CFD 150Th Anniversary Comes Together President's

CFD 150Th Anniversary Comes Together President's

Fall/Winter 2013 SAVING HISTORY, SAVING LIVES! Volume 19, Number 3/4 President’s Log By Roy P. Ziganti, Jr. Greetings members of the Western Reserve Fire Museum; after a fi nally starting to take shape and resemble the place that was envi- job change it became diffi cult for Brian Spring to continue on in his sioned 10 years ago when we were approached by a group of fi re buff s role as Board President. I would like to thank Brian for his tenure as and retired Cleveland Firemen. a member of the WRFM Executive Committee. Brian served as our Treasurer as well as Board President for about two years and served ODOT has completed the hardscape along the surroundings of with distinction, again many thanks Brian. the Museum. Th e ornamental lighting looks great, from the corner of East 9th and Carnegie we look like a shining star with the recent For those of you who do not know me, I have been a proud mem- installation of our marquee Fire Museum sign. Th e place inside and ber of the Cleveland Division of Fire for nearly 33 years. I was ap- out is really starting to come together. proached by Patrick Kelly, Chief of the Division of Fire, about nine years ago when he asked me to go over to the Museum and lend a I would like take a moment to make this pledge to all Cleve- hand. A year later I became a Board member, and since have served land Firemen and every WRFM member who has contributed the Museum in many diff erent capacities. their hard-earned funds. While I am serving as President I will ensure that the Board does everything possible to make this a My tenure as President began with a soft opening which could Museum one we can all be proud of and the best Museum of its have never been pulled off without the help of many volunteers. kind. We have much work to do and I am going to continue to rely Many days of painting, carpentry, cleaning, and exhibit installa- on you to help. Please contact me if you have any special skills that tion all made it possible. Th e FTA class of 2013 showed up big time could be of assistance. I will be reaching out to some of you soon. swinging hammers, drilling holes, and just getting plain fi lthy. Cleveland Fire retirees also showed up ensuring that we had the If anyone has any questions in regard to the Museum or wants to get necessities of light, water, and heat in our facility. Th e Museum is involved please do not hesitate to contact me at [email protected]. CFD 150th Anniversary Comes Together Fire Museum Soft Opening INSIDE THIS ISSUE Museum Annual Meeting ...............3 Flea Market .....................................3 New Canopy ...................................3 Museum Th anks Donors .................4 A Tragedy ........................................5 Channel 3 Live from the Roof ........5 Sesquicentennial .......................... 6 - 8 John Scanlon Photo Who Built It? ..................................9 StuStu WarnerWarner describesdescribes operationoperation ofof thethe handhand engineengine to visitors.visitors Behind the Scenes ...........................9 Before Station No. 28 ....................10 By John Zangerle this fall. Of all these events, the special ex- Chief Patrick Kelly .........................11 Planning started almost a year ago for hibit was clearly the most diffi cult to orches- Calendar of Events .........................11 special events celebrating the 150th anni- trate. A huge amount of work had to be done Th is newsletter is dedicated to informing the versary of the Cleveland Division of Fire. on the Museum building in a very short pe- members of the Western Reserve Fire Museum and Along the way, we held a kick-off event at riod of time. New interior steel fi re doors Education Center of its activities and events. Cleveland City Hall in December, 2012, had to be installed. Drywall work needed Published by Th e Western Reserve Fire Museum and an event at the Indians Yankees game to be completed. Details like mirrors for the and Education Center, 310 Carnegie Ave., Cleveland, Ohio 44115-2816 this past April. We also had a special sec- new restrooms and overhead lights had to be Phone: (216) 664-6312 tion of apparatus in the Cleveland Kamm’s installed. While all the work was going on www.wrfmc.com Corners Fourth of July parade. Th e grand we were faced with the many obstacles cre- fi nale was a special exhibit at the Museum ated by the ODOT construction project on (Continued on page 2, see CFD 150th) Page 1 CFD 150th (Continued from page 1) the new Innerbelt Bridge that made it Helping to make this possible was very diffi cult to access the building. a grant from Cuyahoga Arts and CultureC that provided funds toward Th e other component, designing thet cost of preparing the exhibits. We the exhibit, was equally challenging. alsoa want to thank members of CFD A design committee of Paul Nelson, StationS No. 43 who volunteered to Bedford Heights Chief Ken Led- buildb the display stands for the story ford and John Zangerle had a num- boards.b ber of working meetings to lay out a general plan. Paul Nelson did the Th e fi rst offi cial visitors to the ex- bulk of the work, creating the story hibith were the Cleveland Firefi ght- boards and selecting the photos used erse who came through the Museum for the exhibit. Paul was assisted by duringd their annual United Way/ Joan Oliver and her husband, John payrollp deduction meetings in Oc- Bob Gahr Photo Oliver, of X2Media who prepared tober. Most were very impressed by the graphics and digital fi nish work prior to fort and it is impossible to name all of those the display. In addition, IAFF Local 93 held sending to Vista Color Imaging for printing. who contributed in one form or another. its annual Unity Day event at the Museum We do want to thank the Western Reserve and got to see the displays. Volunteers staff ed All the hard work and planning fi nally Historical Society’s Crawford collection for the Museum on weekends during October came together October 12. For the fi rst time the loan of their 1913 White Hose Truck and November and visitors came by to see we had a professional exhibit in the Museum! that was CFD’s second piece of motor- our exhibit. Th anks to our volunteers who From the photographs in the Bugle you can ized fi re apparatus. Th anks also to Live gave up their weekends to be at the Museum. see that the exhibit included fi ve pieces of fi re Oak Fire Museum in Amherst, Ohio for apparatus with story boards for each, arti- the loan of their beautifully restored Live Unfortunately, all good things must come facts on display, and a reconstruction of the Oak Button hand pumper that was origi- to an end and some of the apparatus in the fi re station’s original watch desk. Th e Mu- nally purchased by Cleveland in 1847 and exhibit will be removed before the annual seum was also able to install sliding fi re poles used in the volunteer fi re department days. meeting so more work can be done on the in their original locations in the apparatus Also on display was the 1873 Silsby steamer building. Th e process of designing, prepar- bay. Th e walls were covered with more story and hose reel that is on permanent loan to ing, and running this exhibit was an invalu- boards telling the story of the department the Museum from the Cambridge, Ohio Fire able learning experience for the Museum. and some of Cleveland’s famous fi res. Steven Department. Th e steamer is nearly identical We are now starting design work for the Nedrich provided some excellent Cleveland to Cleveland steamers used in the same era. exhibits in the education wing. Overall, fi re videos playing on a TV during the exhibit. John Zangerle brought his 1925 Seagrave the exhibit was a fi tting tribute to 150 years pumper, formerly Cleveland Engine 16 and of a paid Cleveland Fire Department. We Th is whole project was truly a group ef- later Cleveland Engine 32 for the display. hope you were able to stop by and see it. Bob Gahr Photo Collage Page 2 New Canopy Th anks to a generous donation from Th e Reinberger Foundation, the new canopy and sign for the new entrance has been fabricated and lifted into place. Some fi nishing touches are yet to be done but the LED back-lit sign is clearly visible from the Carnegie-Ontario intersec- tion. Th is is the fi rst step in completing the new entry hall for the Museum that was the old day room for Station No. 28. Design work and cost estimates have been prepared for the new double doors, the family bathroom and fi nishing of the room that will complete the entry hall project. Also we need to change out the second fl oor windows and restore the wrought iron decorative balcony on the eastern façade. We are currently seeking funding to complete this portion of the project. Photo by Paul Nelson Photo by Next for NonProfits Photo by Paul Nelson The main entrance begins to take shape. Flea Market, March 1, 2014 Be sure to save the date and plan to attend our 30th Annual Firematic Flea Market, Saturday, March 1, 2014 at the Fire Training Academy, 3101 Lakeside Ave., Cleveland. Th e Flea Market will run from 8:00 AM - 1:00 PM.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    12 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us