ECOWAS Regional Workshop on WIND ENERGY NOVEMBER 2013 Copyright © 2013, Gesto Energia S.A. GESTO PRESENTATION GESTO EXPERIENCE CAPE VERDE EXPERIENCE GESTO WIND EXPERIENCE GESTO PRESENTATION GESTO EXPERIENCE CAPE VERDE EXPERIENCE GESTO WIND EXPERIENCE GESTO IS SPECIALIZED IN ENERGY CONSULTING AND RENEWABLE PROJECT DEVELOPMENT (I/II) ENERGY CONSULTING PROJECT DEVELOPMENT SUPPORT TO RENEWABLE HYDRO, WIND & SOLAR ENERGY POLICY AND PLANNING ENERGY PROJECT DEVELOPMENT Identification, technical-economical Gesto is specialized in energy planning • Renewable resources assessment assessment and development of projects: and renewable energies action plans: (hydro, wind, solar, biomass/MSW, • Small hydro • Electrical system analysis (demand, waves/tides, geothermal) • Pumped storage installed power units, generators • Resource mapping • Solar PV characteristics, electrical grid) • Renewable project identification and • Solar & Diesel integration • Demand forecast energy potential evaluation • Wind farms • Grid network studies and projects • Site assessment • System operation cost analysis • Licensing (construction/Municipal; GEOTHERMAL / GEOLOGY • Energy efficiency measures electrical Installations, environmental, Identification, technical-economical • Infrastructure investment planning electrical grid, telecommunications, etc) assessment and development of • Renewable energies scenarios and grid • EPC contracts management, projects geothermal projects: impact development supervision and • Medium enthalpy • Legal framework development and coordination, quality and safety • High enthalpy support conditions control Other geological resources and • Definition of incentives to Renewable • Operational dispatch design and opportunities Energies implementation support: • Legal support to state agencies • Management and stability solutions OTHER concerning the preparation of public • Renewables projects grid integration tenders for energy projects solutions - studies and project Energy services projects In cooperation with investment funds Copyright © 2012 Gesto Energia S.A. 5 Gesto Company Presentation GESTO IS SPECIALIZED IN ENERGY CONSULTING AND RENEWABLE PROJECT DEVELOPMENT (II/II) Renewables “Consulting for sustainable energy” “Geothermal exploitation in Italy” Microgeneration (Solar projects) Several PV • Renewables evaluation projects • Project identification, under development & management exploration • Master Planning • Legal support & Financing HidroAvelar Lower dam Tunnel Portugal Upper dam Spain 0,60 Ordem de Mérito VS Capacidade Acumulada 0,55 East Timor Underground powerhouse 0,50 0,45 Cape Verde LIMITE Heavy Fuel (100USD/bbl Brent) érito M de de 0,40 Molop - HR Datoleu - Gleno I Gleno - HF Soibada III Soibada Ahangcain HF - Solar I Solar - - Ordem Mozambique HR HF 0,35 SF Díli - Ossú Gleno - Clere - - Solar II Solar 0,30 HB Solar III Solar - Laclo II+III Laclo - HR HB - HF SF SF HR 500MW Hydro Pump Storage project Vestas - Vestas Vestas Namibia - - Vestas - Outros - Soibada I+II Soibada 0,25 - EO Atsabe - HF Leirema IV+II+III+I Leirema - Bobonaro II Bobonaro Lariguto II II Lariguto - Dili(RSU) - HF Iralalaru Bobonaro I Bobonaro Gleno III+II Gleno Baucau (Florestal) Baucau - - - Lariguto I I Lariguto HF - - - EO Ainaro III+II+I Ainaro EO - Marobo IV+I+V+III+II Marobo BR - BF HF EO HR EO HF IV+VIII+VII+I+V+II+III+VI HF 0,20 0 50.000 100.000 150.000 200.000 250.000 300.000 350.000 400.000 450.000 Angola under development (initial stage) Capacidade acumulada (kW) Projectos economicamente competitivos face ao HEAVY FUEL Projectos não competitivos face ao HEAVY FUEL ou c/ limitações técnicas de ligação à rede ... ENERGY CONSULTING RENEWABLE PROJECT DEVELOPMENT Copyright © 2012 Gesto Energia S.A. 6 Gesto Company Presentation GESTO IS A SPIN-OFF OF MARTIFER GROUP Gesto is a spin-off from Martifer group focused on Renewables… • Resource study and analysis (Resource Atlas) • Project identification (location, power, etc) • Energy planning and policies • Licensing and project management • Project development • Grid study, optimization and renewable projects integration … with projects developed in Europe, Asia and Africa… Cape Verde Energy Master Plan Mozambique Renewable Energy Atlas Gesto developed the biggest Solar PV Power Plant in Africa in Santiago Island Copyright © 2012 Gesto Energia S.A. 7 Gesto Company Presentation MARTIFER AND GESTO HAVE A STRONG BACKGROUND AND EXPERIENCE IN THE DEVELOPMENT OF RE PROJECTS… PROJECTS IN OPERATION LATE STAGE DEVELOPMENT PROJECTS CAPACITY CAPACITY (MW) (MW) 12.6 PORTUGAL PORTUGAL Ventiveste 400 6.3 Randado 80 27.6 USA WIND GERMANY Oilton 94 25.5 WIND BRAZIL 14.7 Bukowsko 16 POLAND POLAND 10.0 Rymanów 26 ROMANIA Babadaq 42 1.8 0.4 Ribeiradio 72 0.6 HYDRO PORTUGAL SOLAR SPAIN Carvão – Ribeira (*) 470 0.84 1.79 Baccinello (*) 6 1.8 GEO ITALY Mazzolla (*) 3 TOTAL 103.93 TOTAL 1218 (*) License in process Copyright © 2012 Gesto Energia S.A. 8 Gesto Company Presentation GESTO PRESENTATION GESTO EXPERIENCE CAPE VERDE EXPERIENCE GESTO WIND EXPERIENCE GESTO HAS KNOW-HOW AND EXPERIENCE IN THE DEVELOPMENT OF RENEWABLE ENERGY POLICY AND MASTER PLANS Renewable resource assessment Social economic studies Renewable projects identification and Electric System characterization and Demand forecasting and technical feasibility studies Source: Namibia project – Solar CSP Source: Cape Verde project Source: Mozambique Renewable Atlas – hydro example Economic, environmental, Renewable energy integration Renewable Energy Master Plan, and social impact evaluation scenarios and grid integration solutions infrastructure investment planning (project prioritization) and legislation review LCOE Cacongo (2,8 MW) (USD/MWh) Levelized Cost of Electricity (LCOE) VS Potência das 20 centrais hídricas estratégicas Incrementos previstos de Potência no Plano 2013-2017 Malongo (41 MW) Contentorizada Cabinda (40 MW) Cabinda (35 MW) Kianganga (17,4 MW) Soyo (1250 MW) Cacuaco (40 MW) Luachimo (36 MW) Dundo (33,2 MW) CFL (180 MW) Uíge (21,3 MW) Cazenga (442 MW) Kwanza Catumbela Queve e Longa Cubango Rocha Pinto (30 MW) Boavista (430 MW) Saurimo (27,5 MW) Mabubas (27,2 MW) Samba (40 MW) Morro Bento (40 MW) Catete (40 N’Dalatando (10 MW) Chicapa (16 MW) Viana (80 MW) MW) Malanje (20 MW) Cambambe (960 MW) Benfica Luanda(40 MW) Capanda (520 MW) Caculo Cabaça (2050 MW) Laúca (2060 MW) Quartéis (35 MW) Zango (23,2 MW) Chiumbe Dala (12 MW) Porto Amboim (3,6 MW) Gabela (3,51 MW) Cutato (4 MW) Sumbe (19,2 MW) Camacupa (2,47 MW) Moxico (5,12 MW) Cunje (4 MW) Chinguar (0,54 MW) Lomaum (50 MW) Kaluapanda/Kuito (10 MW) Lobito (20 MW) Biópio (10,8 MW) Quileva (120 MW) Huambo (17 MW) Cavaco (30 MW) Caála (7,16 MW) Gove (60 MW) Jamba Ya Oma (78 MW) Jamba Ya Mina (228 MW) Lubango (70 MW) Potência Xitoto (31,2 MW) Matala (40,8 MW) (MW) Namibe (13 MW) Zona Industrial Lubango (40 MW) Dala Aeroporto Namibe (10 MW) Benga Cafula Cuteca Zenzo I Zenzo Zenzo II Zenzo Salamba Carianga Tombwa (7,6 MW) Capunda Mucundi Bembeze Balalunga Quissonde 5 (Calindo) Parque Eólico Tombwa (100 MW) Utiundumbo 14 (Guengue) 15A (Calengue) 18A (Chipenda) 18B (Capitongo) Ondjiva (10 MW) Túmulo doCaçador Túmulo Source: Angola Energy 2025 project Source: S. Tomé study of solar PV power plant integration Source: Angola Energy 2025 project Copyright © 2012 Gesto Energia S.A. 10 Gesto Company Presentation GESTO SUPPORTS ALL PHASES OF RENEWABLE ENERGY PROJECT DEVELOPMENT 2nd 3rd Resource study and analysis 1st Project identification Renewable incentive policies (Resource Atlas) (location, power, etc) Source: Cape Verde project, Santiago island – hydro resource evaluation Source: East-Timor project Source: Cape Verde project 6th Licensing and project management 4th Project development 5th Grid study, optimization and renewable projects integration Control of general planning, schedules Global management of the contracts Reports, news and milestones • Preliminary studies • Civil and electrical contracts management • Commissioning supervising Source: Solar power plant (2,5 MW), Sal island – Cape Verde Source: GeSto study, hybrid-systems (Diesel + Solar) Copyright © 2012 Gesto Energia S.A. 11 Gesto Company Presentation GESTO IS A LEADING ENERGY CONSULTING COMPANY... Cape Verde Energy Solar CSP pre-feasibility Renewable energy Master Plan 2010-20 study for Namibia Atlas of Mozambique Angola Energy East Timor Project development Master Plan 2025 Renewable electrification plan in SADC Copyright © 2012 Gesto Energia S.A. 12 Gesto Company Presentation … SPECIALIZED IN THE EVALUATION OF RENEWABLE RESOURCES… Wind Solar Hydro Waves Geothermal Source: Gesto Energia, Atlas e Projectos Renováveis de Cabo Verde Copyright © 2012 Gesto Energia S.A. 13 Gesto Company Presentation GESTO DEVELOPED THE “PRE-FEASIBILITY STUDY FOR THE DEVELOPMENT OF A CSP POWER PLANT IN NAMIBIA”, UNDER WHICH THE SOLAR ATLAS OF NAMIBIA WAS DEVELOPED Example of multi criteria analysis Example of selected solar sites for visit Example of outputs Soil selection: • Alluvium Selection criteria: • San • 20 km to the • Gravel electric grid • Calcrete Plains • 10 km to the • Arenosols nearest 132kV • Calcisols substation • Fluvisols • 5 km to the nearest • Leptosols 66 kV substation) • Regosols Slope criteria (< 3%) Soil selection criteria Distance to electricity grid Solar Atlas of Namibia by Gesto Copyright © 2012 Gesto Energia S.A. 14 Gesto Company Presentation ANGOLA ENERGY STRATEGIC MASTER PLAN 2025 Development of the strategic master plan for the energy sector until 2025: • Renewable resources assessment (hydro, wind, solar, biomass/MSW)
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages51 Page
-
File Size-