
National Mission for Clean Ganaga Format for Submission of monthly Progress report by states/UTs (Hon’ble NGT in the matter of OA No.673/2018, Date: 06/12/2019) KARNATAKA STATE POLLUTION CONTROL BOARD Name of the River : Asangi Polluted river stretch : Asangi (33 Km) Priority : P- V Status as on : July 2020 Sl.No. Activity to be Timeline Submission of Progress by monitored State/UT-Compliance Status 1. Ensure 100% treatment of 31.03.2020 Action has been initiated by UDD, sewage at least in-situ GoK to train the 35 ULBs on in-situ remediation treatment, viz. phytoremediation and wet-land treatment. commencement of setting 31.03.2020 KUWS&DB: Project proposal for the up of STPs and connecting commencement of setting up of STPs all the drains and other at an estimated cost of ₹1690 crores sources of generation of has been submitted to GoK for sewage to the STPs approval. ₹100 crore provision has must be ensured been made for 2020-21 budget. 2. Timeline for completing all 31.03.2020 KUWS&DB: 24 months from the steps of action plans date of handing over of the required including completion of land from the ULBs for STP setting up STPs and their construction and I&D works. commissioning Chief Secretaries may set 22.01.2020 State level River Rejuvenation up appropriate monitoring Committee (RRC) is mechanism at State level constituted by GoK on Specifying 24/11/2018 under the accountability of nodal authorities Chairmanship of Principal not below the Secretary to Government Secretary level (Ecology and Environment). Chief Secretaries MS, KSPCB; Director, DIC may have an and Director, DMA are the accountable person members of the committee. attached in their 22.01.2020 A monitoring cell is directly office for this purpose. working under the Chief Secretary’s Office, since 18/03/2020. Monitoring at Fortnightly 4th RRC meeting was held on State level must Commencin 11/03/2020 under the take place g Chairmanship of The Principal 21.12.2019 Secretary to Government (Ecology and Environment). Regular meetings will be conducted to review the progress. 6. Progress report may be Progress report for the period up to furnished by the States/UTs July 2020 is as submitted. to Secretary, Ministry of Jal Shakti Member Secretary, CPCB Monthly (preferably 6.1 Progress report maybe before 20th of Three number of draines are comprised of the details every month) identified and monitored regularly. along with completion They are as follows Rabakavi- timelines on: Banahatti at Asanagi, Terdal Nala and Jamakhandi Nala. i. Identification of polluting sources including drains contributing to river pollution and action as per NGT order on in-situ treatment ii. Status of STPs, I&D and The CMC, Rabakavi-Banahatti sewerage networks authorities encloses STP of capacity Details of Existing 9.2 MLD and is under Infrastructure, commissioning process. Gap Analysis, Proposed along with completion timeline iii. Status of CETPs There are 7 number of effluent Details of Existing CETP generation industries have captive and ETP Infrastructure, ETPs and total capacity of the Gap Analysis, captive ETP is 2.75 MLD. There are Proposed along with no CEPT’s. completion timeline, No. of industries and complying status iv. Status of Solid Waste The Solid waste generation 26 TPD Management & Details of at Rabakavi- Banahatti, Teradala & Processing Facilities TSD. Details of Existing Infrastructure, Gap Analysis, Proposed along with completion timeline v. Latest water quality of River water quality belongs to the polluted river, its Class –C, tributaries, drains with flow details and ground water quality in the catchment of polluted river; vi. Preventing dumping of Total collection and treatment of the waste and scientific waste bio-medical waste -18 Kg/Day. management including bio- There are 7 No’s of Hazardous waste medical wastes, plastic generating industries in the polluted wastes and decentralizing river stretch and is monitored. waste processing, including waste generated from hotels, ashrams, etc. vii. Ground water regulation Drilling new bores are restricted in the notified areas and prior permission has to be taken by the authority. Registration of the drilling rigs has been made compulsory. All commercial users of ground water must take the permission/NOC from Govt of Karnataka (GoK). For the industries in the Polluted River Stretches (PRS) that are using the ground water for their industrial purpose, notice has been sent to take permission from the GoK. viii. Adopting good irrigation Awareness programs in micro practices, irrigation to farmers have been carried out regularly by Agriculture Departments of water resources. ix. Protection and Regular works are carried out under management of Flood the directions of Karnataka State Plain Zones (FPZ), Forest Department. x. Rain water harvesting Urban Development Authority is insisting residential Buildings/ Commercial Buildings to adopt Rain Water Harvesting in its approval. xi. Maintaining minimum Karnataka Water Resources environmental flow of river Department is the concern Department and it is maintaining the flow as per the Norms xii. Plantation on both sides of The Deputy Commissioner the river informed the Forest Department Officers to take suitable action for plantation in flood plain zone. xiii. Setting up biodiversity There is no encroachment on flood parks on flood plains by plains in River belt. removing encroachment National Mission for Clean Ganaga Format for Submission of monthly Progress report by states/UTs (Hon’ble NGT in the matter of OA No.673/2018, Date: 06/12/2019) KARNATAKA STATE POLLUTION CONTROL BOARD Name of the River : Bhadhra Polluted river stretch : Bhadravathi to Holehonnur (10Km) Priority : P- IV Status as on : July 2020 Sl.No. Activity to be Timeline Submission of Progress by monitored State/UT-Compliance Status 1. Ensure 100% treatment of 31.03.2020 Action has been initiated by sewage at least in-situ UDD, GoK to train the 35 ULBs remediation on in-situ treatment, viz. phytoremediation and wet-land treatment. commencement of setting 31.03.2020 KUWS&DB: Project proposal for up of STPs and connecting the commencement of setting up all the drains and other of STPs at an estimated cost of sources of generation of ₹1690 crores has been submitted sewage to the STPs to GoK for approval. ₹100 crore must be ensured provision has been made for 2020-21 budget. 2. Timeline for completing all 31.03.2021 KUWS&DB: 24 months from the steps of action plans date of handing over of the including completion of required land from the ULBs for setting up STPs and their STP construction and I&D works. commissioning Chief Secretaries may set 22.01.2020 State level River Rejuvenation up appropriate monitoring Committee (RRC) is mechanism at State level constituted by GoK on Specifying accountability of 24/11/2018 under the nodal authorities Chairmanship of Principal not below the Secretary to Government Secretary level (Ecology and Environment). Chief Secretaries MS, KSPCB; Director, DIC may have an and Director, DMA are the accountable person attached in their members of the committee. office for this A monitoring cell is directly purpose. 22.01.2020 working under the Chief Secretary’s Office, since 18/03/2020. Monitoring at Fortnightly 4th RRC meeting was held on State level must Commencin 11/03/2020 under the take place Chairmanship of The Principal g Secretary to Government 21.12.2019 (Ecology and Environment). Regular meetings will be conducted to review the progress. 6. Progress report may be Monthly Progress report for the period up furnished by the States/UTs (preferably to July 2020 is as submitted. to before 20th of Secretary, Ministry every month) of Jal Shakti Member Secretary, CPCB 6.1 Progress report maybe Six number of drains are identified. comprised of the details along with completion timelines on: i. Identification of polluting sources including drains contributing to river pollution and action as per NGT order on in-situ treatment ii. Status of STPs, I&D and Existing STP is of the capacity 5.83 sewerage networks MLD, 1 more STP is proposed. SBR Details of Existing Technology at Ujjanipura is under Infrastructure, construction. Applied for one more Gap Analysis, Proposed CEF for STP of capacity 7.2 along with completion MLD,WSP Technology timeline constructions is completed. iii. Status of CETPs 3 number of effluent generation Details of Existing CETP industries identified, the total and ETP Infrastructure, capacity ETPs is 87400 KLD Bhadra Gap Analysis, pack aids is recycling waste water Proposed along with and complying. completion timeline, No. of industries and complying status iv. Status of Solid Waste Total Solid Waste Generation Management & Details of from CMC Bhadravathi is 53.8 Processing Facilities TPD. Details of Existing The CMC Bhadravathi is Infrastructure, Collecting Solid waste from door Gap Analysis, Proposed to door. The CMC has reported along with completion timeline that they have carried out segregation in all 35 wards. The wet waste is composted in the existing solid waste disposal site, the dry recyclable waste are segregated and sent to recyclers. v. Latest water quality of River water quality belongs to Class: polluted river, its D. tributaries, drains with flow Bore-well water quality is confirming details and ground water to the standards. quality in the catchment of polluted river; vi. Preventing dumping of The BMW generated from Health waste and scientific waste Care Establishment are disposed to management including bio- CBMWTF for further treatment. The medical wastes, plastic Local Bodies are carrying out regular wastes and decentralizing Plastic raids in Bhadravathi City. The waste processing, CMC, Bhadravathi has started including waste campaign for Pipe Composting and generated from hotels, few houses have started the Pipe ashrams, etc. Composting. vii. Ground water regulation Drilling new bores are restricted in the notified areas and prior permission has to be taken by the authority.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages122 Page
-
File Size-