Port Facilities

Port Facilities

PORT FACILITIES Indian Minerals Yearbook 2013 (Part- I General Reviews ) 52nd Edition PORT FACILITIES (FINAL RELEASE) GOVERNMENT OF INDIA MINISTRY OF MINES INDIAN BUREAU OF MINES Indira Bhavan, Civil Lines, NAGPUR – 440 102 PHONE/FAX NO. +91712 – 2565471,2562216 PBX : +91712 - 2562649, 2560544, 2560648 E-MAIL : [email protected] Website: www.ibm.gov.in September, 2015 6-1 PORT FACILITIES 6 Port Facilities 1. GENERAL 1.3 Private Sector Participation in 1.1 Growth Major Ports ort provides an interface between ocean The private sector is envisaged to fund most of Ptransport and land-based transport. India has a the projects through Public Private Partnership (PPP) long coastline of about 7,517 km spread across the in Design, Operate, Finance and Transfer (DBFOT western and eastern shelves of the mainland and also basis) or Build, Operate, Own and Transfer (BOOT along the islands. It is a strategic geographical asset basis), etc. Thirty projects have been awarded for country's trade. There are twelve major ports in involving an investment of `20709.93 crores and India out of which six are located on the east coast capacity addition of 217.57 Million Tonnes Per and six on the west coast. In addition, there are Annum (MTPA) during 2013-14. Out of these 30 about 200 minor ports in the country. Shipping plays projects, 13 are PPP projects augmenting the capacity an important role in the economic development of by 137.65 MTPA and costing `13,208.83 crores. the country, especially in India's International trade. Among the others 14 are non PPP and three are The Indian shipping industry also plays an important captive projects costing `7501.00 crores with role in the energy security of the country, as energy capacity augmentation of 79.92 MTPA. The details resources, such as coal, crude oil and natural gas are of 30 projects awarded during 2013-14 are as follows: mainly transported or received by ships. Approximately, 95% of the country's trade by volume Table-1: Private Sector Participation and 68% in terms of value, is being transported by Sl. Projects/ Development Estimated Capacity sea route. Though India has one of the largest No. Cost (MTPA) merchant shipping fleets among the developing (`in crore) countries, it is ranked 17th in the world in terms of dead weight tonnage (dwt) as on 1.1.2013. The 1. Installation of Mechanical 940.00 23.70 Iron Ore handling facilities Ministry of shipping encompasses within its fold at WQ-1 in the northern arm major ports and inland water transport among others. of inner harbour of VPT for All major ports in the country are at present, having handling Dry bulk cargo and both rail and road connectivity. Modernisation of Ore Handling complex at VPT. 1.2 Sethusamudram Corporation Ltd 2. Development of Oil Jetty to 233.25 3.39 handle liquid cargo ship The Sethusamudram ship channel project which is bunkering Terminal at being implemented through the Special Purpose Vehicle Old Kandla (SPV) namely, Sethusamudram Corporation Ltd 3. Supplying 6 Nos. of Rubber 72.00 6.5 envisages dredging of a ship channel in the shallow Tyred Gantry Cranes (RTYGCs) portion of sea to connect the Gulf of Mannar and Bay of at JNPT Bengal through Palk bay to enable the ships moving 4. Hiring of 6 Mobile Harbour 400.00 9.00 between east and west coasts of India and to have a Cranes for mechanization continuous and hassle-free navigable sea route around of 7 & 8 Dry Cargo Berths the peninsula within India's territorial waters. at Kandla Port. 5. Commissioning of 6 floating 400.00 6.00 Dredging work of the Sethusamundram ship cranes on license basis at channel was awarded to M/s Dredging Corporation Outer Tuna Bay (OT). of India Ltd, a Government of India enterprise on 6. Upgradation of the existing 100 2 nomination basis. The project was inaugurated by Non-TNEB Coal Terminal the Hon'ble Prime Minister of India on 2.7.2005. developed by M/s Chettinad Subsequently, based on PILs filed in the Supreme International Coal Terminal Court, the dredging work in Adam's bridge was Pvt.Ltd at Kamarajar Port. stopped on 17.9.2007. At present, the project work 7. Development of Haldia Dock II 821.40 11.70 is in abeyance in view of the litigation in the Supreme (North) of Kolkata Port. C Court of India. (Contd.) 6-2 PORT FACILITIES Table - 1 (Contd.) Table - 1 (Contd.) Sl. Projects/Development Estimated Capacity Sl. Projects/Development Estimated Capacity No. Cost (MTPA) No. Cost (MTPA) (`in crore) (`in crore) 8. Setting up of facilities for 47.00 0.3 22. Development of LNG Terminal 4512.00 5.00 Cement Bagging Plant by IOCL at Kamarajar Port. Cochin Port by M/s Zuari Cement Ltd. at Cochin Port. 23. Mooring Dolphin Project at 8.71 1.00 Liquid Jetty at JNPT. 9. Construction of new multi- 93.64 5.00 purpose berth No.18 for 24. VPT: Strengthening and wide- 42.00 1.00 handling general cargo and ning of berths in Inner Harbour. containers at NMPT. 25. VPT: Single Point Mooring - 650.00 8.00 10. Acquisition of 2 Mobile Harbour 47.87 1.00 Captive facility developed Cranes as replacement of 3 Nos. by H.P.C.L. of 10 Tonnes Wharf Cranes at 26. Kamarajar: Development of 1270.00 16.80 NMPT. Container Terminal at 11. Development of NCB-III for 420.00 7.28 Kamarajar Port. handling thermal coal & rock 27. Supply, Operation and 490.00 13.5 phosphate at Maintenance of equipment V.O.Chidambaranar Port. for container handling 12. Berth No.4 project for handling 35.00 0.2 operations in Kolkata Dock Bulk/Break Bulk Cargo at System. Mormugao Port. 28. Kamarajar:Development of 151.00 2.00 13. Development of WQ 7 for 221.14 4.78 Multi-Cargo Berth at handling import Dry bulk cargo Kamarajar. and Development of WQ 8 for 29. Development of 7915.00 60.00 handling break bulk cargo and Container Terminals of export bulk cargo. 2000 Mtrs Length at JNPT th 14. Development of facilities for 214.50 2.50 (4 Container Terminal). Handling Thermal Coal for 30. VPT: Development of 400.00 - SPIC Electric Power Corpn. Container Freight Station. Pvt. Ltd (SEPC) at V.O.C. Port. 15. Acquisition of 3 Nos. of 98.80 2.64 1.4 Inland Water Transport New Super Post Panamax size RMQC for MCB to SDB & Inland Water Transport mode is cost allied electrical works at JNPT. effective, fuel efficient and climate-friendly 16. Enhancement of handling 61.94 3.00 mode of transport for bulk cargo and over facilities in CB1, CB2 and GCBs dimensional cargo. It has been a neglected sector. through upgradation and addition of Railway Infra- Efforts are being made to develop this mode of structure at Paradip Port. transportation. 17. Bare Jetty-II for M/s Tata Steel 39.86 1.00 Waterways declared as National Waterways at Haldia Dock Complex, Kolkata. by the Act of Parliament come under the purview of Central Government, while other waterways 18. Container Terminal expansion 633.11 4.79 (extension of existing container remain under the respective State Government's terminal) at VIZAG. domain. 19. Construction of coal berth no.3 270.00 9.00 Inland Waterways Authority of India (IWAI) for TNEB at Kamarajar Port. came into existence on 27.10.1986 for development 20. Railway Siding Project for BOT 51.00 4.00 and regulation of inland waterways for shipping operators for handling Coal and Iron Ore at Kamarajar Port. & navigation. The Authority primarily undertakes projects for development and maintenance of 21. Licensing of Operation of 70.71 2.49 floating cranes in the Port Inland Water Transport (IWT) infrastructure on anchorage for Lighterage National waterways through grant received from operations at V.O.C. Port. (Contd.) Ministry of shipping. 6-3 PORT FACILITIES 1.4.1 Inland Waterways independent body to regulate all tariffs (vessel The Government of India has so far declared related and cargo related) as also the rates for six waterways as National Waterways. These are: lease of properties in major Port Trusts and private operators located therein and conditions National Waterway-1: Allahabad-Haldia governing application of rates. The jurisdiction stretch of the Ganga-Bhagirathi-Hooghly river of the Authority is restricted to major port trusts system (Total length- 1620 km) in the states of and private terminals operating therein. Uttar Pradesh, Bihar, Jharkhand and West Bengal. National Waterway-2: Dhubri-Sadiya stretch 2.2 Cargo Handling Capacity and Cargo of Brahmaputra River (Total length- 891 km) in the Handled state of Assam. The capacity of major ports during 2012-13 National Waterway-3: Kottapuram-Kollam was 744.91 million tonnes as compared to stretch of West Coast Canal along with 689.83 million tonnes during 2011-12. The major Udyogmandal and Champakara Canals (Total ports, therefore, continued to maintain a length- 205 km) in the state of Kerala. favourable capacity-cargo equation during the year. National Waterway-4: Kakinada-Puducherry stretch of the canal along with designated The major ports handled a total traffic of stretches of Godavari and Krishna Rivers 545.79 million tonnes during 2012-13 against (Total length- 1078 km) in the states of Andhra 560.15 million tonnes during 2011-12. Traffic Pradesh, Tamil Nadu and the Union Territory of handled by major ports during 2011-12 and Puducherry. 2012-13 is given below: National Waterway-5: Designated stretches of Traffic Handled at Major Ports East Coast Canal, Brahmani River and Mahanadi 2011-12 to 2012-13 (In million tonnes) Delta (Total length- 588 km) in the states of West Bengal and Odisha.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    19 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us