?:::::::C~ Field Supervisor

?:::::::C~ Field Supervisor

United States Department of the Interior FISH AND WILDLIFE SERVICE Ecological Services 4625 Morse Road, Suite 104 Columbus, Ohio 43230 (614) 416-8993 I FAX (614) 416-8994 May 10,2013 Dear Interested Party, The U.S. Fish and Wildlife Service, Ohio Ecological Services Field Office and the Ohio Department of Natural Resources, Division of Wildlife are pleased to announce the release of joint agency Mussel Survey Protocols for the State of Ohio. These protocols were developed to provide standardized guidance to project applicants about acceptable survey methods and levels of effort for a variety of common project types. These protocols are adapted for Ohio from "West Virginia Mussel Survey Protocols, March 2013, by Clayton et al." These protocols are generally applicable to all streams in Ohio that may harbor mussels. Many Ohio streams have been assigned into one of four groups for the purpose of determining the appropriate survey effort and protocol to follow. Survey protocols are based on stream size and potential for the presence of federally listed mussels. Group 1: Small to mid-sized streams, federally listed species not expected Group 2: Small to mid-sized streams, federally listed species expected Group 3: Large Rivers, federally listed species not expected Group 4: Large Rivers, federally listed species expected Regardless of stream group classification, all four groups of streams require a mussel survey. Streams not assigned into a group should also be assessed to determine if habitat for native mussels is present. Mussel surveys may also be recommended for these streams. For the 2013 survey season, any person conducting a mussel survey in the State of Ohio must hold a valid Ohio Scientific Collecting Permit for mussels and a Federal Fish and Wildlife Permit for mussels that authorizes work in Ohio. The Ohio Division of Wildlife is currently developing a standardized mussel identification test that, when developed, will be administered as part of the State's permitting application process for new mussel permit applicants. Existing State mussel permittees will also need to pass this test in order to conduct mussel surveys in Ohio streams. Permittees who pass this State test will then be allowed to conduct mussel surveys in Group I and Group 3 Ohio streams (federally listed mussels not expected) without having a Federal permit. If you have questions, or if we may be of further assistance in this matter, please contact Angela Boyer at (614) 416-8993, extension 22. Sincerely, ?:::::::c~ Field Supervisor Ohio Mussel Survey Protocols May 2013 Ohio Department of Natural Resources (ODNR), Division of Wildlife U.S. Fish and Wildlife Service (USFWS), Ohio Ecological Services Field Office Introduction All native mussels are protected in the State of Ohio (Section 1533.324 of the Ohio Revised Code). In addition, ten federally listed or proposed species occur in the State and are protected by the Endangered Species Act (87 Stat. 884, as amended; 16 U.S.C. 1531 et seq.). Impacts to State and federally protected mussels and their habitats should be avoided and minimized to the maximum extent practicable. If impacts cannot be avoided, all streams which contain mussels or potential mussel habitat must be surveyed prior to any proposed stream disturbance. As such, the protocols herein are designed to determine the presence or probable absence of federally listed mussel species (FLS) as well as provide for the protection of all native mussels within Ohio. Furthermore, this protocol will help assess the size of mussel populations within the project area. These protocols were developed to provide standardized guidance to project applicants about acceptable survey methods and levels of effort for a variety of common project types. These protocols are adapted for Ohio from “West Virginia Mussel Survey Protocols, March 2013, by Clayton et al.” These protocols are generally applicable to all streams in Ohio that may harbor mussels. This protocol is divided into four sections: A) General Guidelines, B) Stream Group‐specific Considerations, C) Relocations, and D) Project‐specific Considerations. A) General Guidelines Stream Classification: Survey protocols in this document are based, in part, on stream size and potential presence of FLS. Accordingly, for purposes of determining survey effort and protocols, Ohio streams have been assigned into the following groups. Specific streams and their category are listed alphabetically by county in Appendix A. Regardless of stream classification, all 4 groups of streams require a mussel survey (described in Project Specific Guidance section below) if the watershed area above the impact point is 2590 ha (10 mi2) or larger. Streams not included in Appendix A should also be assessed to determine if habitat for native mussels is present if the watershed area above the impact point is 2590 ha (10 mi2) or larger. Mussel surveys may also be recommended for these streams. Group 1: Small to mid‐sized streams, FLS not expected. Group 2: Small to mid‐sized streams, FLS expected. Group 3: Large Rivers, FLS not expected. Group 4: Large Rivers, FLS expected. 1 Surveyor Qualifications: State and Federal collection permits are required to conduct mussel surveys and relocations in any Ohio stream. In addition, site specific authorization from the U.S. Fish and Wildlife Service is required to conduct surveys in streams that may harbor federally listed species (i.e., Group 2 and Group 4 streams). Prior Notification: Even though standardized protocols are established, survey plans must be provided to appropriate State (all streams) and Federal (Group 2 and Group 4 streams) agencies. This is to ensure that the appropriate protocol is being applied for the given stream type and construction activity and to allow time for agency staff to review existing data from the proposed survey area and work with the applicant to design the appropriate survey extent as described below. Appropriate State and Federal agencies shall be notified at least 30 days prior to the time the actual survey will occur. In addition, State (all streams) and Federal (Group 2 and Group 4 streams) agencies shall be given at least 30 days to review survey results prior to the anticipated start of any construction activities. State and Federal contact information is provided in Table 1. Surveyors must receive site‐specific authorization from the U.S. Fish and Wildlife Service, Ohio Ecological Services Field Office prior to conducting surveys on any Group 2 or Group 4 streams. Survey Season: The survey season is from May 1 to October 1. Requests to conduct surveys outside this time period will generally not be approved. Any survey work outside this period will be done only under extenuating circumstances, with separate approval obtained from the appropriate State and/or Federal agencies prior to conducting the work, and may require a revised protocol. Workable flow requirements: If the area cannot be effectively surveyed under existing flow conditions then the survey must be re‐scheduled. Any variance must be approved by the appropriate State and Federal agencies. Data Longevity: Survey data will be considered valid for five years from the date of the survey. Visibility requirements: Visual or surface searches must have a minimum visibility of one‐half meter (approx. 20 inches), with or without lights at depth of survey. When recording visibility along with other data, report the actual visibility rather than just noting that it met the minimum requirement. If suitable visibility is not present at the intended time of survey, then the survey must be re‐scheduled, or a different protocol must be employed in consultation with the appropriate state and federal agencies (Example, more extensive quantitative surveys with excavations may be required). If the normal flow conditions offer low visibility, the visibility requirement may be lifted. Minimum Data to be Recorded: See Appendix C for a checklist of data that must be included in the survey report. Data must also be reported electronically in accordance with your State and Federal permits and any site specific authorization conditions. Survey Area: The survey extent shall include the area of direct impact (ADI) and all applicable buffers upstream (US), downstream (DS), and laterally (LT), as indicated in Table 3. If the project may affect stream hydrology, such as hydropower projects or installation of in‐stream structures, the area of 2 hydrologic impact shall be included in the ADI. Likewise, the mixing zone of an outfall shall be included within the ADI. Survey Techniques: With the exception of streams with watersheds < 2590ha (10 mi2) above ADI, all other streams listed in Appendix A require mussel surveys of the ADI and all buffers US, DS, and LT, if applicable. Visual or Surface Searches include moving cobble and woody debris; hand sweeping away silt, sand and/or small detritus; and disturbing/probing the upper 5 cm (2 in) of substrate in order to better view the mussels which may be there. A minimum of 1 minute/m2 of visual searching shall be expended in each segment of heterogeneous substrate. Timed Search Surveys consist of visually searching throughout a larger defined area (such as DS buffer, ADI, US buffer or mussel concentration) for a given period of time. This type of search can be used in Group 1 streams to determine if mussels are present and to define the limits of a mussel concentration or in all streams to generate a species richness curve. Timed search surveys covering each of the entire DS buffer, ADI, and US buffer are acceptable for Group 1 streams only. At a minimum, data shall be provided for each area separately. Transect Surveys are required for Group 2, 3 and 4 streams unless conducting a complete coverage survey using cells (described below). Transects shall be established throughout the proposed site perpendicular to the river. Each transect will be sub‐divided into 10‐m segments for Group 3 and 4 streams and 5‐m segments for Group 2 streams.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    32 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us