This Document Is Made Available Electronically by the Minnesota Legislative Reference Library As Part of an Ongoing Digital Archiving Project

This Document Is Made Available Electronically by the Minnesota Legislative Reference Library As Part of an Ongoing Digital Archiving Project

This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 2016 Local Government Preliminary Capital Budget Requests $ in Thousands 2016 2018 2020 Request Request Request Total Request Page Entity Project Title Priority Amount Amount Amount Amount 1 Appleton Township Projects Summary 1,000 0 0 1,000 2 100TH ST SW Road Upgrade 1 1,000 0 0 1,000 6 Appleton, City of Projects Summary 3,250 0 0 3,250 7 Pioneer Public TV 1 3,250 0 0 3,250 13 Arrowhead Regional Projects Summary 2,853 0 0 2,853 Corrections 14 NERCC Vocational Programming 1 2,853 0 0 2,853 Improvements 18 Association of Metro Projects Summary 7,000 0 0 7,000 Municipalities 19 Association of Metropolitan Municipalities 1 7,000 0 0 7,000 Inflow-Infilttration Capital Bonding Request 23 Aurora, City of Projects Summary 4,000 12,000 0 16,000 24 East Mesabi Joint Water System 1 4,000 12,000 0 16,000 28 Baxter, City of Projects Summary 4,745 0 0 4,745 29 Cypress Drive Extension Project 1 4,745 0 0 4,745 34 Bemidji, City of Projects Summary 4,200 0 0 4,200 35 Regional Dental Facility; Bemidji 1 3,500 0 0 3,500 41 Bemidji Carnegie Library Rehabilitation 2 700 0 0 700 46 Benton County Projects Summary 6,000 0 0 6,000 47 County State Aid Highway (CSAH) 3 1 6,000 0 0 6,000 Reconstruction 51 Blaine, City of Projects Summary 3,246 0 0 3,246 52 Reconstruction of 105th Avenue 1 3,246 0 0 3,246 56 Cambridge, City of Projects Summary 17,000 0 0 17,000 57 State Trunk Highway 95 Improvement 1 15,000 0 0 15,000 62 East Central Regional Library Headquarters 2 2,000 0 0 2,000 and Cambridge Public Library 66 Central Iron Range Sanitary Projects Summary 6,950 0 0 6,950 Sewer District 67 CIRSSD Mercury Treatment 1 2,250 0 0 2,250 71 CIRSSD Inflow/Infiltration Reduction 2 4,700 0 0 4,700 75 Chatfield Economic Projects Summary 7,985 0 0 7,985 Development Authority 76 Chatfield Center for the Arts Phase II 1 7,985 0 0 7,985 81 Chisago County Projects Summary 13,250 0 0 13,250 82 Chisago County "Next Generation" Jail/Law 1 12,000 0 0 12,000 Enforcement Center 87 Chisago County US Highway 8 - CSAH 26 2 1,250 0 0 1,250 Traffic Control System 91 Chisholm, City of Projects Summary 2,650 0 0 2,650 92 New Municipal Building 1 2,650 0 0 2,650 97 Clay County Projects Summary 22,289 0 0 22,289 98 Clay County Jail 1 13,789 0 0 13,789 103 Clay County Resource Recovery Campus 2 8,500 0 0 8,500 107 Cold Spring, City of Projects Summary 8,300 0 0 8,300 108 2016 Water Infrastructure Improvements 1 8,300 0 0 8,300 113 Dakota County Projects Summary 20,558 0 0 20,558 114 Construction of County State Aid Highway 1 5,500 0 0 5,500 42 Interchange at Trunk Highway 52, Rosemount 118 Powerhouse and Turbine Upgrade, Byllesby 2 6,000 0 0 6,000 Dam 122 Mississippi River Regional Trail, Rosemount 3 2,050 0 0 2,050 East Segment 126 Big Rivers Regional Trail Trailhead 4 787 0 0 787 State of Minnesota Preliminary Capital Budget Requests 07/15/2015 2016 Local Government Preliminary Capital Budget Requests $ in Thousands 2016 2018 2020 Request Request Request Total Request Page Entity Project Title Priority Amount Amount Amount Amount 130 Minnesota River Regional Trail, Eagan 5 2,500 0 0 2,500 Segment 134 East/West Transit Improvements 6 2,000 0 0 2,000 138 Fiber Linking Public Facilities Across Dakota 7 1,721 0 0 1,721 County 142 Dennison, City of Projects Summary 730 0 0 730 143 Lift Station and Sewer Projects 1 730 0 0 730 147 Detroit Lakes, City of Projects Summary 15,000 0 0 15,000 148 Detroit Lakes Public Utilities Waste Water 1 15,000 0 0 15,000 Treatment Plant 153 Duluth International Airport Projects Summary 4,000 0 0 4,000 154 Runway Reconstruction and Realignment 1 4,000 0 0 4,000 Project 159 Ely, City of Projects Summary 23,100 0 0 23,100 160 17th Avenue East/ Vermilion Community 1 1,800 0 0 1,800 College/ Business Park Infrastructure 165 West End Recreation Trailhead 2 1,300 0 0 1,300 Development/ Community Hospital Access Improvements 170 Greater Minnesota Business Development 3 20,000 20,000 20,000 60,000 Public Infrastructure Grant Program 174 Eveleth, City of Projects Summary 447 0 0 447 175 Eveleth Alice/Fayal Location Site 1 447 0 0 447 Redevelopment - Brownfield Cleanup and Infrastructure 180 Golden Valley, City of Projects Summary 2,820 0 0 2,820 181 DeCola Ponds Flood Mitigation 1 2,820 0 0 2,820 185 Grand Rapids, City of Projects Summary 4,275 0 0 4,275 186 Mississippi River Pedestrian Bridge 1 750 0 0 750 190 Mississippi River Amphitheater 2 1,500 0 0 1,500 194 Improvements to the Itasca Recreation 3 2,025 0 0 2,025 Association Civic Center 199 Hallock, City of Projects Summary 700 0 0 700 200 Columbus Ave Sewer 1 700 0 0 700 204 Hennepin County Projects Summary 86,710 0 0 86,710 205 Regional Medical Examiner's Facility 1 34,033 0 0 34,033 209 Hennepin/Ramsey Joint Juvenile Facility 2 18,677 0 0 18,677 213 Interstate 35W/CSAH 3 (Lake Street) 3 25,000 0 0 25,000 Transit/Access Project 218 ArtSpace Hennepin Center for the Arts 5 6,000 0 0 6,000 223 Cedar Cultural Center 6 3,000 0 0 3,000 227 Hennepin County Regional Projects Summary 20,000 79,000 0 99,000 Rail Authority 228 Bottineau LRT (Metro Blue Line Extension) 1 20,000 79,000 0 99,000 232 Hermantown, City of Projects Summary 8,000 0 0 8,000 233 Arrowhead Regional Health and Wellness 1 8,000 0 0 8,000 Center 238 International Falls- Projects Summary 4,495 0 0 4,495 Koochiching County Airport Commissions 239 Airline Terminal Construction Project 1 4,495 0 0 4,495 243 Itasca County Projects Summary 750 0 0 750 244 Popple River Recreation Bridge and Village 1 750 0 0 750 Road Connection 248 Litchfield, City of Projects Summary 5,000 0 0 5,000 249 Phase 2 Power Generation Improvements 1 5,000 0 0 5,000 253 Mankato, City of Projects Summary 14,000 0 0 14,000 State of Minnesota Preliminary Capital Budget Requests 07/15/2015 2016 Local Government Preliminary Capital Budget Requests $ in Thousands 2016 2018 2020 Request Request Request Total Request Page Entity Project Title Priority Amount Amount Amount Amount 254 Regional Water Quality Improvement 1 14,000 0 0 14,000 Strategy 258 McLeod County Projects Summary 2,350 0 0 2,350 259 Morningside (CSAH 15) Corridor Completion 1 2,350 0 0 2,350 264 Minneapolis Park and Projects Summary 24,500 0 0 24,500 Recreation Board 265 Hall's Island Restoration 1 12,000 0 0 12,000 270 26th Avenue River Access: Restoring 2 1,500 0 0 1,500 Connections 274 Minneapolis Trail System Gaps 3 9,000 0 0 9,000 278 Upper Harbor Terminal Site Remediation 4 2,000 0 0 2,000 282 Minneapolis, City of Projects Summary 38,275 0 0 38,275 283 10th Avenue SE Bridge over the Mississippi 1 31,875 0 0 31,875 River Concrete Arch Rehabilitation 287 35W North Storm Tunnels 2 2,000 0 0 2,000 291 Emergency Operations Training Facility 3 2,500 0 0 2,500 (EOTF) Enhancement 296 Pioneers and Soldiers Cemetery Fence 4 1,900 0 0 1,900 Restoration Project 300 Minnesota Valley Regional Projects Summary 22,000 33,000 25,000 80,000 Rail Authority 301 Minnesota Valley Regional Rail Authority 1 22,000 33,000 25,000 80,000 Rail & Bridge Rehabiltiation Request - 2016 306 Montevideo, City of Projects Summary 8,208 0 0 8,208 307 Montevideo Flood Control Project 1 3,000 0 0 3,000 311 Montevideo Veterans Home 2 5,208 0 0 5,208 320 Moorhead, City of Projects Summary 55,810 60,966 0 116,776 321 SE Main Ave/20th St/21st St Railroad Grade 1 42,262 0 0 42,262 Separation 327 11th St Railroad Grade Separation 2 13,548 60,966 0 74,514 333 Moose Lake, City of Projects Summary 800 0 0 800 334 Riverside Center Addition 1 800 0 0 800 339 Morris, City of Projects Summary 7,000 0 0 7,000 340 Morris Water Treatment Facility 1 7,000 0 0 7,000 345 Morrison County Projects Summary 400 0 0 400 346 Soo Line Trail - Bridge Pier Restoration 1 400 0 0 400 Project 350 Newport, City of Projects Summary 5,202 0 0 5,202 351 Newport I&I-Sanitary Service Lining and 1 1,475 0 0 1,475 Manhole Seal 355 Newport I&I-Sanitary Mainline-Service Lining 2 3,512 0 0 3,512 and Manhole Seal 359 Maxwell Avenue Property Acquisition 3 215 0 0 215 363 Otter Tail County Projects Summary 3,571 3,571 0 7,142 364 Perham to Pelican Rapids Recreational Trail 1 3,571 3,571 0 7,142 368 Pipestone, City of Projects Summary 9,700 0 0 9,700 369 New Water Treatment Facility and Well 1 9,700 0 0 9,700 374 Plymouth, City of Projects Summary 2,203 0 0 2,203 375 Plymouth Ice Center Renovations 1 2,203 0 0 2,203 382 Polk County Projects Summary 3,000 0 0 3,000 383 North Country Food Bank 1 3,000 0 0 3,000 389 Ramsey County Projects Summary 22,800 0 0 22,800 390 Interstate Highway 694/Rice Street 1 20,500 0 0 20,500 Interchange 394 Battle Creek Winter Recreation 2 2,000 0 0 2,000 State of Minnesota Preliminary Capital Budget Requests 07/15/2015 2016 Local Government Preliminary Capital Budget Requests $ in Thousands 2016 2018 2020 Request Request Request Total Request Page Entity Project Title Priority Amount Amount Amount Amount 398 Improvements to Ramsey County Landmark 3 300 0 0 300 Center 403 Ramsey County Regional Projects Summary 5,000 0 0 5,000 Rail Authority 404 Riverview Corridor 1 2,000 0 0 2,000 408 Rush Line Corridor 2 2,000 0 0 2,000 412 Union Pacific/BNSF Grade Separation 3 1,000 0 0 1,000 417 Red Wing, City of Projects Summary 33,849 0 0 33,849 418 US TH 61 (Main Street) Reconstruction 1 3,380 0 0 3,380 423 Red Wing River Town Renaissance 2 4,480 0 0 4,480 429 Mississippi Riverwalk Trail and Trailhead 3 8,627 0 0 8,627 434 West Red Wing Public Safety Facility 4 2,600 0 0 2,600 438 Highway Rail

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    620 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us