Wodgina Lithium Project Pipeline Licence PL116

Wodgina Lithium Project Pipeline Licence PL116

Wodgina Lithium Project Pipeline Licence PL116 CONSTRUCTION ENVIRONMENT PLAN – PUBLIC DISCLOSURE DOCUMENT Proponent: Wodgina Lithium Pty Ltd Address: 1 Sleat Road, Applecross, WA 6153 Postal Address: Locked Bag 3, Canning Bridge LPO APPLECROSS WA 6153 Corporate contact: David Temple-Smith Phone: +61 8 9329 3729 Email: [email protected] 21 FEBUARY 2019 Revision History Revision Issued Date Authorised By Purpose / Changes Number A 25 May 2018 G Barrett First draft for internal review. Release to regulator; various minor changes / corrections 0 12 June 2018 T Berryman from internal review. Various changes throughout to address responses to Rev 1 3 September 2018 D Temple-Smith 0 from DMIRS (email from Amanda Cortez dated 6 July 2017). Addresses DMIRS Notice of Decision (EARS-EP-74597) and 2 19 October 2018 David Swain accompanying email from Amanda Cortez dated 27 September 2018. 3 14 December 2018 David Swain Amend pipeline trench egress ramp conditions Update CEP to include Appendix 14 – Wodgina 2 Pipeline 4 21 February 2019 David Swain – modification to approved activity Rev 0 TABLE OF CONTENTS 1. DESCRIPTION OF THE ACTIVITY .................................................................................................................. 1 Background, Scope, and Purpose ..................................................................................................... 1 Location ............................................................................................................................................ 2 Built Asset Description ..................................................................................................................... 2 Construction Infrastructure and Resources ..................................................................................... 3 1.4.1. Mobilisation ......................................................................................................................... 3 1.4.2. Construction Right-of-Way .................................................................................................. 3 1.4.3. Ancillary Access and Work Areas ......................................................................................... 4 1.4.4. Fuel Supply, Hazardous Storage, and Servicing ................................................................... 6 1.4.5. Personnel and Accommodation .......................................................................................... 6 1.4.6. Water Supply and Storage ................................................................................................... 7 1.4.7. Borrow and Surplus Earth Material ..................................................................................... 7 1.4.8. Waste Disposal .................................................................................................................... 8 1.4.9. Other Infrastructure ............................................................................................................ 8 Area of Disturbance .......................................................................................................................... 9 Plant and Equipment ........................................................................................................................ 9 Contractors .....................................................................................................................................11 Schedules and Hours of Operation .................................................................................................11 Construction Works ........................................................................................................................12 1.9.1. Overview ............................................................................................................................12 1.9.2. Mobilisation and Site Establishment .................................................................................13 1.9.3. Survey and Set-Out ............................................................................................................13 1.9.4. Clear and Grade .................................................................................................................13 1.9.5. Pipe Stringing and Bending ................................................................................................13 1.9.6. Joint Welding, Testing, and Coating ..................................................................................13 1.9.7. Trenching and Excavation ..................................................................................................14 1.9.8. Lowering-in and Backfill.....................................................................................................14 1.9.9. Special Crossings – Roads ..................................................................................................15 1.9.10. Special Crossings – Watercourses .....................................................................................16 1.9.11. Inlet and Delivery Stations .................................................................................................16 1.9.12. Tie-ins ................................................................................................................................17 1.9.13. Hydrostatic Pipeline Testing ..............................................................................................17 1.9.14. Clean-up and Reinstatement of Work Areas .....................................................................17 1.9.15. Cathodic Protection, Station and Signs .............................................................................18 Pipeline Signage ..............................................................................................................................18 Commissioning .............................................................................................................................. 19 Operations and Maintenance .........................................................................................................19 Final Decommissioning and Rehabilitation ....................................................................................19 2. DESCRIPTION OF THE ENVIRONMENT ......................................................................................................21 Social, Economic, and Tenure .........................................................................................................21 Aboriginal Heritage .........................................................................................................................22 Climate ............................................................................................................................................22 Biogeographic Region .....................................................................................................................23 Land Systems and Soils ...................................................................................................................24 Surface Water .................................................................................................................................24 Groundwater ..................................................................................................................................25 Vegetation and Flora ......................................................................................................................25 2.8.1. W2P northern envelope ....................................................................................................26 2.8.2. W2P Southern envelope ....................................................................................................27 2.8.3. Introduced Flora ................................................................................................................28 Habitat and Fauna ..........................................................................................................................28 2.9.1. Fauna Species of Conservation Significance ......................................................................29 3. ENVIRONMENTAL RISK ASSESSMENT AND MANAGEMENT .....................................................................30 Risk Assessment Methodology .......................................................................................................30 Identification of Sources of Risks and Their Impacts......................................................................30 Risk Classification and Reporting Requirements ............................................................................31 Environmental Management Strategies ........................................................................................31 3.4.1. Overview ............................................................................................................................31 3.4.2. Heritage .............................................................................................................................31 3.4.3. Vegetation, Flora, and Habitat ..........................................................................................33 3.4.4. Fauna .................................................................................................................................35 3.4.5. Soils and Land Use .............................................................................................................39

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    100 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us