CH-RWSR-US-MSEW Supporting Highway,NM

CH-RWSR-US-MSEW Supporting Highway,NM

CASE HISTORY Ref: USA018 - Rev: 002, Issue Date 14.12.2004 MSE STRUCTURE SUPPORTS HIGHWAY LOS ALAMOS, NEW MEXICO, USA SOIL REINFORCEMENT RETAINING WALLS Product: Terramesh®, Gabions, Reno Mattresses®, Gabion Mats®, Paralink® Problem The Cerro Grande fire of 2000 destroyed vegetation which resulted in dramatic increases in stormwater run-off in the canyons surrounding Los Alamos; only 2% of the watershed area was not burned. The increased flows through Pueblo Canyon were carried by an 86” diameter storm drain which transported the flow beneath Diamond Drive. Hydraulic modeling indicated that under these increased flows, a 1 in 100 year storm would overtop Diamond Drive, which stands some 140’ above the invert of the storm drain. It was calculated that a 12’ diameter tunnel would be required to accommodate these flows. In addition, debris basins, silt traps, culverts, and channelling works would be necessary to control the flows. Mechanically Stabilized Earth (MSE) and retaining structures would be constructed to retain and reinstate highways washed out during storm events. Detail of Paralink® sandwiched beneath Terramesh® unit (unfilled) Solution URS Corporation designed the solutions with assistance from Maccaferri’s technical department. The project consisted of; Three MSE and Gabion structures: Max. 36' high MSE structures using Paralink® and Terramesh® soil reinforcement geogrids, with a 9' high gabion wall above, supporting North Road Retaining walls: Terraced gabion walls of 30’ total height (12’, 12’ and 6’) supporting Diamond Drive. Channeling works and sediment / debris traps: Gabions, Gabion mats® and wire enclosed rip-rap were used to form drop structures and channel linings to control the flow and prevent sediment and debris from damaging downstream structures. The MSE structures incorporated different varieties of geogrid ® within the design; Terramesh , a steel woven wire mesh geogrid Compacting structural backfill onto the Paralink® and Terramesh® used as secondary reinforcement; and Paralink®, a polyester geogrid with a tough polypropylene protective sheathing used as primary reinforcement. Paralink® strengths of up to 55,000 lb/ft (800 kN/m) were used on this project. Structural backfill was compacted in layers upon the reinforcing geogrids as the embankment was constructed. Client: Client name: LOS ALAMOS COUNTY, NM Main contractor: TWIN MOUNTAIN INC. ALBUQUERQUE, NM Designer: URS CORPORATION INC. Product used: TERRAMESH®, GABIONS, GABION MATS® RENO MATTRESS®, PARALINK®, MACTEX® Date of building: Gabion and Gabion mat® revetment, and debris basin MAY - NOVEMBER 2003 3ft 0.5ft 0.5ft NORTH ROAD 2.5ft 3ft NON-WOVEN FILTER FABRIC 2ft 9ft GABION UNIT 9ft HIGH GABION WALL TERRAMESH RETAINING WALL SYSTEM PARALINK 800M SOIL REINFORCING GEOGRID WITH 1.5ft typ. TERRAMESH 9ft UNIT DOUBLE TWISTED WIRE MESH TYPE 8X10, ZINC AND PVC COATED (TYP) NON-WOVEN TERRAMESH SOIL FILTER FABRIC REINFORCING SYSTEM 34ft MSE WALL 3 inches 3ft RWLOL RWLCP 2ft NON-WOVEN FILTER FABRIC 15ft 3ft 6ft 30ft Typical cross section through MSE structure using 56,000 lb/ft Paralink® The MSE structures not only retained North Road, but also provided erosion control and training works for the river channel at the foot of the structures. Terramesh® structures can accommodate large differential settlements without sustaining damage. This is a crucial capability in channeling works, where erosion can cause settlement. In August 2003, during construction, a storm event brought large amounts of debris downstream including trees and rocks measuring up to 5 feet in diameter. Following this event, areas of the channel lining protection were ‘shotcreted’ to offer additional impact protection from debris. 36’ high MSE structure supporting North Road The debris basins utilized 6’ high gabion weirs with concrete crests to contain the debris. These basins were lined with Gabion mats® which offer very high water flow shear resistance. It is estimated that the Pueblo Canyon debris basin will fill at a rate of 1600 tons of debris per year, and the North Road basin at 200 t/yr. A maintenance commitment has been implemented to empty the traps periodically. This project illustrates the destructive power of water, and the extreme conditions that can be caused when forest fires destroy vegetation. As vegetation re-establishes itself within the canyons, the storm water flows will decrease. However, due to the growing conditions in Pueblo Canyon, complete revegetation is forecasted to take at least 50 years. Example of debris (on top of Gabion Mat®) following storm MACCAFERRI INC. Headquarters - East Coast West Coast 10303 Governor Lane Blvd, Williamsport, MD, 21795 3650 Seaport Blvd, West Sacramento, CA 95691 E-mail: [email protected] Tel.: (301) 223 6910 Fax: (301) 223 4356 Tel.: (916) 371 5805 Fax: (916) 371 0764 Web site: www.maccaferri.com Copyright 2004 Maccaferri Inc..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us