Attachment B

Attachment B

Attachment B Plan Bay Area List of Significant Uncommitted Projects Tested in T-2035 and Core Capacity Transit Networks* Version Date: November 23, 2011 Project (Transit enhancements, bike and pedestrian Total Requested Core improvements and other non-capacity increasing projects are Total Cost T-2035 County RTPID Committed Funding Capacity not listed, but included in the plan process for consideration (2013$) Network Funding (2013$) (2013$) Network in the financially constrained plan.) Alameda 21100 I-580/Vasco Road interchange improvements $ 60.00 $ 51.60 $ 8.40 Yes Union City Intermodal Station infrastructure improvements Alameda 21123 $ 25.50 $ 19.20 $ 6.30 Yes Yes (Phase 2) Alameda 21126 Route 84 westbound HOV on-ramp from Newark Boulevard $ 12.80 $ - $ 12.80 Yes Yes Alameda 21144 I-80/Gilman Avenue Reconfiguration $ 25.20 $ 1.40 $ 23.80 Yes Yes Alameda 21475 I-580/First Street interchange improvements $ 40.00 $ 35.00 $ 5.00 Yes Alameda 21477 I-580/Greenville Road interchange improvements $ 46.00 $ 37.00 $ 9.00 Yes Yes Extend Fremont Boulevard to connect to I-880/Dixon Landing Alameda 21482 $ 47.80 $ - $ 47.80 Yes Road Alameda 21484 Widen Kato Road from Warren Avenue to Milmont Drive $ 12.30 $ 0.20 $ 12.10 Yes I-580/San Ramon Road/Foothill Road interchange Alameda 21489 $ 3.60 $ 2.50 $ 1.10 Yes improvements Extend HOV lane on I-880 northbound from existing HOV Alameda 22002 $ 19.00 $ - $ 19.00 Yes Yes terminus at Bay Bridge approach to Maritime on-ramp AC Transit transfer station/park-and-ride facility in Alameda Alameda 22021 $ 40.00 $ - $ 40.00 Yes Yes County (1. Central, 2. Northern) Widen I-680 for northbound HOV/HOT lane from Route 237 to Alameda 22042 $ 203.60 $ 21.50 $ 182.10 Yes Yes Route 84 (includes ramp metering and auxiliary lanes) Alameda 22062 Construct Irvington BART Station $ 123.00 $ - $ 123.00 Yes Yes Alameda 22082 7th Street Grade Separation & Roadway Improvement Project $ 220.50 $ 110.20 $ 110.30 Yes Yes Alameda 22089 Martinez Subdivision & Rail Improvements $ 62.00 $ - $ 62.00 Yes Yes Alameda 22455 AC Transit East Bay Bus Rapid Transit (BRT) $ 211.00 $ 173.10 $ 37.90 Yes Yes Alameda 22511 Berkeley/Albany to San Francisco ferry service $ 323.00 $ 290.70 $ 32.30 Yes Yes Alameda 22760 Outer Harbor Intermodal Terminals $ 216.70 $ 170.40 $ 46.30 Yes I-880 at 23rd/29th Avenue interchange safety and access Alameda 22769 $ 102.00 $ 98.50 $ 3.50 Yes Yes improvements Alameda 22776 Route 84 Expressway Widening (Pigeon Pass to Jack London) $ 136.50 $ 126.50 $ 10.00 Yes Construct grade separation at Warren Avenue/Union Pacific Alameda 22779 RR as Phase 2 of the Route 262/I-880 interchange $ 78.00 $ - $ 78.00 Yes Yes improvements Alameda 22780 AC Transit Grand-MacArthur BRT $ 36.00 $ - $ 36.00 Yes Yes Alameda 94506 East-West Connector Project in North Fremont and Union City $ 190.00 $ 106.70 $ 83.30 Yes Yes I880 Broadway/Jackson Interchange, ramp and circulation Alameda 98207 Improvements; and Alameda Point, Downtown Oakland, and $ 189.30 $ 8.10 $ 181.20 Yes Yes Jack London SquareTransit Access I-880 Northbound HOV/HOT Extension from north of Alameda 230088 $ 207.60 $ - $ 207.60 Yes Yes Hacienda to Hegenberger - Phase 1 I-880 Northbound HOV/HOT Extension from north of Alameda 230089 $ 68.40 $ - $ 68.40 Yes Yes Hacienda to Hegenberger - Phase 2 Union City Passenger Rail Station & Dumbarton Rail Segment Alameda 230101 $ 180.00 $ 33.50 $ 146.50 Yes G Improvement Alameda 230103 Grade Separation in the Decoto neighborhood $ 130.00 $ - $ 130.00 Yes Route 262 Mission Boulevard Cross Connector Improvements Alameda 230110 $ 19.50 $ - $ 19.50 Yes Yes between I-680 and Warm Springs Boulevard Auto Mall Parkway Cross Connector Widening between I-680 Alameda 230114 $ 24.40 $ - $ 24.40 Yes Yes and I-880 Alameda 230132 I-580/Isabel Avenue Interchange, Phase 2 $ 30.00 $ 25.20 $ 4.80 Yes Yes Alameda 230170 City of Oakland 42nd and High Access Improvements $ 17.10 $ 5.90 $ 11.20 Yes Yes Alameda 240018 Dumbarton Rail Corridor Phase I $ 107.10 $ 45.50 $ 61.60 Yes Alameda 240037 I-880/West Winton Avenue Interchange $ 25.00 $ 25.00 $ - Yes Yes *Service frequency improvements for BART, AC Transit, SFMTA, and Caltrain are not listed here, but included in Core Capacity Transit Network. 1 of 10 Attachment B Plan Bay Area List of Significant Uncommitted Projects Tested in T-2035 and Core Capacity Transit Networks* Version Date: November 23, 2011 Project (Transit enhancements, bike and pedestrian Total Requested Core improvements and other non-capacity increasing projects are Total Cost T-2035 County RTPID Committed Funding Capacity not listed, but included in the plan process for consideration (2013$) Network Funding (2013$) (2013$) Network in the financially constrained plan.) Alameda 240047 I-880/A Street Interchange Reconstruction $ 42.50 $ 42.50 $ - Yes Yes Alameda 240052 I-880 / Whipple Road Interchange Improvement $ 60.00 $ - $ 60.00 Yes Yes Widen I-680 for Northbound HOV/HOT Lane from Route 84 to Alameda 240059 $ 136.40 $ - $ 136.40 Yes Yes Alcosta Blvd Widen I-680 for southbound HOV/HOT from Alcosta Blvd to Alameda 240061 $ 136.40 $ - $ 136.40 Yes Yes Route 84 Alameda 240062 Route 84/I-680 Interchange and Route 84 Widening $ 244.00 $ - $ 244.00 Yes BART Rail Vehicle Capacity Expansion (Alameda County Alameda 240073 $ 444.00 $ - $ 444.00 Yes portion) Alameda 240075 BART Station Capacity (Alameda County portion) $ 294.70 $ - $ 294.70 Yes Alameda 240089 BART System Capacity (Alameda County portion) $ 78.30 $ - $ 78.30 Yes Lewelling Blvd. / Hesperian Blvd. Intersection Improvements Alameda 240092 $ 5.00 $ - $ 5.00 Yes Project Alameda 240113 BART Hayward Maintenance Complex $ 585.00 $ 5.30 $ 579.70 Yes Alameda 240180 BART Bay Fair Connection $ 150.00 $ - $ 150.00 Yes Alameda 240196 BART to Livermore Extension - Phase 1 $ 1,250.00 $ 144.00 $ 1,106.00 Yes Alameda 240249 San Leandro Street Circulation and Capacity Improvements $ 11.00 $ - $ 11.00 Yes Scarlett Drive Extension from Dougherty Road to Dublin Alameda 240261 $ 12.80 $ - $ 12.80 Yes Boulevard Alameda 240263 Upgrade Relinquished Route 84 in Fremont $ 43.30 $ - $ 43.30 Yes Alameda 240264 Widen Fremont Boulevard from I-880 to Grimmer Boulevard $ 4.60 $ - $ 4.60 Yes Alameda 240278 Harrison-Oakland Avenue Major Street Improvements $ 12.40 $ 0.70 $ 11.70 Yes Alameda 240280 Woodland - 81st Avenue Industrial Zone street reconstruction $ 11.50 $ - $ 11.50 Yes Alameda 240282 Tidewater District Street Reconstruction $ 5.00 $ 0.40 $ 4.60 Yes Platform Extension at Alameda and San Joaquin Co. ACE Alameda 240304 $ 5.00 $ - $ 5.00 Yes Stations Bay Area Region/Multi- 21627 Caltrain Electrification between Tamien and San Francisco $ 785.00 $ 261.00 $ 524.00 Yes Yes County Bay Area Region/Multi- 22003 Capitol Corridor: Phase 2 Service enhancements $ 96.50 $ 2.50 $ 94.00 Yes Yes County Bay Area Capitol Corridor intercity rail service service expansion Region/Multi- 22009 $ 510.50 $ 15.80 $ 494.70 Yes Yes (Oakland to San Jose) County Bay Area Region/Multi- 22247 Bicycle/Pedestrian Expansion $ 607.00 $ - $ 607.00 Yes County Bay Area Caltrain (San Francisco County share) transit operating and Region/Multi- 22481 capital improvement program (including replacement, $ 1,076.70 $ - $ - Yes County rehabilitation and system enhancements Bay Area Project Development for I-580/I-680 Interchange HOV Direct Region/Multi- 22765 $ 1,167.00 $ - $ 1,167.00 Yes Yes Connectors County Bay Area Region/Multi- 230055 Golden Gate Ferry Service Expansion $ 208.70 $ - $ 208.70 Yes County Bay Area I-80 ICM San Pablo Corridor Arterial & Transit Improvement Region/Multi- 230226 $ 24.40 $ 24.40 $ - Yes Project County Bay Area Caltrain Downtown Extension/Transbay Terminal Region/Multi- 230290 $ 2,348.00 $ 420.90 $ 1,927.10 Yes Yes Replacement (Phase 2B - FD, CON) County Bay Area Region/Multi- 230419 Freeway Performance Initiative $ 4,508.00 $ - $ 4,508.00 Yes Yes County *Service frequency improvements for BART, AC Transit, SFMTA, and Caltrain are not listed here, but included in Core Capacity Transit Network. 2 of 10 Attachment B Plan Bay Area List of Significant Uncommitted Projects Tested in T-2035 and Core Capacity Transit Networks* Version Date: November 23, 2011 Project (Transit enhancements, bike and pedestrian Total Requested Core improvements and other non-capacity increasing projects are Total Cost T-2035 County RTPID Committed Funding Capacity not listed, but included in the plan process for consideration (2013$) Network Funding (2013$) (2013$) Network in the financially constrained plan.) Bay Area Contra Flow Lanes on Westbound Lanes of San Francisco- Region/Multi- 230604 $ 610.50 $ - $ 610.50 Yes Oakland Bay Bridge County Bay Area Express Lanes on I-80 in Alameda and Contra Costa counties Region/Multi- 230656 from Route 4 to Bay Bridge - convert HOV lanes to express $ 41.40 $ - $ - Yes Yes County lanes Bay Area Express Lanes on I-80 in Contra Costa County from Carquinez Region/Multi- 230657 $ 8.90 $ - $ - Yes Yes Bridge to Route 4 - convert HOV lanes to express lanes County Bay Area Express Lanes on I-80 in Solano County from Route 37 to the Region/Multi- 230658 Carquinez Bridge - widen to add an express lane in each $ 161.90 $ - $ - Yes Yes County direction Bay Area Express Lanes on I-80 in Solano County from Red Top Road to Region/Multi- 230659 $ 130.70 $ - $ - Yes Yes Route 37 - widen to add an express lane in each direction County Bay Area Express Lanes on I-80 in Solano County from Red Top Road to Region/Multi- 230660 $ 19.20 $ - $ - Yes Yes Air Base Parkway - convert existing HOV lanes to express lanes County

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    10 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us