I-40 Douglas Boulevard Interchange Reconstruction and Related Widening Oklahoma County, Oklahoma

I-40 Douglas Boulevard Interchange Reconstruction and Related Widening Oklahoma County, Oklahoma

I-40 Douglas Boulevard Interchange Reconstruction and Related Widening Oklahoma County, Oklahoma Submitted Previously for FASTLANE? YES Project on NHFN? Yes/no YES Name in Previous Application Same Project Name Project on NHS? Yes/no YES Previously Incurred Project Cost: $4,909,700 Project to add Interstate capacity? Yes/no YES Future Eligible Project Cost: $122,220,000 Project in national scenic area? Yes/no NO Total Project Cost: $127,129,700 Rail grade crossing or separation included? NO FASTLANE Request: $73,332,000 Intermodal or freight rail project, or freight project Total Federal Funds (incl. FASTLANE) $97,776,000 within freight rail, water, or intermodal facility? NO Matching funds restricted to If yes, specify: specific project component? NO NSFHP $ to be spent on above two items: N/A I-40 Douglas FASTLANE Application submitted by the Oklahoma Department of Transportation, 2017 Supporting information can be found at: https://www.ok.gov/odot/Progress_and_Performance/Federal_Grant_Awards/FASTLANE_Grants.html ODOT Contact: Matthew Swift, SAPM Division Engineer, ODOT. (405) 521-2704 email: [email protected] State Oklahoma Inclusion in Planning Documents: Begin Lat/Long: 35˚26'0"N, 97˚22'30"W TIP: NO* End Lat/Long: 35˚24'8 "N, 97˚17'17"W STIP: NO* Size of project: Large MPO LRTP: YES Urbanized Area (UA): Oklahoma City State LRTP: YES UA population, 2014 919,230 State Freight Plan: NA * Elements of this project are included in the current STIP and TIP documents i I-40 Douglas FASTLANE Application submitted by Oklahoma Department of Transportation, 2017 ii Table of Contents Executive Summary ............................................................................................................................. 1 1. Project Description ........................................................................................................................... 2 1.1. Project Request [UPDATED] .............................................................................................................. 2 1.2. Project Elements Supported by FASTLANE Funds ............................................................................ 2 1.3. Project is Regionally and Nationally Significant ................................................................................ 3 1.4. Transportation Concerns and Existing Conditions ............................................................................ 3 2. Project Location ............................................................................................................................... 4 2.1. Connections to Existing Infrastructure ............................................................................................. 4 3. Project Parties .................................................................................................................................. 7 3.1. Project Sponsor ................................................................................................................................. 7 3.2. Key Supporting Stakeholders ............................................................................................................ 7 4. Sources/Uses of Project Funds [UPDATED] ....................................................................................... 8 5. Cost Effectiveness [UPDATED] .......................................................................................................... 9 5.1. BCA Assumptions .............................................................................................................................. 9 5.2. Results ............................................................................................................................................... 9 5.3. Non-Quantified Costs and Benefits ................................................................................................ 10 6. Selection Criteria ............................................................................................................................ 10 6.1. Mobility Outcomes ......................................................................................................................... 10 6.2. Economic Outcomes ....................................................................................................................... 12 6.3. Safety Outcomes ............................................................................................................................. 14 6.4. Community and Environmental Outcomes .................................................................................... 16 6.5. Innovation and Partnership ............................................................................................................ 19 6.6. Cost Share ....................................................................................................................................... 19 7. Project Readiness ........................................................................................................................... 19 7.1. Technical Feasibility ........................................................................................................................ 19 7.2. Approvals and Coordination ........................................................................................................... 21 7.3. Risks and Mitigation Strategies ....................................................................................................... 22 8. Large Project Requirements [NEW] ................................................................................................ 23 List of Tables Table 1: Population Growth [NEW since FY16 FASTLANE application] ............................................................. 6 Table 2: Employment Growth [NEW since FY16 FASTLANE application] .......................................................... 6 Table 3: Sources and uses of total project costs [UPDATED since FY16 FASTLANE application] ....................... 8 Table 4: Benefit Cost Analysis Summary ($2015) [UPDATED since FY16 FASTLANE application] ................... 10 Table 5: Oklahoma Forecasted Freight Tonnage Flow, 2015-2040 ................................................................. 12 Table 6: Crash History, 2006-2016 [UPDATED since FY16 FASTLANE application] ......................................... 15 Table 7: Earthquake Inspection Policy, ODOT 2016 [UPDATED since FY16 FASTLANE application] .............. 22 iii List of Figures Figure 1: I-40 Douglas Project Location ............................................................................................................. 2 Figure 2: Project along Major Trucking Routes .................................................................................................. 3 Figure 3: Shipping US Marine Corps F153 engines by truck from Tinker AFB after retrofit ............................. 5 Figure 4: Westbound morning traffic on I-40 .................................................................................................... 6 Figure 5: Project Funding Sources [UPDATED since FY16 FASTLANE application] s ......................................... 8 Figure 6: Interstate Highways .......................................................................................................................... 10 Figure 7: Eastern Oklahoma County Turnpike Extension ................................................................................ 11 Figure 8: Members of the 565th Aircraft Maintenance Squadron install engine ............................................ 13 Figure 9: Tinker Air Force Base KC-46 Aircraft Center ..................................................................................... 14 Figure 10: Oklahoma Governor Fallin at the opening of Boeing's new facility ............................................... 14 Figure 11: Acceleration and Deceleration Lanes ............................................................................................. 15 Figure 12: Douglas Boulevard Bridge - Deck repairs needed ........................................................................... 16 Figure 13: Anderson Road Bridge -Beam repairs needed ................................................................................ 16 Figure 14: Substandard Truck Clearance under Anderson Road ..................................................................... 17 Figure 15:Proposed Douglas Interchange Redesign Alternatives [UPDATED since FY16 FASTLANE application] .. 18 Figure 16: Crews hang beam for I-235 ............................................................................................................ 19 Figure 17: Project Schedule [UPDATED since FY16 FASTLANE application] .................................................... 20 Supporting Materials Supporting documentation can be found at the project website Oklahoma I-40 DOT FASTLANE, and include: • Reports and Technical Information (including the BCA Technical Memo) • Certifications and Assurances • Maps and Graphics • Letters of Support iv 200 N.E. 21st Street Oklahoma City, OK 73105-3204 OKLAHOMA DEPARTMENT OF TRANSPORTATION www.odot.org MEMORANDUM: TO: U.S. Department of Transportation, Office of the Assistant Secretary for Transportation Policy FROM: Matthew Swift, P.E., Strategic Asset and Performance Management Division Engineer DATE: December 14, 2016 RE: I-40 Douglas Boulevard Interchange Reconstruction and Related Widening, Oklahoma County, Oklahoma The Oklahoma Department of Transportation (ODOT) submitted the subject

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    30 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us