Space Shuttle Missions Summary

Space Shuttle Missions Summary

Revision S May 2002 SPACE SHUTTLE MISSIONS SUMMARY Page 108 - STS-89 LANDING SITE/ SSME-TL CREW LAUNCH SITE, RUNWAY, NOM-ABORT SRB ORBIT PAYLOAD MISSION HIGHLIGHTS FLT ORBITER 7 UP, 7 DOWN LIFTOFF TIME, CROSSRANGE EMERG RSRM FSW WEIGHTS, (LAUNCH SCRUBS/DELAYS, NO. LANDING SITES, LANDING TIMES THROTTLE AND INC HA/HP PAYLOADS/ TAL WEATHER, ASCENT I-LOADS, TITLE, NAMES ABORT TIMES FLT DURATION, PROFILE ET EXPERIMENTS FIRSTS, SIGNIFICANT ANOMALIES, ETC.) & EVA'S WINDS ENG. S.N. STS-89 OV-105 CDR: KSC PAD 39A KSC 15 (KSC 42) 104/104/ BI-093 51.65 DIRECT OI-26 CARGO: KSC W / D : OPF 202, VAB 7, PAD 26 = 235 days total. (Flight 12) Terrence W. Wilcutt 23:02:48:14.98Z 31:22:35:09Z 109% (9) INSERTION (4) 28040 LBS SEQ Endeavour (Flt 3 - STS-68, STS-79) 9:48:15 PM EST (P) 5:35:09 PM EST RSRM LAUNCH POSTPONEMENTS : FLT #89 P517/R183/V130/M160 9:48:15 PM EST (A) PREDICTED: 64 POST OMS -2 : PAYLOAD - Baselined 1/15/98 launch date on 10/1/96. Spacehab 9 Thursday 27 Saturday 19 100/104/104 162.4 X 161.1 CHARGEABLE: - Moved STS-89 from OV-103 to OV-105 on 5/22/97. KSC - 89 PLT: 1/22/98 EST (9) 1/31/98 (8) 67/104 ET-90 NM 22163 LBS - Postponed launch date to 1/22/98 EST (1/23/98 GMT) on OMS PODS : Joseph F. Edwards Jr. 12/18/97. DEORBIT BURN : PAD 39A-52 LPO4-19 P518/R233/M203 LAUNCH WINDOW : ACTUAL: LWT-83 TI: DEPLOYED: RPO1-26 7M 56S Using PLT 31:21:27:55Z 100/104/104 1:15:03:04 4596 LBS LAUNCH SCRUBS : None MLP-3 FRC5-12 M / S 1 : MIR PLANAR/ XRANGE: 600NM 67/104 ET MET James F. Reilly, II PHASE WINDOW RPT: 215.6 X 203.4 NON - DEPLOYED : LAUNCH DELAYS : None P519/R234/M204 ORBIT DIR : AL 20 1 = 2043 (1) 271.3K NM 16699 LBS EOM PLS : KSC 2 = 2044 (1) TAL WX : M / S 2 : TAL: ZZA AIM PT : NOMINAL 3 = 2045 (1) ET SEP 1 : MIDDECK: - Zaragoza (prime and selected) and Moron forecast and Michael Anderson TAL WX : MRN, BEN BRKUP: 6:15:28:26 868 LBS observed GO. Ben Guerir was forecast NO GO for ceiling and P520/R235/M205 MLGTD: 2702 FT 269.1K MET visibility (very dense fog). SELECTED: 31:22:35:09Z 206.6 X 203.2 SHUTTLE M / S 3: ( PAYLOAD CDR ) : RTLS: KSC 15/CI/N VEL: 202 KGS ET NM ACCUMULATED SHUTTLE NIGHT LAUNCH : #19 Bonnie J. Dunbar TAL: ZZA 30/CI/N 198 KEAS IMPACT WEIGHTS: (Flt 5 - STS-61-A, STS-32, AOA: NOR 17/N/SF HDOT: -2.3 FPS 1:27:09 DEPLOYED: DOLILU / I - LOADS : STS-50, STS-71) PLS: EDW 22/N/SF MET 848511 LBS - DOLILU II uplink #20, total uplink #39. P521/R79/V49/F7 TD NORM 195 : LAT: NON - DEPLOYED : TDEL: 2776 FT 0.69°N 1299327 LBS PERFORMANCE ENHANCEMENTS : M / S 4 : 0.14 -0.098/0.1 LONG: CARGO TOTAL : - Standard set plus Block IIA SSME’s. DRAG CHUTE ° Salizhan Shakirvich Sharipov DEPLOY: 190 KEAS 120.7 W 2676765 LBS (Russia) MAX Q NAV : 31:22:35:13Z FLIGHT DURATION CHANGES : P522/R236/M206 702 PSF 710 PSF PERFORMANCE - None. Landed on orbit 139. NLGTD: 6112 FT MARGINS ( LBS ) : M / S 5 SRB STG : 31:22:35:20Z FPR: 3272 FIRSTS / LASTS : Ascent 2:03.8 2:06 VEL: 152 KGS FUEL BIAS: 854 - First flight using Block IIA SSME’s. (Rocketdyne HPFTP) Andrew S. W. Thomas 149 KEAS FINAL TDDP: 2309 - First flight with external airlock. (Flt 2 - STS-77) PERF: NOMINAL HDOT: -5.9 FPS RECON: 3594 - Record number of people in orbit: Mir 3 - 2 Russians, 1 Stay on Mir 24 and Mir 25, American; Soyuz 3 - 2 Russians, 1 French; Endeavour 7 - return on STS-91. 2 ENG TAL ( ZZA ) : BRK INIT : 94 KGS PAYLOADS: 6 Americans, 1 Russian. P523/R213/V149/M186 2:26 2:25 PLB: DRAG CHUTE SHUTTLE/MIR EVENTS: M / S 6 NEG RETURN : JETTISON: 56 KGS MISSION 8 - Mir capture at 24:20:14:21Z, 1:17:26:06 MET. Descent 4:02 4:05 31:22:35:53Z - Docking complete at 24:20:23Z, 1:17:35 MET. David A. Wolf BRK DECEL FPS 2: SPACEHAB - Andrew Thomas transferred to Mir 24 and David Wolf to (Flt 2- STS-58) PTA ( U / S 265) : AVE 3.6 PK 5.0 (Double Module) STS-89 Endeavour at 26:05:51:15Z, 3D13H3M. David Wolf total Ascent on STS-86, 4:42 4:35 Mir time 119:23:16:56 and total flight time 127:20:00:50. stay on Mir 24. WHEELS STOP : GAS (4) - Undocking at 29:16:56:56Z, 6:14:08:41 MET. P524/R173/V147/M151 DROOP ( ZZA ) : 31:22:36:21Z ODS - Inert weight adJustment of -200 lbs included in STS OPR 5:20 5:22 12492 FT chargeable. MIDDECK: PTM ( U / S 265) : ROLLOUT: HP, MPNE, AST, RENDEZVOUS #41 : 5:50 5:48 9790 FT CREAM, SIMPLEX, - Rendezvous and dock with Mir. 72 SEC SAMS, MGM (2), MECO CMD : WINDS: M 3 EOM : CEBAS, RADIATOR DEPLOY #21 : 8:28.9 8:29 4T, 4L KTS EARTHCAM OFFICIAL: 0205P11 WEIGHT: SIGNIFICANT ANOMALIES : VI: 7T,8L 217475 LBS - GPC 3 mode switch no apparent detent at standby. Went to 25876 25873 DEORBIT: 5 CRYO TK SETS halt from run. MCC WHITE FCR (19) DENS ALT : -103 FT X CG: 207.1 X 193.7 6 GN2 TANKS - Payload bay floodlights FWB STBD and MID PORT failed (new OMS -2 : 1086.45 NM design). FLIGHT DIRECTORS : 41:46 41:48 FLT DURATION : LANDING: NO RMS - TIPS and OCA problems. ASCENT- L. J. Ham 213 FPS 213 FPS 8:19:46:54 VELOCITY: - -Z Startracker pressure fail BITE. LD/O 1 - P. L. Engelhauf S / T : 755:11:40:28 WEIGHT: 25900 FPS - S-Band antenna electronics 2 failed to select the best antenna. O 2 - R. E. Castle 217422 LBS - Vestibule vent valves were misconfigured (3 of 4 open). PLNG - P. S. Hill OV -105 : ENTRY - Vernier thruster L5D oxidizer temp failed erratic, attitude control ENTRY- J. P. Shannon 121:08:50:00 X CG: RANGE: passed to Mir Jets, then to orbiter PRCS. MOD - A. L. Briscoe DISTANCE: 1088.16 4341 NM - Right RCS fuel helium isolation valve B failed to open. 3,610,000 sm - Vernier driver F5 RPC 2 failed off..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us