SB1 Factsheet TCEP 2020 Stockton Diamond Grade Seperation

SB1 Factsheet TCEP 2020 Stockton Diamond Grade Seperation

2020 Trade Corridor Enhancement Program Fact Sheet: Stockton Diamond Grade Separation Caltrans – San Joaquin Regional Rail Commission Contact: Rob Cunningham, Senior Transportation Planner | [email protected] | (916) 956-6686 www.dot.ca.gov/drmt Project Location San Joaquin County | City of Stockton | BNSF Railway Stockton Subdivision | UPRR Fresno Subdivision Project Scope The Stockton Diamond is the busiest, most congested at-grade railway junction in California. The Stockton Diamond Grade Separation Project will grade separate the two north-south Union Pacific Railroad (UPRR) mainline tracks from the two east-west BNSF Railway (BNSF) mainline tracks. This will involve the construction of a Flyover Structure to provide the vertical clearance required by both railroads. The Structure will span the Stockton Diamond and will eliminate the interference between the railroads at this location. Project Cost Total Project Cost: $ 237,132,800 Total TCEP Request: $ 100,000,000 Project Schedule PA&ED: PS&E: RTL: R/W: Beg CON: End CON: 02/01/2020 06/01/2021 04/01/2023 06/01/2021 05/01/2023 05/01/2026 Project Benefits The Project would eliminate a key freight rail bottleneck in Stockton, increasing efficiency, throughput, velocity, and reliability for freight trains. This will result in cost savings for freight rail movement and travel time savings for the railroads, reducing 142,192 hours of delays over a 20-year period. The improvements to the freight rail system will also benefit passenger services in the area. The Project would result in a decrease of delays for the Amtrak San Joaquins and Altamont Corridor Express (ACE) services, decreasing delays by 2,463,304 passenger hours over a 20- year period. Decreased congestion on the rail lines will also reduce delays to motorists on the local roadways. The Project would reduce vehicle hours of travel time by 35,733 hours over the same period. Other Project benefits include: • Improved Air Quality through the reduction of idling locomotives and vehicles: o Reducing 80,321 tons of CO2, 1.37 tons of PM10, 1.01 tons of PM2.5, 39.2 tons of VOC, 0.72 tons of SOx, 414.4 tons of CO, and 141.9 tons of NOx. • Decreased consumption of 24,516 gallons of diesel for freight, switch, and passenger trains, and 332,210 gallons of diesel and 804,966 gallons of gasoline for vehicles. • Facilitated expansion of the ACE and San Joaquins services and increased reliability. Stockton Diamond Grade Separation 08/03/2020 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us