Rajbandh Stone Mining Applicant: Shri Purnendu Chandra Pandey

Rajbandh Stone Mining Applicant: Shri Purnendu Chandra Pandey

PROJECT: RAJBANDH STONE MINING APPLICANT: SHRI PURNENDU CHANDRA PANDEY 0 PROJECT: RAJBANDH STONE MINING APPLICANT: SHRI PURNENDU CHANDRA PANDEY APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information S.No. Item Details 1. Name of the project/s Rajbandh Stone Mine of Shri Purnendu Chandra Pandey 2. S. No. in the schedule 1(a)Mining of mineral 3. Proposed capacity /area /length The Mining Lease area of the proposed mine is 1.21 ha /tonnage to be handled/command and the proposed capacity of the mine for Stone area/lease area/number of wells to extraction will be 27,720 TPA be drilled 4 New/Expansion/Modernization Existing mine but fresh application for environmental clearance 5. Existing Capacity/Area etc. 1.21 ha 6. Category of Project i.e. ‘A’ or ‘B’ ‘A’ 7. Does it attract the general Yes, Interstate boundary of Jharkhand & West condition? If yes, please specify. Bengal (about 3 km South) 8. Does it attract the specific No condition? If yes, please specify. 9. Location Latitude : 24°35'17.45"N Longitude : 87°50'13.55"E Plot/Survey/Khasra No. Survey No. 111, Plot no. 961, 970, 586, 587, 588 Village Rajbandh Thana Pakur District Pakur State Jharkhand 10. Nearest railway station/airport Nagarnabi railway station nearly 3.5 Km in East (Aerial) along with distance in kms. 11. Nearest Town, city, District Nearest Town- Pakur (about 5 km (Aerial) in North Headquarters along with distance in direction) 1 PROJECT: RAJBANDH STONE MINING APPLICANT: SHRI PURNENDU CHANDRA PANDEY kms. District Headquarter- Pakur (about 5 km (Aerial) in North direction) 12. Village Panchayats, Zilla Parishad, Tehsil - Pakur Municipal Corporation, Local body District - Pakur, (complete postal addresses with Jharkhand telephone nos. to be given) 13. Name of applicant Shri Punendru Chandra Pandey 14. Registered Address Shri Punendru Chandra Pandey Choti Rajbari Pakur Jharkhand 15. Address for correspondence Name Shri Punendru Chandra Pandey Designation (Owner/Partner/CEO) Proprietor Address Shri Punendru Chandra Pandey Choti Rajbari Pakur Jharkhand Pin Code E-mail Telephone No. Fax No. - 16. Details of Alternative Sites The mineral is site specific & the lessee has granted examined, if any. Location of these mining lease to mine stone for the specified lease area. sites should be shown on a topo Thus no alternatives site is proposed. sheet 17. Interlinked Projects There is no interlinked project 18. Whether separate application of NA interlinked project has been submitted? 19. If yes, date of submission - 20. If no, reason NA 2 PROJECT: RAJBANDH STONE MINING APPLICANT: SHRI PURNENDU CHANDRA PANDEY 21. Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given. (a)The Forest (Conservation) Act, No 1980? (b) The Wildlife (Protection) Act, No 1972? (C) The C.R.Z Notification, 1991? No 22. Whether there is any Government No Order/Policy relevant/relating to the site? 23. Forest land involved (hectares) No forest land involved 24. Whether there is any litigation No litigation pending against the project pending against the project and /or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in Yes The mining will be done by Opencast method. land use, land cover or topography There will be permanent changes in land use, including increase in intensity of land cover and topography. land use (with respect to local land use plan) 3 PROJECT: RAJBANDH STONE MINING APPLICANT: SHRI PURNENDU CHANDRA PANDEY 1.2 Clearance of existing land, Yes The total area is waste land, before mineral vegetation and buildings? extraction the area will be required to be cleared of bushes, if any 1.3 Creation of new land uses? Yes The mining activity will result in pits, therefore land use of ML area will be changed. The barrier zone will be planted up to extent of soil availability and mined out area will be used as water reservoir. 1.4 Pre-construction investigations No No borehole or soil testing was done before e.g. bore houses, soil testing? commencement of mining operation. 1.5 Construction works? No No construction work involved 1.6 Demolition works? No No demolition work involved 1.7 Temporary sites used for No Local labour will be employed who will go construction works or housing of back to their home after day work hence no construction workers? temporary sites for mining workers will be constructed. 1.8 Above ground buildings, Yes The void formed by excavation of mineral structures or earthworks including will be used as the water reservoir. linear structures, cut and fill or excavations 1.9 Underground works including No This is an opencast mining project, no mining or tunneling? Underground works including mining or tunneling involved. 1.10 Reclamation works? Yes When the ore gets exhausted mined out area will be used as water reservoir and plantation will be done. 1.11 Dredging? No No dredging will involved. 1.12 Offshore structures? No No offshore structure will be involved 1.13 Production and manufacturing Yes Stone will be produced by mining operations processes? in the quarry. 1.14 Facilities for storage of goods or Yes Temporary storage may be required in the materials? quarry, before the same is transported to its destination. 4 PROJECT: RAJBANDH STONE MINING APPLICANT: SHRI PURNENDU CHANDRA PANDEY 1.15 Facilities for treatment or disposal No No waste will be generated because this was of solid waste or liquid effluents? already mined out area. 1.16 Facilities for long term housing of No Workers will be hired / employed locally from operational workers? the nearby villages, for the mining activity. Thus no housing facility will be developed near mine site. 1.17 New road, rail or sea traffic No There is no need to construct new road, rail or during construction or operation sea traffic as existing facilities are sufficient during operation of mine site. 1.18 New road, rail, air waterborne or No Existing facilities are sufficient other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No There is no closure or diversion of existing transport routes or infrastructure routes or infrastructure for the proposed leading to changes in traffic project. movements? 1.20 New or diverted transmission No There are no new or diverted transmission lines or pipelines? lines or pipelines in the project site. 1.21 Impoundment, damming, No As ultimate depth of mining will be much culverting, realignment or other higher than the ground water table, it will not changes to the hydrology of cause any change to the hydrology of watercourses or aquifers? watercourses or aquifers. 1.22 Stream crossings? No There is no stream crossing in the mine lease area. 1.23 Abstraction or transfers of water Yes Total water requirement is about 0.350 KLD= from ground or surface waters? 0.150 KLD (Drinking & Domestic Uses) + 0.2 KLD (Dust Suppression) this water will be supplied from the nearby village. 1.24 Changes in water bodies or the No The extraction of stone will lead to formation land surface affecting drainage or of pit, which will hold rain water and hence run-off? will have positive impact on environment. 1.25 Transport of personnel or No There is no Transport of personnel or materials for construction, materials for construction, operation or 5 PROJECT: RAJBANDH STONE MINING APPLICANT: SHRI PURNENDU CHANDRA PANDEY operation or decommissioning? decommissioning in the mine lease area. 1.26 Long-term dismantling or Yes During mining operations, the mined out area decommissioning or restoration would be reclaimed as water reservoir, and it works? will be properly fenced off from all entries as per statute. 1.27 Ongoing activity during Yes The extraction of stone will lead to formation decommissioning which could of pit, which will hold rain water and hence have an impact on the will have positive impact on environment. environment? 1.28 Influx of people to an area in No Mostly local people will be deployed to carry either temporarily or out stone extraction. So no influx of people permanently? will be seen. 1.29 Introduction of alien species? No There would be no introduction of any alien species since local species would be preferred for the plantation. 1.30 Loss of native species or genetic No There will not be any loss of native species or diversity? genetic diversity as there is no vegetation or forest cover within the ML area. 1.31 Any other actions? No No other actions would be involved for the excavation of the mineral. 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S.No. Information/checklist Yes/No Details thereof (with approximate quantities confirmation /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No There is no Agriculture land in the mine lease agricultural land (ha) area. 2.2 Water (expected source & Yes Total water requirement is about 0.350 KLD= competing users) unit: KLD 0.150 KLD (Drinking & Domestic Uses) + 0.2 KLD (Dust Suppression) this water will be supplied from the nearby village.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    27 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us