Mizoram State Roads II – Regional Transport Connectivity Project (Funded by the World Bank)

Mizoram State Roads II – Regional Transport Connectivity Project (Funded by the World Bank)

Resettlement Action Plan and Indigenous Peoples Development Plan for Champhai – Zokhawthar Road Public Disclosure Authorized Mizoram State Roads II – Regional Transport Connectivity Project (funded by The World Bank) Public Disclosure Authorized Public Disclosure Authorized RESETTLEMENT ACTION PLAN AND INDIGENOUS PEOPLES DEVELOPMENT PLAN Public Disclosure Authorized OF CHAMPHAI – ZOKHAWTHAR ROAD February 2014 Mizoram State Roads II – Regional Connectivity Project Page 1 Resettlement Action Plan and Indigenous Peoples Development Plan for Champhai – Zokhawthar Road TABLE OF CONTENTS Abbreviations ............................................................................................................................. 7 Executive Summary ................................................................................................................. 10 Chapter 1 – Project Identification ............................................................................................ 1 1.1 Introduction ....................................................................................................................... 1 1.2 Existing Road Conditions ................................................................................................. 2 1.3 Salient Features of the Project Road ................................................................................. 2 Chapter 2 – Objectives and Study Methodology .................................................................... 5 2.1 Objectives .......................................................................................................................... 5 2.2 Collection of Right of Way (ROW) Data.......................................................................... 5 2.3 Identification of affected land plots .................................................................................. 5 2.4 Census and Socio Economic Survey ................................................................................. 5 2.5 Stakeholder Consultations ................................................................................................. 6 Chapter 3 – Socio-Economic Profile ........................................................................................ 7 3.1 Introduction ....................................................................................................................... 7 3.2 Overview of Mizoram ....................................................................................................... 7 3.3 Project Influence Area (PIA)........................................................................................... 10 3.4 Socio-Economic Profile of Direct Impact Zone (DIZ) ................................................... 12 Chapter 4 – Proposed Improvements .................................................................................... 15 4.1 Salient Features of the Project ......................................................................................... 15 Chapter 5 – Minimizing Adverse Impacts ............................................................................. 18 5.1 Design Considerations..................................................................................................... 18 5.2 Analysis of Alternatives .................................................................................................. 18 Chapter 6 – Socio-Economic Profile of the Project Affected Households .......................... 22 6.1 Social Profile ................................................................................................................... 22 6.2 Economic Profile ............................................................................................................. 26 6.3 Project Awareness ........................................................................................................... 28 Chapter 7 – Social Impact Assessment .................................................................................. 29 7.1 Introduction ..................................................................................................................... 29 7.2 Project Impacts ................................................................................................................ 29 7.3 Likely impacts during construction stage........................................................................ 35 7.4 Summary of Impacts ....................................................................................................... 36 Chapter 8 – Stakeholder Consultations ................................................................................. 37 8.1 Introduction ..................................................................................................................... 37 8.2 Consultations with Communities .................................................................................... 37 8.3 State Level Consultations ................................................................................................ 41 Chapter 9 – Resettlement Policy Framework ....................................................................... 44 9.1 Applicable Acts and Policies........................................................................................... 44 9.2 Purpose of Social Management Framework ................................................................... 45 9.3 Definitions ....................................................................................................................... 47 9.4 Entitlement Matrix .......................................................................................................... 50 9.5 Methods for Assessment of Replacement Cost ............................................................... 57 9.6 Other processes to be followed ....................................................................................... 57 9.7 Land Acquisition by Negotiated Settlement Method ...................................................... 58 Chapter 10 – Institutional Arrangements.............................................................................. 60 Mizoram State Roads II – Regional Connectivity Project Page 2 Resettlement Action Plan and Indigenous Peoples Development Plan for Champhai – Zokhawthar Road 10.1 PIU (State) Level ......................................................................................................... 60 10.2 Special Land Acquisition Officer ................................................................................ 61 10.3 Project Road Level ...................................................................................................... 61 10.4 RAP & IPDP Implementation support Agency/NGO ................................................. 62 10.5 Construction Supervision Consultant .......................................................................... 63 10.6 Special Committee ....................................................................................................... 65 Chapter 11 – Disclosure, Consultation and Participation Plan ........................................... 66 11.1 Information Disclosure ................................................................................................ 66 11.2 Consultation & Participation Plan ............................................................................... 66 Chapter 12 – Grievance Redressal Mechanism .................................................................... 68 12.1 Grievance Redressal Committee ................................................................................. 68 12.2 Suggestion and Complaint Handling Mechanism ....................................................... 69 12.3 Management of SCHM ................................................................................................ 70 Chapter 13 – Monitoring and Evaluation .............................................................................. 73 13.1 Monitoring ................................................................................................................... 73 13.2 Evaluation .................................................................................................................... 77 13.3 Reporting ..................................................................................................................... 78 Chapter 14 – Implementation Arrangement and Schedule ................................................. 79 14.1 Introduction ................................................................................................................. 79 14.2 Schedule for RAP & IPDP Implementation ................................................................ 80 Chapter 15 – Livelihood Restoration and Income Generation Plan ................................... 85 15.1 Income Restoration Measures under the Project ......................................................... 85 15.2 Local Trade and Production Enhancement Plan .......................................................... 86 15.3 Potential Options for Livelihood Support in the Project Area .................................... 87 15.4 Institutional Mechanism .............................................................................................. 93 Chapter 16 – Gender Plan ....................................................................................................... 95 16.1 Introduction ................................................................................................................. 95 16.2

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    174 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us