Business 43 PROJECT WATCH – QATAR * COMPANY NEWS PROJECT FACILITY BUDGET ($million) STATUS New Port Project Steering Committee (NPP) – Hamad Port – Port Buildings and Port 150 Construction Infrastructure Package 2 (NPP/0064) CGG completes NPP – Hamad Port – Centralised Customs Inspection Area (NPP/0047) Port 300 Construction New Port Project Steering Committee (NPP) – Hamad Port – Phase 2 Overview Port 3,000 Construction Occidental Petroleum Corporation (OXY) – Expansion of Idd el-Shargi Oil Field 5,000 EPC ITB Bapco survey North Dome (ISND Phase-5) Oryx GTL – Expansion of Gas To Liquids Plant Gas to Liquids (GTL) 1,500 Feasibility Study CGG has completed the acquisition and processing of the first ever Qatar Foundation (QF) – Education City People Mover System Railway 415 Construction airborne gravity gradiometry (AGG) survey of the Kingdom of Bah- Qatar Petrochemical Company (Qapco) – Ethylene Plant Expansion – Phase 3 Ethylene 300 EPC ITB rain. Conducted on behalf of the Bahrain Petroleum Company (Bapco), Qatar Petroleum (QP) – Air Compressor Replacement at Mesaieed Refinery Gas Processing 5 Construction this was the first commercial survey to be acquired worldwide using QP – Bul Hanine Redevelopment (Offshore) Oil Field Development 11,000 FEED Falcon®Plus, the newest release in CGG’s highly successful suite of QP- Hamad International Airport Jet A1 Fuel Pipeline Jet Fuel Pipeline 300 EP Falcon airborne gravity gradiometer (AGG) systems and the lowest- QP- NFA complex – New NFA Wellhead Platform WHP-3 Offshore Platform 200 EP noise AGG system available today. QP- Vapour Recovery System at Multi Product Berth Gas Processing 50 EP A data set of around 18,000 km of high-resolution, low-noise airborne Qatar Petroleum – Al Shaheen Offshore Field Development Plan Oil & Gas Field 500 Construction gravity gradiometer and magnetic data is now available over approxi- Qatar Railways Company (QRC) – Doha Metro Network (Overview) Railway 37,000 Construction mately 7,700 sq km of open exploration acreage across the kingdom’s QRC – Doha Metro Network – Blue Line/City Line Railway 3,000 Feasibility Study offshore licensing blocks. The data set and integrated interpretation QRC – Doha Metro Network – Education City Station Railway 1,200 Construction products will help Bapco and future license holders better evaluate their hydrocarbon potential and identify priority areas for exploration in ad- QRC – Doha Metro Network – Gold Line/Historic Line (Elevated / At Grade Section) Railway 1,000 EP vance of future licensing rounds. QRC – Doha Metro Network – Green Line/Education Line Railway 3,000 Construction CGG will work with Bapco to deliver a comprehensive integrated QRC – Doha Metro Network – Metro Phase 1 Systems Rolling Stock and Track Work Railway 600 Construction study that will combine the AGG data with existing seismic, well and QRC – Doha Metro Network – Msheireb Downtown Station Railway 1,000 Construction other geological information to help improve the seismic imaging and QRC – Doha Metro Network – Red Line North/Coast Line (Elevated / At Grade Section) Railway 620 Construction interpretation of existing seismic vintages over the area and also im- QRC – Doha Metro Network – Red Line South/Coast Line (Elevated / At Grade Section) Railway 750 Construction prove prospectivity. QRC – Lusail Light Rail Transit Network Railway 1,800 Construction The study will also help to develop improved velocity models for the Qatargas – NFB Offshore Living Quarters Accommodation Project Offshore Platform 150 EPC ITB mitigation of near-surface effects. This will enhance industry under- QF – Education City – (Overview) Education/Training Facilities 7,500 Construction standing of the region’s challenging Pre-Khuff section, as well as help RasGas – Helium 3 Production Plant Helium 600 Construction image salt thickness and the edges of salt flanks to identify potential RasGas – Qatar Barzan Gas Field Development Project (Overview) Gas Field Development 10,300 Construction prospects and leads created by salt bodies. RasGas – Qatar Barzan Gas Field Development Project – Offshore – Phase 2 Gas Field Development 700 EP Yahya Al Ansari, Bapco’s exploration manager, said: “The Kingdom of Bahrain will benefit from the additional, geological insight brought RasGas – Qatar Barzan Gas Field Development Project – Offshore – Phase 3 Gas Field Development 300 EP by the higher sensitivity of the CGG FalconPlus data and its subsequent RasGas – Qatar Barzan Gas Field Development Project – Onshore – Phase 2 Gas Field Development 2,000 Feasibility Study integration with our existing information. The integrated study is ex- Shell – Pearl GTL Scheme – Onshore & Offshore Facilities Natural Gas Liquefaction 2,000, Construction resized advertpected OGN.pdf to provide 1 8/31/2016 a valuable 10:36:54 AM platform for Bapco and our future partners EP: Engineering & Procurement *Sources: DMS Projects to target and develop new petroleum resources in the kingdom.” QP – Al Shaheen Offshore Field * Al Shaheen ... being developed Name of client: QP - Qatar Petroleum strengthened its position in the Middle East by enter- Budget: $500 million ing the Al-Shaheen field. Facility type: Oil & Gas Field Total is preparing to start work on the field within the Sector: Oil first half of 2017. Status: Construction Project scope Location: Qatar Scope of work comprise: Feed: WorleyParsons • Drilling of some 40 new production wells PMC: ExxonMobil Corporation, Total, • 20 new water injection wells Shell, ConocoPhillips and Maersk REGIONS COVERED • Conversion of 14 existing wells to water injection Oil • Asia Pacific • North America • East Africa • India • Construction and installation of new production plat- Main Contractor: Total • Middle East • Central America • North Africa • China forms, interconnected with pipelines, • Latin America • Russia & CIS • West Africa • Europe Background • Facilities for gas compression Al Shaheen field is one of the world’s largest oil fields • A gas export pipeline to Qatar Petroleum’s North SECTORS COVERED and is located in block 5 offshore northern Qatar. The Field Alpha platform, offshore Qatar field is operated under a production sharing agreement • A number of appraisal wells will be drilled to evalu- on behalf of Qatar Petroleum. Current production ate possible further production potential. Oil Gas Petrochemicals Water Power Infrastructure Industrial from the field is around 40 per cent of Qatar’s crude Project finance oil, at around 300,000 barrels per day. Maersk Oil has This project client is Qatar Petroleum, who has oper- been operating the Al Shaheen field for 25 years while ated the field jointly with Maersk Oil since 1992. The being in a production sharing agreement with Qatar current agreement for Maersk Oil expires in mid-2017. Refining Construction Pipeline Offshore Renewables Mining Fertilizer Petroleum, which will be expiring on July 2017. By Qatar Petroleum – 70 per cent, Total – 30 per cent. the end of Maersk Oil’s production sharing contract Project schedule SUBSCRIBE TODAY with Qatar Petroleum, Total will be taking over the Al Feasibility Study Q1-2014 Shaheen field operations and possess 30 per cent stake Feed Q2-2014 Contact us for further information A Division of in the project. The existing development consists of 30 EPC ITB Q2-2015 platforms and 300 wells. • www.dmsprojects.net Engineering & Procurement Q3-2015 • [email protected] Project status Construction Q4-2015 • Tel: +973 1740 5590 February 2017: Despite oil price decline, Total has Completion Q3-2017 January 30 - February 5, 2017.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages1 Page
-
File Size-