Erik Madsen, Director Winter Road Operations Key Messages

Erik Madsen, Director Winter Road Operations Key Messages

Logistic Challenges: A Perspective from the Diamond Mines “THE HEAT IS ON” Prospects North September 20, 2007 By: Erik Madsen, Director Winter Road Operations Key Messages 1) Industry has done a good job with transportation infrastructure 2) Winter road has reached capacity – problems emerging 3) We need additional infrastructure Region of Interest (the size of the prize) High Lake Hope Lake • The Slave Geological Ulu Hackett River George Province Lake Izok Lupi – Many deposits n – But few mines due in Colomac part to lack of DO 27 infrastructure Nico Discovery Diamond Deposit Con, Giant Thor Transportation Key to Mining Success • Barging & cat trains in 1930s to 1960 • All weather road – Mackenzie Highway in 1960s • Early Ice road – Denison in 1960s • Aircraft throughout, with fly in innovation in 1980s • “Modern” Ice road – 1980s The Modern Ice Road – Big Innovation • A virtual highway on ice – large trucks, large loads • Echo Bay used it to create new wealth in remote barrenlands • Critical support for brand new diamond wealth Management of the Winter Road • The winter road is managed by the Tibbitt to Contwoyto Winter Road Joint Venture (JV) • Current members of the JV are: – BHP Billiton Diamonds Inc. – Diavik Diamond Mines Inc. • The JV is committed to constructing, operating and maintaining the winter road in a safe and environmentally responsible manner. Some Ice Road Facts NUNAVUT Jericho Diamond Mine Lupin Mine (inactive) 550 km • 568 kilometres long, with 64 NUNAVUT N.W.T numbered portages 500 km • Seasoned constructors – Nuna 450 km NWT Logistics & RTL Robinson EKATI Diamond Mine 400 km Enterprises (secondary route) Diavik Diamond Mine 350 km LacLac dede GrasGras RestRest StopStop • Speed limits 25 km (loaded), (for(for northernnorthern traffictraffic only)only) monitored by radar 300 km 250 km Lockhart Lake Rest Stop 200 km • Sophisticated engineering Snap Lake Mine support 150 km Gahcho Kué Project Secondary . 100 km • 3 support camps Route DomeDome LakeLake • Serves 4 diamond mines 50 km MaintenanceMaintenance CampCamp Meadows Station Security Check-in 0 km Yellowknife We’ve Done A Good Job Meeting Growth Actual Truck Loads 1989-2007 Build 12,000 Snap Lake Mine 10,000 Build Diavik Mine 8,000 Build 6,000 Ekati Mine Operate # Truck loads # Truck Lupin Gold Mine 4,000 2,000 0 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 Year But … Warning Signs Appearing Actual Truck Loads 1989-2007 Build 12,000 Snap Lake Mine 10,000 Build Diavik Mine 8,000 Build 20 6,000 06 Ekati Mine Operate # Truck loads # Truck Lupin Gold Mine 4,000 2,000 0 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 Year 2006 – A Glimpse of the Future • Canada’s hot spot • The warmest winter in 70 years of records Problem • Centred on ice area road Treeline Issues 2006 Season • Thin ice – blew out shorelines within 1st two weeks (small lakes) – due to wave action • Lost ice from underneath due to washing along shoals (middle of lakes) Ice Bridge Constructed Removal of Rig Matting (Ice Bridge) A Costly Solution – take to the Air • All mines forced to fly freight • Materials flown to Diavik: – Diesel fuel – 15,000,000 litres – Prill – 3,000 x 1 tonne bags – Cement & bentonite – 5,600 tonnes – Production shovel – 22 loads at maximum sling load 20 tonnes • Can we afford this again? 2007 Road – A Different Story • Record haul year • 10,922 loads northbound • 821 backhauls • Why the difference? – weather cooperated – operational efficiencies The Challenges Facing Us – Climate Change Summary of Yearly Freezing Index for Yellowknife Second Challenge – Growth Expectations Total Truck Loads 1989-2027 16,000 Growth expectations: 14,000 - transition to 12,000 underground mining - 1 more diamond mine 10,000 (assumes Gahcho Kue) 8,000 6,000 # Truck loads 4,000 Existing road cannot handle 2,000 all this extra demand 0 1989 1991 1993 1995 1997 1999 2001 2003 2005 2007 2009 2011 2013 2015 2017 2019 2021 2023 2025 2027 Year Risks of Inaction are Great: Diamonds Now the Economy’s Backbone Diamond Mining Contribution to Northwest Territories Real Gross Domestic Product in 2006 Gove r nm e nt 15% Other Industries 35% Diamond Mining 50% Our Search for Options Options that involve Energy Supply that is not Reliant on Roads Option 1: Pipelines Option 2: Railway Option 3: Hydroelectric transmission Option 4: Airships Options that involve Alternate Energy Transport on Winter Roads Option 5: Liquefied Natural Gas (LNG) Option 6: Hovercraft Options that involve Upgrades to the Current Tibbitt-Contwoyto Winter Road or Related Facilities Option 7: Yellowknife Fuel Storage Facilities (To optimize TCWR operations) Option 8: Supplemental winter road from Edzo via Wha Ti and NICO Option 9: Supplemental winter road from Edzo via Wha Ti and NICO with all weather section from Edzo to NICO Option 10: New winter road from Ft. Resolution east of Great Slave Lake Option 11: Secondary road via old Discovery Mine (To optimize TCWR operations) Options that involve Major New Infrastructure Construction Option 12: All weather road from Tibbitt to Lockhart Lake with fuel storage at the terminus Option 13: All weather road from Tibbitt to Lac de Gras Option 14: Bathurst Inlet Port and Road proposal (BIPAR) Option 15: Gray’s Bay Port and Road proposal (GPAR) Option 16: Barge across Great Slave Lake to East Arm with new winter road to Snap Lake/Gahcho Kue and connection to Tibbitt to Contwoyto Winter Road at Mackay Lake Option 17: All weather road north from Ft. Resolution around east side of Great Slave Lake The Most Promising Options • Seasonal Overland Route (SOR) – 150 km. of Seasonal On-land Road to augment ice road; low environmental impact; add 1 month to shipping season; Costs? • Bathurst Inlet Port & Road (BIPR) – Nunavut support and benefits; access new base & precious metal deposits; Canadian sovereignty over Arctic; Costs? • Hydropower – 600 km of power line to diamond mines; feasibility underway; Costs? Location Map: Bathurst Inlet Promising Port and Road Options Izok Seasonal Overland Road Snap Lake Taltson Powerline Possible SOR Option • Advantages: – Potential short implementation time – Adds 30 shipping days – gets to cold weather earlier – Eliminates lake ice with greatest climatic risk – Parallel to TCWR – allows staged construction – Off ice speeds allow faster & more truck trips • Disadvantages: – Rough bedrock terrain & stream crossings – Permitting complexity? • Need to investigate further: – Identify, mitigate and accommodate all environmental sensitivities – Pre-feasibility level engineering design and costing Conclusion • Traffic is increasing – need for infrastructure solution by 2011 • Climate change is adding to urgency • Mining costs are increasing (UG) – infrastructure can help lower them • The viable solution(s) are yet to be determined • SOR, BIPAR and /or hydro can help secure the strong economy diamonds has created • All provide opportunity for government support.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    23 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us