Opekiska Lock and Dam Hydroelectric Project, FERC Project No

Opekiska Lock and Dam Hydroelectric Project, FERC Project No

20160930-3010 FERC PDF (Unofficial) 09/30/2016 MULTI-PROJECT ENVIRONMENTAL ASSESSMENT FOR HYDROPOWER LICENSE Opekiska Lock and Dam Hydroelectric Project, FERC Project No. 13753-002 Morgantown Lock and Dam Hydroelectric Project, FERC Project No. 13762-002 West Virginia Point Marion Lock and Dam Hydroelectric Project, FERC Project No. 13771-002 Grays Landing Lock and Dam Hydroelectric Project, FERC Project No. 13763-002 Maxwell Locks and Dam Hydroelectric Project, FERC Project No. 13766-002 Monongahela Locks and Dam 4 Hydroelectric Project, FERC Project No. 13767-002 Pennsylvania Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing 888 First Street, NE Washington, D.C. 20426 September 2016 20160930-3010 FERC PDF (Unofficial) 09/30/2016 TABLE OF CONTENTS LIST OF FIGURES ............................................................................................................iii LIST OF TABLES............................................................................................................... v ACRONYMS AND ABBREVIATIONS........................................................................... ix EXECUTIVE SUMMARY ................................................................................................ xi 1.0 INTRODUCTION.................................................................................................... 1 1.1 Applications................................................................................................... 1 1.2 Purpose of Action and Need For Power...................................................... 11 1.2.1 Purpose of Action .......................................................................... 11 1.2.2 Need for Power.............................................................................. 11 1.3 Statutory and Regulatory Requirements ..................................................... 12 1.3.1 Federal Power Act ......................................................................... 12 1.3.2 Clean Water Act ............................................................................ 13 1.3.3 Endangered Species Act................................................................ 14 1.3.4 Coastal Zone Management Act ..................................................... 16 1.3.5 National Historic Preservation Act................................................ 17 1.4 Public Review and Comment...................................................................... 18 1.4.1 Scoping .......................................................................................... 18 1.4.2 Interventions .................................................................................. 20 1.4.3 Comments on the License Applications........................................ 20 1.4.4 U.S. Army Corps of Engineers – Terms and Conditions .............. 21 2.0 PROPOSED ACTION AND ALTERNATIVES................................................... 23 2.1 No-action Alternative .................................................................................. 23 2.2 Applicants’ Proposals.................................................................................. 23 2.2.1 Existing Corps Facilities................................................................ 23 2.2.2 Existing Corps Operations............................................................. 25 2.2.3 Proposed Project Facilities ............................................................ 25 2.2.4 Project Safety................................................................................. 30 2.2.5 Proposed Project Operation........................................................... 30 2.2.6 Proposed Environmental Measures ............................................... 33 2.3 STAFF ALTERNATIVE ............................................................................ 35 2.4 ALTERNATIVES CONSIDERED BUT ELIMINATED FROM DETAILED STUDY................................................................................... 36 3.0 ENVIRONMENTAL ANALYSIS......................................................................... 38 3.1 General Description of the River Basin ...................................................... 38 3.2 Scope of Cumulative Effects Analysis........................................................ 39 3.2.1 Geographic Scope.......................................................................... 39 i 20160930-3010 FERC PDF (Unofficial) 09/30/2016 3.2.2 Temporal Scope............................................................................. 40 3.3 Proposed Action and Action Alternatives................................................... 40 3.3.1 Geology and Soil Resources.......................................................... 41 3.3.2 Aquatic Resources ......................................................................... 47 3.3.3 Terrestrial Resources ................................................................... 122 3.3.4 Threatened and Endangered Species........................................... 140 3.3.5 Recreation and Land Use Resources ........................................... 147 3.3.6 Aesthetic Resources..................................................................... 169 3.3.7 Cultural Resources....................................................................... 171 3.4 No-action Alternative ................................................................................ 189 4.0 DEVELOPMENTAL ANALYSIS ...................................................................... 190 4.1 Power and Developmental Benefits of the Projects.................................. 190 4.2 Comparison of Alternatives ...................................................................... 196 4.2.1 No-action Alternative .................................................................. 200 4.2.2 Applicants’ Proposals.................................................................. 200 4.2.3 Staff Alternative .......................................................................... 201 4.3 Cost of Environmental Measures .............................................................. 202 5.0 CONCLUSIONS AND RECOMMENDATIONS............................................... 265 5.1 Comprehensive Development and Recommended Alternative ................ 265 5.1.1 Measures Proposed by the Applicants......................................... 265 5.1.2 Additional Staff-recommended Measures................................... 267 5.1.3 Measures Not Recommended by Staff........................................ 281 5.2 Unavoidable Adverse Effects.................................................................... 284 5.3 Fish and Wildlife Agency Recommendations........................................... 286 5.4 Consistency with Comprehensive Plans ................................................... 287 6.0 FINDING OF NO SIGNIFICANT IMPACT ...................................................... 289 7.0 LITERATURE CITED......................................................................................... 290 8.0 LIST OF PREPARERS ........................................................................................ 301 ii 20160930-3010 FERC PDF (Unofficial) 09/30/2016 LIST OF FIGURES Figure 1-1. Location map of the Monongahela River Projects, Allegheny Project, and Ohio River Projects ................................................................... 2 Figure 1-2. Location map of the Opekiska Project .......................................................... 5 Figure 1-3. Location map of the Morgantown Project..................................................... 6 Figure 1-4. Location map of the Point Marion Project .................................................... 7 Figure 1-5. Location map of the Grays Landing Project ................................................. 8 Figure 1-6. Location map of the Maxwell Project ........................................................... 9 Figure 1-7. Location map of the Charleroi Project ........................................................ 10 Figure 2-1. Grays Landing Project headwater rating curve for normal operation......... 32 Figure 3-1. Modeled DO concentrations downstream of the Opekiska Project during an average year (2009) and dry year (1999).................................... 83 Figure 3-2. Modeled DO concentrations downstream of the Morgantown Project during an average year (2009) and dry year (1999).................................... 84 Figure 3-3. Modeled DO concentrations downstream of the Point Marion Project during an average year (2009) and dry year (1999).................................... 85 Figure 3-4. Modeled DO concentrations downstream of the Grays Landing Project during an average year (2009) and dry year (1999)........................ 86 Figure 3-5. Modeled DO concentrations downstream of the Maxwell Project during an average year (2009) and dry year (1999).................................... 87 Figure 3-6. Modeled DO concentrations downstream of the Charleroi Project during an average year (2009) and dry year (1999).................................... 88 Figure 3-7. Modeled minimum DO concentrations along the Monongahela River between June 15 to September 30, 2009 (average year)........................... 116 Figure 3-8. Modeled minimum DO concentrations along the Monongahela River between June 15 to September 30, 1999 (dry year) .................................. 117 Figure 3-9. Difference in DO concentrations upstream of the Ohio River Projects, with and without the Monongahela and Allegheny River

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    332 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us