Foreign-Assisted Projects, by Donor/Creditor, FY 2019-2021

Foreign-Assisted Projects, by Donor/Creditor, FY 2019-2021

414 TABLE B.14 FOREIGN-ASSISTED PROJECTS BY DONOR / CREDITOR, FY 2019-2021 (In thousand pesos) TOTAL PROJECT COST CUMULATIVE FUND UTILIZATION (CASH-BASED) PROJECT DURATION (In '000 PH Pesos) (In '000 PH Pesos) FY 2020 PROGRAM FY 2021 PROPOSED Loan/Grant Proceeds (As of December 31, 2019) LOAN (L) / Donor/ IMPLEMEN GRANT (G) DEPARTMENTS / PROJECT TITLE Creditor TING Number Peso PESO LOAN GRANT PESO LOAN GRANT AGENCY Start End TOTAL TOTAL TOTAL Counterpart PESO Peso Loan/Grant Counterpart Proceeds Proceeds Counterpart Proceeds Proceeds Currency AMOUNT TOTAL EQUIVALENT Counterpart Proceeds ASIAN DEVELOPMENT BANK (ADB) 1,912,320 9,639,173 - 11,551,493 2,722,165 45,034,317 - 47,756,482 Loan 1,912,320 9,639,173 - 11,551,493 2,722,165 45,034,317 - 47,756,482 (L) 2836-PHI Road Improvement and Instituional Development DPWH 2013 2019 2,978,679 USD - 3,956,000 6,934,679 2,221,359 4,229,269 6,450,628 121,244 - - 121,244 - - - - Project (RIIDP) (L) 2957-PHI Integrated Natural Resources Environmental 732,835 USD 83,027 3,986,794 4,719,629 650,637 2,515,509 3,166,146 181,322 190,510 - 371,832 4,500 60,000 - 64,500 Management Project (INREMP) DENR-OSEC 2013 2021 726,620 USD 52,381 2,619,016 3,345,636 646,018 1,971,036 2,617,054 176,496 190,510 - 367,006 - 60,000 - 60,000 DA-OSEC 2017 2021 6,215 USD 10,000 480,000 486,215 4,619 238,930 243,549 4,826 - - 4,826 4,500 - - 4,500 (L) 3589-PHI Infrastructure Preparation and Innovation Facility 2018 2021 2,969,700 - - 4,949,500 7,919,200 1,239,438 2,684,076 3,923,514 357,624 801,051 - 1,158,675 952,198 1,076,981 - 2,029,179 (IPIF) DPWH 1,976,330 3,303,300 5,279,630 797,508 1,711,518 2,509,026 249,431 548,600 - 798,031 794,294 920,871 - 1,715,165 Output 1 1,976,330 - - 3,303,300 5,279,630 688,052 804,008 1,492,060 173,951 420,080 - 594,031 709,970 409,245 - 1,119,215 Output 2 109,456 907,510 1,016,966 75,480 128,520 - 204,000 84,324 511,626 - 595,950 DOTr-OSEC 993,370 1,646,200 2,639,570 441,930 972,558 1,414,488 108,193 252,451 - 360,644 157,904 156,110 - 314,014 Output 3 993,370 - - 1,646,200 2,639,570 441,930 972,558 1,414,488 108,193 252,451 - 360,644 157,904 156,110 - 314,014 (L) 3631-PHI Improving Growth Corridors in Mindanao Road Sector DPWH 2018 2023 6,177,420 USD 380,000 19,079,800 25,257,220 636,078 1,924,560 2,560,638 965,415 236,560 - 1,201,975 1,323,509 5,647,254 - 6,970,763 Project (L) 3769-PHI Reconstruction and Development Plan for Greater DPWH 2019 2023 1,072,150 - - 5,443,440 6,515,590 - 8,000 8,000 256,315 - - 256,315 226,458 1,548,160 - 1,774,618 Marawi (Stage 2) (L) 3796-PHI North-South Commuter Railway System 1/ DOTr-OSEC 2016 2026 109,101,471 USD 1,800,000 285,657,018 394,758,489 4,900,810 - 4,900,810 - 8,411,052 - 8,411,052 - 31,687,580 - 31,687,580 (L) 3886-PHI Infrastructure Preparation and Innovation Facility DOTr-OSEC 2020 2024 349,940 2,918,160 3,268,100 - - - - - - - 97,061 808,838 - 905,899 (IPIF) - Additional Financing (AF) (L) 3944-PHI Local Governance Reform Project DOF-BLGF 2020 2024 172,532 USD 26,600 1,390,249 1,562,781 - - - - - - - 80,762 - - 80,762 (L) Capacity Building to Foster Competition OEO-PCC 2019 2025 228,187 USD 25,000 1,307,749 1,535,936 - - - 30,400 - - 30,400 37,677 - - 37,677 (L) Health System Enhancement to Address and Limit DOH-OSEC 2020 2023 - USD 125,000 6,353,750 6,353,750 - - - - - - - - 4,205,504 - 4,205,504 (HEAL) COVID-19 (L) Priority Bridges crossing Pasig - Marikina River and DPWH 2019 2023 2,546,840 - - 11,168,060 13,714,900 - - - - - - - - - - - Manggahan Floodway Bridges Construction Project, under ADB Financing Facility ASIAN INFRASTRUCTURE INVESTMENT BANK - 159,903 - 159,903 - 251,569 - 251,569 Loan - 159,903 - 159,903 - 251,569 - 251,569 (L) 000023-1-PH Metro Manila Flood Management Project, Phase I ALGU-MMDA 2018 2023 - USD 24,807 1,165,939 1,165,939 - 75,725 75,725 - 159,903 - 159,903 - 251,569 - 251,569 AUSTRIA - - - - 994,791 2,727,627 - 3,722,418 Loan - - - - 994,791 2,727,627 - 3,722,418 (L) Bridge Construction Acceleration Project for DPWH 2018 2023 1,755,081 EURO - 9,614,000 11,369,081 - - - - - - - 994,791 2,727,627 - 3,722,418 Socioeconomic Development CANADA - - - - - - - - CANADA INTERNATIONAL DEVELOPMENT AUTHORITY (CIDA) - - - - - - - - Grant - - - - - - - - (G) A030597 Supporting women's Economic Empowerment (WEE) in DILG-PCW 2015 2020 - CAD 8,000 324,718 324,718 - 206,132 206,132 - - - - - - - - the Philippines GREAT Women Project 2 CHINA 2,999,552 2,892,111 - 5,891,663 7,437,346 19,116,856 - 26,554,202 Loan 2,609,583 2,892,111 - 5,501,694 6,947,724 19,116,856 - 26,064,580 (L) Ambal-Simuay River and Rio Grande de Mindanao River DPWH 2019 2023 7,049,450 - - 32,170,220 39,219,670 - - - 625,628 1,202,929 - 1,828,557 5,167,697 11,693,724 - 16,861,421 Flood Control Projects (L) Chico River Pump Irrigation Project BSGC-NIA 2018 2021 1,237,512 - - 3,135,385 4,372,897 637,246 500,308 1,137,554 357,330 1,091,477 - 1,448,807 501,782 900,000 - 1,401,782 (L) Mindanao Railway Project 2/ DOTr-OSEC 2018 2022 - - - - - 3,309,701 - 3,309,701 96,143 - - 96,143 - - - - (L) PNR South Long Haul Project DOTr-OSEC 2015 2022 55,322,000 - - 119,996,781 175,318,781 4,791,000 - 4,791,000 877,137 - - 877,137 557,607 2,424,382 - 2,981,989 (L) Priority Bridges crossing Pasig - Marikina River and DPWH 2019 2023 3,257,460 - - 12,033,760 15,291,220 - - - 653,345 597,705 - 1,251,050 720,638 4,098,750 - 4,819,388 Manggahan Floodway Bridges Construction Project, under China Government Financing Facility TABLE B.14 FOREIGN-ASSISTED PROJECTS BY DONOR / CREDITOR, FY 2019-2021 (In thousand pesos) TOTAL PROJECT COST CUMULATIVE FUND UTILIZATION (CASH-BASED) PROJECT DURATION (In '000 PH Pesos) (In '000 PH Pesos) FY 2020 PROGRAM FY 2021 PROPOSED Loan/Grant Proceeds (As of December 31, 2019) LOAN (L) / Donor/ IMPLEMEN GRANT (G) DEPARTMENTS / PROJECT TITLE Creditor TING Number Peso PESO LOAN GRANT PESO LOAN GRANT AGENCY Start End TOTAL TOTAL TOTAL Counterpart PESO Peso Loan/Grant Counterpart Proceeds Proceeds Counterpart Proceeds Proceeds Currency AMOUNT TOTAL EQUIVALENT Counterpart Proceeds Grant 389,969 - - 389,969 489,622 - - 489,622 (G) China Aid Localized Project for Davao River Bridge DPWH 2020 2022 730,391 5,472,450 6,202,841 - - - 19,417 - - 19,417 171,040 - - 171,040 (Bucal Bridge) (G) Philippine-Sino Center for Agriculture Technology - DA-OSEC 2018 2021 90,000 RMB 27,520 213,222 303,222 22,335 - 22,335 - - - - 30,950 - - 30,950 Technical Cooperation Program III (PHILSCAT-TCP III) (G) Two China Aid Bridges Project: Estrella-Pantaleon DPWH 2020 2022 937,000 5,472,450 6,409,450 - - - 370,552 - - 370,552 287,632 - - 287,632 Bridge and Binondo-Intramuros FRANCE 16,800 - - 16,800 - - - - Grant 16,800 - - 16,800 - - - - (G) Disaster Risk Management - Institutional Strengthening DILG-OSEC 2015 2020 32,691 EU 4,800 249,072 281,763 32,570 13,523 46,093 16,800 - - 16,800 - - - - (DRM-IS) Technical Assistance Project GLOBAL ENVIRONMENT FACILITY (GEF) - - - - - - - - Grant - - - - - - - - (G) 0325-PHI Integrated Natural Resources Environmental DENR-OSEC 2013 2021 - USD 2,500 125,000 125,000 - 20,334 20,334 - - - - - - - - Management Project (INREMP) (G) TF 017788 Philippine Rural Development Program DA-OSEC 2013 2022 - USD 7,000 278,000 278,000 - 169,691 169,691 - - - - - - - - GERMANY - - - - - - - - KREDITANSTALT fur WIEDERAUFBAU (KfW) - - - - - - - - Grant - - - - - - - - (G) Gawad Angat Bayan (GABAY) Program BSGC-LBP 2018 2020 - - - 19,188 19,188 - 9,594 9,594 - - - - - - - - INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT (IBRD) 806,816 2,241,486 - 3,048,302 656,727 1,724,009 - 2,380,736 Loan 806,816 2,241,486 - 3,048,302 656,727 1,724,009 - 2,380,736 (L) 7552-PH National Roads Improvement and Management Project, DPWH 2010 2018 5,806,882 USD 232,000 10,284,612 16,091,494 5,203,460 8,885,983 14,089,443 - - - - - - - - Phase II (L) 8335-PH Kapit-Bisig Laban sa Kahirapan - Comprehensive and DSWD-OSEC 2014 2020 - USD 479,000 19,447,400 19,447,400 - 20,775,772 20,775,772 - - - - - - - - Integrated Delivery of Social Services: Kapangyarihan at Kaunlaran sa Barangay (KALAHI-CIDSS) - National Community Driven Development Program (NCDDP) (L) 8421-PH Philippine Rural Development Program DA-OSEC 2013 2022 3,578,780 USD 508,250 20,828,390 24,407,170 3,717,220 20,201,596 23,918,816 66,525 466,325 - 532,850 33,847 - - 33,847 (L) 8784-PH Metro Manila Flood Management Project, Phase I ALGU-MMDA 2018 2023 - USD 24,807 1,165,939 1,165,939 - 75,823 75,823 - 159,903 - 159,903 - 251,570 - 251,570 (MMFMP1) (L) 8816-PH Expansion of the Philippine Rural Development Project DA-OSEC 2017 2022 1,116,000 USD 170,000 7,905,000 9,021,000 575,910 4,053,312 4,629,222 240,291 1,615,258 - 1,855,549 122,880 421,445 - 544,325 (L) 9105-PH Philippines COVID-19 Emergency Response Project DOH-OSEC 2020 2023 - USD 100,000 5,090,000 5,090,000 - - - - - - - - 1,050,994 - 1,050,994 (ERP) (L) 9141-PH Support to Parcelization of Lands for Individual Titling DAR 2020 2023 5,384,936 USD 370,000 19,240,001 24,624,937 - - - 500,000 - - 500,000 500,000 - - 500,000 (SPLIT) Project (L) Cebu Bus Rapid Transit (BRT) Project DOTr-OSEC 2014 2018 6,161,580 - - 8,924,680 15,086,260 3,171,276 865,897 4,037,173 - - - - - - - - (L) Metro Manila BRT Line 1 (Quezon Avenue) Project DOTr-OSEC 2016 2020 870,460 - - 3,918,620 4,789,080 8,872 - 8,872 - - - - - - - - (L) Metro Manila BRT Line 2 (EDSA) Project 3/ DOTr-OSEC - - - - - - - 948,774 - 948,774 - - - - - - - - Grant - - - - - - - - (G) TF017736-PH Studies for Sustainable Flood Management Project DPWH 2017 2019 - USD 3,200 148,394 148,394 - 90,862 90,862 -

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    5 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us