Government of West Bengal Water Resources Development Directorate Office of the SuperintendinEngineer(A-M), Kolkata (Agri-Mechanical) Resource Circle Mayukh Bhawan,1st Floor, Salt lake, Kolkata-700091 Ph.No. 033-23371911/23340977/23213865, e-mail [email protected] Memo. No.-384 Date: 15.03.2018 NOTICE INVITING e- TENDER By The Superintending Engineer (A-M), Kolkata (A-M) Res. Circle, Kolkata. Tender Reference No: WBWRDD/SE (AM)/Res Circle /eNIT- 21/2017-18 1.Invitation : Separate Item wise Rate tenders are invited by the Superintending Engineer (A-M) , Kolkata(A-M) Resource Circle on behalf of the Governor of West Bengal through e- Tendering from Eligible, Bonafied and Resourceful Agencies having sound technical and financial capability as well as fulfilling the stipulated qualifying criteria for the works in RIDF-XXIII Programme under Water Resources Investigation and Development Department (WRIDD) and North Bengal Development Department (NBDD) in different Districts as mentioned below. DESCRIPTION FOR THE WORK:- DESIGN, SUPPLY INSTALLATION OF SOLAR IRRIGATION PUMPING SYSTEM USING DUAL-AXIS MANUAL TRACKING WITH SEASONAL TILTING SYSTEM INCLUDING SUPPLY OF ALL MATERIALS FOR COMMISIONING OF LDTW/STW/PDW/ SPSIS,SCHEME and COMPREHENSIVE MAINTENANCE FOR 5 YEARS. THE SYSTEM MUST RUN ON - BOTH ON GRID AND OFF GRID Details of works in different locations are shown below: Gr Appr Time of Token Minimum Eligibility Criteria No Sl No Description of Items ox comple Earne (Credential, Turn over) . Qty tion st in (in Mone days) y set 1. 1.1 Design, Supply , installation and commissioning of Solar PV system with dual axis Manual Tracking system for water pumping system of specified discharge as per tech. spec. including supply of submersible pump sets of 5HP , transportation of misc materials form 60 days Resources subdivisional stores for LDTW from structures for different locations in the different district including providing issue of work training to water users association and order. Comprehensive maintenance for five (5) years as per scope of works Annexure-VI and name & particular of schemes as per Annexure-A 1.11 - Do- For Ragunj Block under U 24 4Laks 80 L for single Credential, or 60 Lakhs for 2 nos Dinajpur District credential, or Running works-Rs-160 Lakhs & Average Annual Turn over for three year of last Five years-250 Lakhs 1.12 - Do- For Goalpokhor-I-1 Block under 18 3 60 L for single Credential, or 45 Lakhs for 2 nos U Dinajpur District Lakhs credential, or Running works-Rs-120 Lakhs & Average Annual Turn over for three year of last Five years-180 Lakhs 1.13 - Do- For Goalpokhor-I-2 Block under 18 3 60 L for single Credential, or 45 Lakhs for 2 nos U Dinajpur District Lakhs credential, or Running works-Rs-120 Lakhs & Average Annual Turn over for three year of last Five years-180 Lakhs 1.14 - Do- For Karandighi Block under U 10 1.5 35 L for single Credential, or 25 Lakhs for 2 nos Dinajpur District Lakhs credential, or Running works-Rs-70 Lakhs & Average Annual Turn over for three year of last Five years-100 Lakhs 1.15 - Do- For Dakshin Dinajpur-1 District 23 4 80 L for single Credential, or 60 Lakhs for 2 nos Lakhs credential, or Running works-Rs-160 Lakhs & Average Annual Turn over for three year of last Five years-250 Lakhs 1.16 - Do- For Dakshin Dinajpur-1 District 20 3 70 L for single Credential, or 50 Lakhs for 2 nos Lakhs credential, or Running works-Rs-140 Lakhs & Average Annual Turn over for three year of last Five years-220 Lakhs 1.17 - Do- For Gazole Block under Malda 24 4 80 L for single Credential, or 60 Lakhs for 2 nos District Lakhs credential, or Running works-Rs-160 Lakhs & Average Annual Turn over for three year of last Five years-250 Lakhs 1.18 - Do- For Harishchandrapur Block 24 5 80 L for single Credential, or 60 Lakhs for 2 nos under Malda District lakhs credential, or Running works-Rs-160 Lakhs & Average Annual Turn over for three year of last Five years-250 Lakhs 1.19 - Do- For Chanchal-I Block under Malda 14 2.5 50 L for single Credential, or 40Lakhs for 2 District Lakhs nos credential, or Running works-Rs-100 Lakhs & Average Annual Turn over for three year of last Five years-160 Lakhs 1.20 - Do- For Chanchal-II Block under 20 3.5 70 L for single Credential, or 50 Lakhs for 2 nos Malda District lakhs credential, or Running works-Rs-140 Lakhs & Average Annual Turn over for three year of last Five years-220 Lakhs 1.21 - Do- For Ratua Block under Malda 18 3 65 L for single Credential, or 45 Lakhs for 2 nos District lakhs credential, or Running works-Rs-130 Lakhs & Average Annual Turn over for three year of last Five years-200 Lakhs 2.1 Design, Supply , installation and commissioning of Solar PV system with dual axis Manual Tracking system for water pumping system of specified discharge as per tech. spec. including supply of surface pump sets of 3HP, transportation of miscellaneous materials form Resources sub divisional stores for STW structures for different locations in different district including providing training to water users association and Comprehensive maintenance for five (5) years as per Annexure-VII and name & particular of schemes as per Annexure-B 2 2.11 - Do- For Tufanganj –I-1 Block under 47 5.4 100 L for single Credential, or 80 Lakhs for 2 nos Coochbehar District Lakhs credential, or Running works-Rs-215 Lakhs & Average Annual Turn over for three year of last Five years-330 Lakhs 2.12 - Do- For Tufanganj –I-2 Block under 42 4.5 90 L for single Credential, or 70 Lakhs for 2 nos Coochbehar District Lakhs credential, or Running works-Rs-235 Lakhs & Average Annual Turn over for three year of last Five years-300 Lakhs 2.13 - Do- For Coochbehar–I-1 Block under 24 2.5 50 L for single Credential, or 40Lakhs for 2 nos Coochbehar District lakhs credential, or Running works-Rs-100 Lakhs & 60 days Average Annual Turn over for three year of last from Five years-160 Lakhs 2.14 - Do- For Kharibari-1 under Darjeeling 36 the 4 80 L for single Credential, or 60 Lakhs for 2 nos District issue of Lakhs credential, or Running works-Rs-160 Lakhs & work Average Annual Turn over for three year of last order Five years-250 Lakhs 2.15 - Do- For Kharibari-2 under Darjeeling 42 60 days 4.5 95 L for single Credential, or 70 Lakhs for 2 nos District from Lakhs credential, or Running works-Rs-190 Lakhs & the Average Annual Turn over for three year of last issue of Five years-290 Lakhs 2.16 - Do- For Phansidewa-1 under 8 work 0.9 18 L for single Credential, or 13Lakhs for 2 nos Darjeeling District order Lakhs credential, or Running works-Rs-35 Lakhs & Average Annual Turn over for three year of last Five years-55 Lakhs 2.17 - Do- For Jalpaiguri Sadar-I under 17 1.75 35 L for single Credential, or 25 Lakhs for 2 nos Jalpaiguri District Lakhs credential, or Running works-Rs-70 Lakhs & Average Annual Turn over for three year of last Five years-100 Lakhs 3 3.1 Design, Supply , installation and 60 days commissioning of Solar PV system with from dual axis Manual Tracking system for the water pumping system of specified issue of discharge as per tech. spec. including work supply of surface pump sets of 5HP, order transportation of misc materials form 60 days Resources subdivisional stores for PDW from structures for different locations in the Alipurduar district including providing issue of work training to water users association and order Comprehensive maintenance for five (5) years as per Annexure-IX and name & particular of schemes as per Annexure-C 3.11 -Do- for Kumargram-1 Block Under 24 6 80 L for single Credential, or 60 Lakhs for 2 nos Alipurduar District Lakhs credential, or Running works-Rs-180 Lakhs & Average Annual Turn over for three year of last Five years-250 Lakhs 3.12 -Do- for Kumargram-2 Block Under 24 6 80 L for single Credential, or 60 Lakhs for 2 nos Alipurduar District Lakhs credential, or Running works-Rs-180 Lakhs & Average Annual Turn over for three year of last Five years-250 Lakhs 3.13 -Do- for Kumargram-3 Block Under 12 1.75 35 L for single Credential, or 25 Lakhs for 2 nos Alipurduar District Lakhs credential, or Running works-Rs-70 Lakhs & Average Annual Turn over for three year of last Five years-100 Lakhs 3.14 -Do- for Kumargram-4 Block Under 12 1.75 35 L for single Credential, or 25 Lakhs for 2 nos Alipurduar District Lakhs credential, or Running works-Rs-70 Lakhs & Average Annual Turn over for three year of last Five years-100 Lakhs 3.15 -Do- for Kumargram-5 Block Under 12 1.75 35 L for single Credential, or 25 Lakhs for 2 nos Alipurduar District Lakhs credential, or Running works-Rs-70 Lakhs & Average Annual Turn over for three year of last Five years-100 Lakhs 3.16 -Do- for Kumargram-6 Block Under 12 1.75 35 L for single Credential, or 25 Lakhs for 2 nos Alipurduar District Lakhs credential, or Running works-Rs-70 Lakhs & Average Annual Turn over for three year of last Five years-100 Lakhs 3.17 -Do- for Kumargram-7 Block Under 12 1.75 35 L for single Credential, or 25 Lakhs for 2 nos Alipurduar District Lakhs credential, or Running works-Rs-70 Lakhs & Average Annual Turn over for three year of last Five years-100 Lakhs 3.18 -Do- for Kumargram-8 Block Under 12 1.75 35 L for single Credential, or 25 Lakhs for 2 nos Alipurduar District Lakhs credential, or Running works-Rs-70 Lakhs & Average Annual Turn over for three year of last Five years-100 Lakhs 3.19 -Do- for Kalchini Block Under Alipurduar 12 1.75 35 L for single Credential, or 25 Lakhs for 2 nos District lakhs credential, or Running works-Rs-70 Lakhs & Average Annual Turn over for three year of last Five years-100 Lakhs 3.20 -Do- for Madari Block Under Alipurduar 12 1.75 35 L for single Credential, or 25 Lakhs for 2 nos District Lakhs credential, or Running works-Rs-70 Lakhs & Average Annual Turn over for three year of last Five years-100 Lakhs 4 4.1 -Design , supply , transport , installation, 60 days testing and commissioning of sprinkler from irrigation to 8 Ha as per tech.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages64 Page
-
File Size-