Caltrans Alternative Procurement Guide -I- Table of Contents

Caltrans Alternative Procurement Guide -I- Table of Contents

CALTRANS ALTERNATIVE PROCUREMENT GUIDE April 2008 Developed By Trauner Consulting Services Inc. San Diego, CA 92108 Table of Contents Table of Contents 1. INTRODUCTION....................................................................................................1 2. PROJECT SELECTION TOOL ..............................................................................7 2.1. INTRODUCTION ....................................................................................................7 2.1.1. Purpose of this Section ......................................................................7 2.1.2. Definitions............................................................................................8 2.1.3. Approach..............................................................................................9 2.1.3.1. Assemble List of Candidate Projects......................................................... 9 2.1.3.2. Convene Selection Committee.................................................................10 2.1.3.3. Evaluate Project Scope/Characteristics ...................................................10 2.1.3.4. Evaluate Project Success Factors ...........................................................10 2.1.3.5. Make Project Delivery Decision ...............................................................10 2.1.4. Conclusions.......................................................................................10 3. PROJECT DELIVERY SYSTEMS........................................................................13 3.1. INTRODUCTION ..................................................................................................13 3.1.1. What is a Project Delivery System? ................................................13 3.1.2. Traditional Delivery System .............................................................13 3.1.3. Alternative Delivery System .............................................................13 3.1.4. Selecting a Delivery System.............................................................13 3.1.5. Relation to Other Department Manuals...........................................14 3.2. DESIGN-SEQUENCING ........................................................................................15 3.2.1. Introduction........................................................................................15 3.2.1.1. Purpose of this Section ............................................................................15 3.2.1.2. What is Design-Sequencing?...................................................................15 3.2.1.3. How is Design-Sequencing Different?......................................................15 3.2.1.4. Terminology .............................................................................................16 3.2.1.5. Why Should We Use Design-Sequencing?..............................................16 3.2.1.6. Statutory Authority ...................................................................................17 3.2.1.7. Overview of the Design-Sequencing Procurement Process.....................18 3.2.2. Project Development.........................................................................19 3.2.2.1. Identify Goals and Objectives / Eligibility Criteria .....................................19 .1 Eligibility Criteria..........................................................................................19 .2 Project Goals and Objectives ......................................................................19 .3 Project Nomination / Selection ....................................................................19 .4 Project Approval Process ............................................................................20 3.2.2.2. Assemble Project Selection Team / Roles & Responsibilities ..................20 Caltrans Alternative Procurement Guide -i- Table of Contents .1 Design .........................................................................................................20 .2 Environmental .............................................................................................20 .3 Right-of-Way ...............................................................................................21 .4 Construction ................................................................................................23 3.2.2.3. Develop Scope of Work ...........................................................................26 3.2.2.4. Define and Allocate Project Risks ............................................................26 3.2.2.5. Preliminary Project Development.............................................................27 .1 Environmental .............................................................................................27 .2 Right Of Way...............................................................................................27 .3 Utilities.........................................................................................................27 .4 Railroads .....................................................................................................27 3.2.2.6. Project Preliminary Design Document Preparation (30% Min).................27 3.2.3. Contract Development / Procurement.............................................29 3.2.3.1. Preparing the Initial Bid Package .............................................................29 .1 General .......................................................................................................29 .2 Project Plans ...............................................................................................30 .3 Specifications ..............................................................................................30 .4 Engineer’s Estimate ....................................................................................33 .5 Addenda......................................................................................................34 3.2.3.2. Project Advertisement..............................................................................34 3.2.3.3. Award of a Design-Sequencing Contract .................................................34 3.2.4. Contract Administration ...................................................................35 3.2.4.1. Composing the Construction Team..........................................................35 .1 The Caltrans Team......................................................................................35 .2 The Design-Sequencing Contractor Team..................................................35 3.2.4.2. Roles of Team Members..........................................................................35 .1 Caltrans’s Responsibility .............................................................................35 .2 Pre-Construction Meeting............................................................................36 3.2.4.3. Assembly and Submittal of Subsequent Sequences................................36 .1 General .......................................................................................................36 .2 Project Plans ...............................................................................................37 .3 Specifications ..............................................................................................37 .4 Engineer’s Estimate ....................................................................................38 .5 Submittal of Subsequent Sequences ..........................................................38 .6 Changes......................................................................................................39 .7 Delays .........................................................................................................39 3.2.4.4. Planning and Charging Practices.............................................................40 3.2.4.5. Coordination with Federal Highway Administration (FHWA) ....................41 3.2.4.6. Final Payment / Contract Closure ............................................................41 3.3. DESIGN-BUILD ..................................................................................................43 -ii- Caltrans Alternative Procurement Guide Table of Contents 3.3.1. Introduction........................................................................................43 3.3.1.1. Purpose of this Section ............................................................................43 3.3.1.2. What is Design-Build?..............................................................................43 3.3.1.3. How is Design-Build Different? ................................................................43 3.3.1.4. Roles and Responsibilities.......................................................................44 3.3.1.5. Terminology .............................................................................................44 3.3.1.6. Benefits of Design-Build...........................................................................46 3.3.1.7. Statutory Authority ...................................................................................47 3.3.1.8. Nomination and Approval.........................................................................48 .1 Nomination Package ...................................................................................48 .2 Approval Process ........................................................................................48 3.3.1.9. Overview of the Design-Build Procurement Process................................48 .1 Project Scoping

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    306 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us