunigal Baagenahalli 2009-10 Harijan colony in the village of Janata Colony and gravel road construction(SC) CC Road 140000 0 0 Progress Tumkur Kunigal Baagenahalli 2009-10 Government younger elementary school and construction of compound Compound wall 110000 86000 0 Completed Tumkur Kunigal Baagenahalli 2009-10 P settigere village. W.. D gravel road construction(SC) CC Road 110000 100000 0 Completed Tumkur Kunigal Baagenahalli 2009-10 Harijan Colony gravel Bridge Work Bridge work 110000 109000 0 Completed Tumkur Kunigal Baagenahalli 2009-10 Nanjundayyana manevarege gravel road in the village temple gramadevate CC Road 140000 130000 0 Completed Tumkur Kunigal Baagenahalli 2010-11 Up to 3% of disabled people 0 13000 0 0 Not Started Tumkur Kunigal Baagenahalli 2010-11 Junior primary school compound in government construction Compound wall 45000 0 0 Not Started Tumkur Kunigal Baagenahalli 2010-11 Junior primary school compound in government construction Compound wall 50000 0 0 Not Started Whitehead home nanjundayyana gravel road near the government junior Tumkur Kunigal Baagenahalli 2010-11 CC Road 50000 0 0 Not Started primary pathasalevarege Tumkur Kunigal Baagenahalli 2010-11 Construction Of work From P.W.D A.K. Colony road construction Stone drainage (S.C) Drainage 65000 0 0 Not Started Tumkur Kunigal Baagenahalli 2010-11 Janata colony in the village street to the house near the bridge and box guttering

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    22 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us