Name Estimated Cost Municipality Alternative Energy Lab $10,000,000.00 Red Deer Bowden Re-Refinery $90,000,000.00 Red Deer Count

Name Estimated Cost Municipality Alternative Energy Lab $10,000,000.00 Red Deer Bowden Re-Refinery $90,000,000.00 Red Deer Count

Name Estimated Cost Municipality Alternative Energy Lab $10,000,000.00 Red Deer Bowden Re-refinery $90,000,000.00 Red Deer County Elevator Modernization, Red Deer Regional Hospital $5,000,000.00 Red Deer Hwy 2 interchange/Gaetz Ave $79,800,000.00 Red Deer County|Red Deer North Highway Connector $10,600,000.00 Red Deer North Red Deer Regional Wastewater Line $71,000,000.00 Red Deer|Blackfalds|Lacombe|Lacombe County|Red Deer County North Red Deer Regional Wastewater Line $71,000,000.00 Red Deer|Blackfalds|Lacombe|Lacombe County|Red Deer County Northside Community Centre $6,500,000.00 Red Deer Paterson Grain Terminal $50,000,000.00 Red Deer County Piper Creek Lodge Replacement Building $12,000,000.00 Red Deer RDC Centre for Health, Wellness and Sport $88,000,000.00 Red Deer Red Deer 2015 Road Construction $7,900,000.00 Red Deer Red Deer Area Transmission Development $350,000,000.00 Red Deer County Red Deer Arena Replacement $21,600,000.00 Red Deer Red Deer County 2015 Road Projects $6,000,000.00 Red Deer County Red Deer Courthouse $97,000,000.00 Red Deer Red Deer Emergency Services Stations $15,000,000.00 Red Deer Roadwork - 804510 $5,300,000.00 Red Deer County Sylvan Lake Wastewater Line $41,200,000.00 Red Deer|Red Deer County|Sylvan Lake Water and Sewer Services to NE Red Deer $22,000,000.00 Red Deer Westpark Middle School Replacement $13,000,000.00 Red Deer Schedule Sector Type Stage Developer 2017 - 2018 Institutional Post-Secondary Under Construction Red Deer College 2018 - 2019 Oil and Gas Upgrader Proposed Gen III Oil Corp. Commencing 2015 Institutional Health Care Under Construction Alberta Health Services 2016 - 2018 Infrastructure Roadwork Under Construction Alberta Transportation Infrastructure Roadwork Proposed City of Red Deer 2017 - 2018 Infrastructure Water/Wastewater Under Construction City of Red Deer 2017 - 2018 Infrastructure Water/Wastewater Under Construction City of Red Deer 2017 - 2018 Tourism / Recreation Community Centre Under Construction City of Red Deer Commencing 2017 Industrial Agriculture Under Construction Grains Connect Canada Commencing 2018 Institutional Continuing Care Proposed Piper Creek Foundation 2015 - 2018 Institutional Post-Secondary Under Construction Red Deer College Infrastructure Roadwork Proposed City of Red Deer 2014 - 2018 Power Transmission Line Under Construction AltaLink Management Ltd. 2016 - 2018 Tourism / Recreation Sports Facility Under Construction City of Red Deer Infrastructure Roadwork Proposed Red Deer County Commencing 2018 Institutional Other Proposed Alberta Infrastructure Institutional Emergency Services Proposed City of Red Deer Infrastructure Roadwork Proposed Alberta Transportation 2018 - 2020 Infrastructure Water/Wastewater Proposed Sylvan Lake Regional Wastewater Commission Infrastructure Water/Wastewater Proposed City of Red Deer 2017 - 2018 Institutional School Under Construction Red Deer Public School District Contractor Project Website Detail Construction of the 4,000 square foot lab is bring financed 50% by Red Deer College, and 50% from the federal government’s Post-Secondary Strategic Initiative Fund. Space will include a lab Clark Builders and learning space for training. Gen III Oil Corp has signed a 20 year lease with Parkland Fuel to begin construction on an inactive refinery near Bowden. The upgrader will refine used oil, and have an output of 2,800 barrels per day. Project would employ 445 people during construction, and 25 http://www.geniiioil.com/projects/bowden/ people once the project is up and operational. moderization of elevators Construction of a interchange in Red Deer to improve the flow of traffic at Highway 2 and Gaetz ave. This is to be completed Flatiron Constructors Canada Ltd. before the 2019 Canadian Winter Games. http://www.reddeer.ca/city- government/plans-and- projects/construction-and-engineering- M Pidherney"s Trucking projects/ The project features 26 kilometres of wastewater forcemain pipeline, and has been broken down into six contracts which will be constructed concurrently. The first includes the 1.3 kilometre stretch of pipeline from the City of Red Deer Wastewater Treatment Plant to the odour management facility. The others include the odour management facility, seven-kilometres of pipeline from the odour management facility to Blackfalds, lift stations in both Lacombe and Blackfalds and 17 kilometres of http://www.nrdrwwsc.ca/ pipeline from Blackfalds to Lacombe. The project features 26 kilometres of wastewater forcemain pipeline, and has been broken down into six contracts which will be constructed concurrently. The first includes the 1.3 kilometre stretch of pipeline from the City of Red Deer Wastewater Treatment Plant to the odour management facility. The others include the odour management facility, seven-kilometres of pipeline from the odour management facility to Blackfalds, lift stations in both Lacombe and Blackfalds and 17 kilometres of http://www.nrdrwwsc.ca/ pipeline from Blackfalds to Lacombe. Paterson Grain Terminal is proposed to be a 207 acres and process up to 35,000 metric tonnes of grain. Construction of a new 65 unit replace lodge. This project will provide flexible classroom spaces and living laboratories that support students as they apply theory to practice in a dynamic and integrated learning environment. The sports facilities currently proposed (double performance gym, two ice surfaces, squash courts, classrooms/labs) will support current and new programming in Kinesiology, Health Sciences, https://rdc.ab.ca/sites/default/files/uploads and Education and will be used during the 2019 Canada Winter Clark Builders/Scott Builders /documents/1938/rdc-cip-2014.pdf Games. http://www.reddeer.ca/city- services/roads/road-rehabilitation/ This project is a four stage upgrade of the Red Deer area transmission system involving stage 1 substation upgrades in the Red Deer area, stage 2 rebuild in Red Deer, stage 3 new substations and lines in Ponoka, Innisfail, and Didsbury areas, http://www.altalink.ca/projects/view/138/r and stage 4 removal of existing lines from Wetaskiwin to ed-deer-area-transmission-development Lacombe and Red Deer to Innisfail. http://www.reddeer.ca/media/reddeerca/ci A replacement of the Red Deer Arena with seating for up to ty-government/budget-and-annual-financial- 1,588, the arena is expected to be completed by 2018 in time PCL Construction reports/Red-Deer-Arena-Replacement.pdf for the Canada Winter Games in 2019. http://www.rdcounty.ca/162/Roads Construction and expansion of the Red Deer courthouse, which is currently at full capacity. Modernized courthouse will feature 12 courtrooms, with room built for a future expansion to 16 courtrooms. Asphalt concrete pavement work S of Jct Hwy 42 to Jct Hwy 595, Jct Hwy 21 to Hamlet of Lousana, Jct Hwy 21 to village of SandStar Construction Ltd. delburne Regional wastewater system phase 5 Sylvan Lake to County of Red Deer. Project will eliminate the discharge of municipal http://www.sylvanlakeregional.com/ wastewater upstream of the plant. Construction of a new grade 6-9 school..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    9 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us