East Side Access Network Expansion Project

East Side Access Network Expansion Project

Metropolitan Transportaon Authority’s East Side Access Network Expansion Project CG/LA North American Strategic Infrastructure Leadership Forum Michael Horodniceanu, Ph.D., P.E. President, MTA Capital Construc.on Updated 10/29/13 MTA Capital Construc1on 9:45am 1 *Licensed in California East Side Access New Terminal Staon for Long Island Rail Road on the East Side of Manhaan, saving east bound commuters 30-40 minutes daily • Total Investment $9.3 B • Completion 2019 East Side Access Alignment New York’s MTA NetworkMTA Capital Construc1on – Lifeblood of $1.4 trillion Regional Economy2 Why Build East Side Access? • Capacity limitations were choking new growth of the entire transit system in New York City – LIRR is at capacity – Penn Station is at capacity – About 50% of LIRR customers ultimately go to the east side of Manhattan – First expansion of LIRR in 100 years • East Side Access provides a new link to the city’s economic center, protecting New York’s competitive standing in the global economy • ESA is supporting 2,400 direct jobs and tens of thousands more indirect jobs throughout the national economy MTA Capital Construc1on 3 • Provides a one seat ride for 162,000 East Side Access passengers per day Benefits • Saves East Side bound commuters 30-40 minutes per day • Improves flow at Penn Station by relieving congestion • Increases East River tunnel capacity by 50% • Supports job growth in area surrounding Grand Central Terminal • Improves operational flexibility through Harold Interlocking (Amtrak, Long Island Rail Road, New Jersey Transit) • Improves access to John F. Kennedy airport MTA Capital Construc1on Platform and lower mezzanine elevator4 rendering East Side Access • Breaking Ground October 2002 • Queens and Manhattan • Tunnels – 8 Newly bored Manhattan Tunnels: 6.1 miles hard rock – 4 Newly bored Queens Tunnels: 2 miles soft ground – Existing 63rd Street Tunnel: 3.2 miles • Grand Central – New Terminal Station Profile Around GCT – 8 tracks, 4 platforms – Mezzanines and Grand Central Concourses Terminal – 47 Escalators and New Concourse 22 Elevators MTA Capital Construc1on 5 New Platforms beneath Park Ave Mined Caverns and Shafts Below Grand Central Vanderbilt Park Avenue Avenue MNR Upper Level MNR Lower Level Off Street Freight Entrances 91’-0” 140’-0” Elevators LIRR Concourse Passenger Escalator Upper Elevators Shafts at 30⁰ Platform LIRR Mezzanine West Cavern East Cavern Lower Platform 61’-2” Terminal Caverns 10’-7” Section Looking North 13’-0” 9’-5” 27’-4” MTA Capital Construc1on 6 51’-11” Financing – East Side Access • $8.245 B • Local Funding: $5.546 B $10,000 Federal Funding: $2.699 B $9,000 • All Federal funding approved $8,000 Federal 32% through a New Starts Full Funding $7,000 Grant Agreement with the FTA $6,000 • An additional $463 M budgeted for ESA rolling stock is included in $5,000 a reserve in the 2010-2014 MTA $4,000 Capital Program $3,000 Local 68% • An additional $590 M budgeted $2,000 for Regional Investment ($297 M $1,000 FRA funded) • Total Investment $9.3 B $0 $ in millions MTA Capital Construc1on 7 Capacity Building • Investments in the system began a rebirth of NY that began in the 1990’s. The MTA must continue to invest in its system in order to achieve 2030 levels of forecasted population and employment growth. § NYC Forecasted Population: 9.4+ M by 2030 § Regional Forecasted Population: 26+ M by 2030 MTA Capital Construc1on 8 Regional Economic Investment • The New York region, whose economy is second only to Tokyo’s, could not exist without the MTA • Rebuilding the MTA was critical to establishing New York’s competitive position, but now capacity limitations choke new economic growth – Long Island Rail Road cannot meet the needs of Long Island, which has a population equivalent to the nation’s third largest city (Chicago), to reach jobs in Manhattan • East Side Access provides new links to our economic center, keeping jobs in the US and New York’s competitive standing in the global economy MTA Capital Construc1on 9 To support this economy, the MTA… • Provides 8.5 million transit rides a day • Manages a 2013 annual operating budget of $13.2 billion • 2010-2014 Capital Program is $35 billion – $24 billion core – $10.7 billion for Hurricane Sandy • Creates Jobs – The 2010-2014 Capital Program generates 350,000 jobs in NY State and nearly 300,000 jobs nationally* – $44 billion impact on NY State* MTA Capital Construc1on 10 *per APTA economic model ESA Procurements Contract Range Timeframe CM006 - North of Caverns Tunnel Linings & Structures 0ver $100M 2014 CM014B - GCT Concourse & Cavern Finishes 0ver $100M 2014 CM012 A - Queens Bellmouth Closure $10M - $50M 2014 CH057 - Harold Structures (Part 3) $50M - $100M 2014 CS084 - Traction Power 0ver $100M 2014 CS284 - System Package 2 0ver $100M 2015 CM007 - Caverns & Access Tunnel Interfaces 0ver $100M 2015 CH061 - Tunnel A Approach Connection $10M - $50M 2015 CM015 - 48th Street Entrance $10M - $50M 2015 CH058 - Harold Structures (Part 3) $10M - $50M 2015 CQ033 - Mid-Day Storage Yard Facilities 0ver $100M 2015 MTA Capital Construc1on 11 Contact Informaon • David K. Cannon • MTA Capital Construction • Sr. Director and Chief Procurement Officer • [email protected] • www.mta.info/capital MTA Capital Construc1on 12 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    12 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us