Sl. No. Name of Districts Name of Schemes/Projects Estimated Cost

Sl. No. Name of Districts Name of Schemes/Projects Estimated Cost

DISTRICT-WISE SCHEMES/PROJECTS SANCTIONED UNDER NLCPR SINCE INCEPTION. Sl. Name of Name of Schemes/Projects Estimated Fund Year of Remarks No. Districts cost ( ` in Released sanction crore) 1 2 3 4 5 1 Tawang 1. C/o 33 KV Express Line from Tawang to Lumla with 33/11 KV, 6.220 5.596 2002-03 Completed 2x1.6 MVA Sub-station at Lumla. 2. Improvement of Porter Track from Jang to Sullungthi. 2.550 2.550 2002-03 Completed 3. C/o Porter Track from Nuranang to Mago. 2.590 2.550 2003-04 Completed 4. C/o road from Lhou Nallah to Mukto CO Hq. via Gomkeling 18.030 15.754 2005-06 Ongoing and Serjong. 5. V.K.V. at Kitpi in Tawang district 5.210 4.552 2005-06 Completed 6. Improvement & Extension of Water Supply at Lumla. 4.883 4.266 2006-07 Completed 7. Ropeway from Tawang Monastery to Ani Gompa 3.310 2.892 2006-07 Completed 8. Improvement of Tawang Township road network 4.896 4.320 2009-10 Ongoing 9. Providing water supply-cum-irrigation to Jangloom area. 4.915 3.497 2010-11 Ongoing 10. C/o High altitude Sports Complex at Tawang. 13.066 4.612 2010-11 Ongoing 11. Providing drinking water supply to Jang Township and its 5.651 4.018 2010-11 Ongoing peripheral rural villages. 12. Construction of road from Murga bridge point to Rho village 17.603 6.337 2011-12 Ongoing (Phase-I) 13. C/o In-Patient Department for District Hospital at Tawang. 14.384 3.012 2012-13 Ongoing Total : Tawang 13 103.308 63.956 2 West Kameng 1. Flood protection work to protect Dirang Township. 3.234 3.234 1999-2000 Completed 2. 2X5 MVA 33/11 KV at Bomdila 1.720 1.720 2002-03 Completed 3. Water Supply Scheme at Bomdila. 17.090 15.435 2002-03 Completed 4. Improvement of Porter Track from Tungri to Mago. 3.106 2.714 2003-04 Completed 5. C/o road from Palizi to Thrizino (17 KM) including culverts, 7.440 6.695 2005-06 Ongoing drainages, R&B wall, Soling and metaling, black toping and carpeting. 6. C/O. Road fom Nafra to Naku and Nachiban village. 7.540 6.786 2005-06 Ongoing 7. Opening of R.K. Sarada Mission School for girls at Khaso. 5.881 5.188 2007-08 Completed Sl. Name of Name of Schemes/Projects Estimated Fund Year of Remarks No. Districts cost ( ` in Released sanction crore) 1 2 3 4 5 8. Development of Shantideva Vidyalaya, Bomdila Monastery. 2.975 0.937 2007-08 Ongoing 9. C/o Gacham - Morshing road (24.50 KM) 19.625 17.316 2008-09 Ongoing 10. C/o Road from Magopam to Bichom via Namfri (50 KM) via 15.672 13.829 2009-10 Ongoing Ditching, Sacheda, Ramu-Sotu and Lichini under Singchung sub- Division. 11. Sanction of residential quarters, procurement of Diesel 2.156 0.000 2009-10 Ongoing Generator Set for Shanti Deva Vidyalaya at Bomdila Monastery. 12. Improvement of Janagthung-Cherong-Panchavati-Chingdam 25.102 22.149 2010-11 Ongoing road in West Kameng. 13. C/o Road from Magopam to Bichom via Namfri (50 KM) via 20.524 14.716 2011-12 Ongoing Ditching, Sacheda, Ramu-Sotu and Lichini under Singchung sub- Division (Phase-II). Total: W/Kameng 13 132.065 110.719 3 East Kameng 1. Flood control work at Dibru river at Seijosa. 2.150 2.150 1999-2000 Completed 2. C/o road from Bameng to Lada. 8.902 7.778 2005-06 Ongoing 3. C/o road from Dipu Lamgu bridge point to Pipu. 4.172 3.646 2005-06 Ongoing 4. C/O road from Pakke to Wai (18 KM). 13.354 11.669 2005-06 Ongoing 5. C/O Bailey bridge in between Namara and many other villages 8.541 2.691 2007-08 Ongoing under Seijusa circle 6. C/o road from Pachi to Rigom via Fachang, Tabri Lochung and 14.168 5.100 2009-10 Ongoing Bokar (33 KM) in East Kameng. 7. C/o road from Loffa to Pakoti village. 6.763 4.774 2009-10 Ongoing 8. Water Supply at Chayangtajo. 14.853 5.333 2010-11 Ongoing 9. C/o 2x3.15 MVA, 33/11 KV S/S at Seppa i/c distribution 8.356 5.958 2010-11 Ongoing transformers and associated 11 KV link line. 10. Construction of Steel Bridge over river Wome at Pakke Point. 2.375 0.838 2010-11 Ongoing 11. Development of Pakke to Seppi Liya Road (22 KM) 15.988 5.746 2011-12 Ongoing Sl. Name of Name of Schemes/Projects Estimated Fund Year of Remarks No. Districts cost ( ` in Released sanction crore) 1 2 3 4 5 12. Establishment of VKV (Girls Residential School) at 10.744 3.868 2012-13 Ongoing Chayangtajo. 13. Inter district road connection for Chayangtajo district to 21.406 7.706 2011-12 Ongoing Passang CO Circle in Kurung Kumey district, Phase-I. Total: E/Kaemng 13 131.772 67.257 4 Papum Pare 1. Itanagar Water Supply scheme. 10.590 10.590 1998-99 Completed 2. Anti erosion works to protect Sagalee township. 2.600 2.600 1999-2000 Completed 3. Flood control works on right bank of Dikrong river to protect 1.437 1.437 1999-2000 Completed NH-52A near Nirjuli. 4. 2X5 MVA S/S at Naharlagun. 1.690 1.690 2000-01 Completed 5. 2X3.15 MVA S/S at Nirjuli. 1.430 1.430 2000-01 Completed 6. 33 KV D/C Line from Nirjuli to Itanagar. 2.870 2.799 2000-01 Completed 7. Ramakrishna Mission Hospital, Itanagar. 1.360 1.360 2000-01 Completed 8. Naharlagun-Nirjuli Water Supply scheme. 11.730 11.040 2002-03 Completed 9. North Eastern Regional Institute of Science & Technology 40.000 24.000 2002-03 Completed (NERIST) 10. C/o New OPD at R.K Mission Hospital, Ita. 3.880 3.388 2005-06 Completed 11. Upgradation of medical equipments at R.K.M Hospital, 4.076 3.668 2005-06 Completed Itanagar. 12. Infrastructure strengthening of Secondary Health Care 4.720 4.120 2005-06 Completed Facilities at General Hospital, Naharlagun. 13. C/o road from NH 52A to Papu Hill settlement. 3.990 2.691 2005-06 Ongoing 14. C/o road from NH-52A Nirjuli to Sagalee (SH: Doimukh to 21.869 19.146 2005-06 Ongoing Toru (45 KM). 15. C/o Road from Sagalee to Sakiang CO Hq.(60 KM). 42.887 37.552 2005-06 Ongoing 16. State Legislative Assembly building 38.922 27.252 2006-07 Ongoing 17. One time Grant for Corpus fund for RKM Hospital, Itanagar 20.000 20.000 2007-08 Completed (PM's Package). 18. JNK School Building 3.100 0.977 2007-08 Ongoing Sl. Name of Name of Schemes/Projects Estimated Fund Year of Remarks No. Districts cost ( ` in Released sanction crore) 1 2 3 4 5 19. JNK Hostel Building. 1.570 0.496 2007-08 Ongoing 20. Providing/ Augmentation of WS facilities to all admn. Hqs. 12.772 10.000 2007-08 Ongoing And its villages. 21. C/o Arunachal Pradesh Civil Secretariat Building at Itanagar. 91.868 78.473 2009-10 Ongoing 22. C/o RCC (G+2) office Building for Soochna Bhawan at 9.566 3.356 2010-11 Ongoing Naharlagun. 23. C/o Police Officers Mess and accommodation to the Upper 8.791 6.206 2010-11 Ongoing Subordinate and Police Officers in the Capital Complex. 24. Infrastructure Dev including Guest House at Biological 3.308 2.382 2010-11 Ongoing Park/Zoo, Itanagar. 25. C/o Auditorium at Rajiv Gandhi University, Doimukh. 10.217 3.597 2010-11 Ongoing 26. Augmentation/Providing Water Supply connection to newly 4.929 1.772 2010-11 Ongoing created C.O. HQ at Parang Valley. 27. Water Supply at Yupia, Dist. HQ. 6.118 2.201 2011-12 Ongoing 28. Water Supply Scheme for Sagalee Township. 10.56 3.800 2013-14 Ongoing Total: P/Pare 28 376.850 288.023 5 Lower Subansiri 1. Anti erosion works at Kley river. 7.310 6.930 2001-02 Completed 2. 2X5 MVA 33/11 KV S/S at Old Ziro. 2.640 2.640 2002-03 Completed 3. 33 KV Express Line from Tago -Old Ziro. 0.680 0.300 2002-03 Completed 4. C/O. Road from Jop to Silsango in L/Subansiri District. 34.500 30.110 2005-06 Ongoing 5. Restoration and Upgradation of 32 KM internal road at Ziro 13.999 12.353 2008-09 Ongoing Township. 6. C/o road from Kimin Ziro BRTF road to KVK at Yachuli. 7.691 5.531 2009-10 Ongoing 7. Improvement and augmentation of Water Supply at Yachuli 13.190 9.466 2011-12 Ongoing township (0.6 MLD). Total: L/Subansiri 7 80.010 67.330 6 Kurung Kumey 1. Infrastructure Development for VKV, Koloriang (Ph-I). 0.800 0.800 2001-02 Completed Sl. Name of Name of Schemes/Projects Estimated Fund Year of Remarks No. Districts cost ( ` in Released sanction crore) 1 2 3 4 5 2. 2X5 MVA 33/11 KV at Sangram 0.550 0.500 2002-03 Completed 3. 150 boarders hostel at Koloriang HS school. 0.950 0.830 2005-06 Ongoing 4. C/o road from Sangram to Phassang Pallang via Nyapin SDO 8.817 7.779 2008-09 Ongoing HQ (Phase-I). 5. C/o Tamen - Tali Road via Yirkoum (60 KM) 8.981 7.925 2008-09 Ongoing 6.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    11 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us