FORM 1 I) Basic Information S.No. Item Details 1 Name of the Project/S

FORM 1 I) Basic Information S.No. Item Details 1 Name of the Project/S

FORM 1 I) Basic information S.No. Item Details 1 Name of the project/s M/s. Shree Anurag Projects Construction of Residential Apartments Project 2 S.No. in the schedule The project is categorized under 'B-2' under item 8(a) of Schedule - Gazette Notification dated 14th September 2006 and subsequent amendments issued by MoEF&CC, New Delhi on 01.12.2009 and 04.04.2011. 3 Proposed capacity /area/ length/ Construction of Residential Apartments project. tonnage to be handled/command Apartments Built-up Area – 46,866.75 Sqm area/lease area/ No of the well to be Parking Area – 10,810.21 Sqm drilled Total Area – 57,676.96 Sqm 4 New/Expansion /Modernization New 5 Existing capacity/Area etc. Not Applicable 6 Category of project A or B Category B ( ‘B2’) 7 Does it attract the general condition? This project does not attract general conditions. If yes please specify 8 Does it attract the specific condition? This project does not attract specific conditions. If yes please specify 9 Location Plot/ survey /Khasra no 369 (P), 371 (P), 372 (P), 373 (P) & 93 (P), Village Thumkunta Village, Tehsil/Mandal Shamirpet Mandal, District Medchal-Malkajgiri District, State Telangana State 10 Nearest Railway station/Airport along Secunderabad - 15.6 Kms (SSW) with the distance in kms RGIA Airport – 40.0 Kms (SW) 11 Nearest Town, City, District Bollaram – 5.0 Kms (SW) Headquarters along with distances in Shamirpet – 3.2 Kms (NE) kms. Hyderabad – 18.0 Kms (SSW) 12 Village Panchayats, Zilla Parishad, Thumkunta Village, Municipal Corporation, Local body Shamirpet Mandal, (complete postal Address with Medchal-Malkajgiri District, telephone no. to be given) HMDA 13 Name of the applicant M/s. Shree Anurag Projects 14 Registered address Sri. M. Mohan Reddy Sy. No: 93, Mandaipally Road, Thumkunta, Shamirpet Mandal, Medchal-Malkajgiri District, Telangana State -500 078 15 Address of the correspondence Name Sri. M. Mohan Reddy Designation /owner/partner/CEO Sy. No: 93, Mandaipally Road, Address Thumkunta, Shamirpet Mandal, Medchal-Malkajgiri District, Telangana State Pin code 500 078 E-mail [email protected] Telephone no 9885052844 Fax no 16 Details of Alternative Sites examined No Alternative Sites are examined if any. Location of these sites Should be shown on a Topo sheet. 17 Interlinked Projects Not Applicable 18 Whether separate application of Not Applicable interlinked projects has been submitted 19 If yes, date of submission Not Applicable 20 If no reason Not Applicable 21 Whether the proposal involves approval / clearances under: if yes, details of the same and their status to be given. (a) The Forest (conservation) Act, No 1980? (b) The Wild life (protection)Act, No 1972? No (c) The C.R.Z notification, 1991? 22 Whether there is any Government No order/policy relevant/relating to the site? 23 Forest land involved (Hectares) No 24 Whether there is any litigation No litigation is pending against the project in any pending against the project and/or court of law to the best of knowledge. land in which the project is propose to be set up? (a)Name of the court (b)Case no. (c) Orders/directions of the court, if any and its relevance with the proposed project. 2 (II) Activity 1.0 Construction, operation or decommissioning of the Project involving actions, which will cause Physical Changes in the locality (topography, land use, changes in water bodies, etc.). S.No. Information / Checklist confirmation Yes/ Details thereof (with approximate quantities No /rates, wherever possible ) with sources of information data 1.1 Permanent or temporary change in Yes The proposed project activity is land use, land cover or topography Construction of Residential Apartments including increase in intensity of land Project. The site area is located in GHMC use (with respect to local land use area. The present land is waste land and is plan) not used for any productive purpose. The proposed project activity shall enhance the land cover. Topography: The present topography of the site is almost flat: Due to the project the topography of the project area will change. However, the drainage pattern will remain as per the existing pattern. 1.2 Clearance of existing land, vegetation No The land is barren and containing mainly and buildings? shrubs and bushes. The same shall be cleared. Buildings: There are no structures, hence not applicable. 1.3 Creation of new land uses? Yes There will be creation of new land use, which will be as per the approval of the HMDA. 1.4 Pre-construction investigations e.g. Yes There will be no physical impact on the bore holes, soil testing? locality due to the soil testing or other pre- construction investigations. 1.5 Construction works? Yes Construction of Residential Apartments Project 1.6 Demolition Works? No There are no structures in the proposed area; hence there are no demolition works involved. 1.7 Temporary sites used for construction Yes The site will have temporary store rooms works or housing of construction and site office during construction phase, works? which will be later demolished. The demolition waste will be used within the site itself. 3 Temporary shelters for construction workers are not required as majority of labor will be hired from the surrounding locations 1.8 Above ground buildings, structures or Yes The project will involve construction of earthworks including linear structures, Residential project. cut and fill or excavations This will add to the change in the localized physical environment. In the post construction phase, tree plantation and landscaped areas will be provided which will enhance the aesthetic beauty of the area. The excavated soil from the project will be to the tune of 11000 cu. m. will be used for filling purposes within the site. 1.9 Underground works including mining No Not Applicable or tunneling? 1.10 Reclamation Works? No Not envisaged. 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and manufacturing No No manufacturing activity. processes? Activity is Construction of Residential Apartments project. 1.14 Facilities for storage of goods or Yes Temporary storage shed will be provided at materials? site. The proposed project will have temporary sheds for the storage of construction materials. After the structural erection of the building, the construction materials will be stored at the earmarked places, so that the same is not carried away and causes obstruction in the storm water drains. 1.15 Facilities for treatment or disposal of Yes The details of solid and liquid waste solid waste or liquid effluents? generated & their disposal during the construction and post construction phase are tabulated as: Construction Phase: S. No Source Nature of Waste Treatment/ Disposal 1 Site preparation Solid waste: Reused within the activities Excavated soil (11000 cu. m.) project site for surface leveling 2 Construction Solid waste: activities Construction waste 4 Recyclable waste Sold to the vendors Inert waste (Brick, masonry, Used for road Concrete, etc.) making, & land filling within the project site. 3 Construction Solid waste: Will be sent to Workers (Total = 45 kg / day) GHMC, Hyderabad Biodegradable (35 kg/day) for disposal sites non – biodegradable (10 kg/day) Effluent: Will be treated in (> 8.0 KLD) temporary septic tank & soak pit. Post Construction Phase: S. No Source Treatment/Disposal 1 Domestic effluent 340 KLD Will be treated in STP of capacity 400 KLD based on FAB technology. Treated water will be used for Flushing & Gardening 2 Solid waste Garbage – 1470.74 Kgs/day S.T.P. Sludge – 20.0 Kgs/day 1.16 Facilities for long term housing of No Manpower requirement of operational operational workers? workers is nominal and will be recruited from surroundings therefore no long term housing facilities are envisaged. 1.17 New road, rail or sea traffic during No There will be no new road and rail. During construction or operation? construction phase, traffic will increase due to inward movement of raw materials. In the post construction phase, there will be increase in the traffic levels due to proposed project. 1.18 New road, rail, air waterborne or other No There is no new rail, air borne transport transport infrastructure including new infrastructure required for the project. or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Due to the upcoming project, there will be transport routes or infrastructure no closure or diversion of existing leading to changes in traffic transport routes or infrastructures leading movements? to changes in traffic movements. 1.20 New or diverted transmission lines or No Not envisaged pipelines? 1.21 Impoundment, damming, culverting, No The proposed development will not disturb 5 realignment or other changes to the the natural terrain of the area and will not hydrology of watercourses or disturb the water courses in any ways i.e. aquifers? no drain flows from the site. Rain Water Harvesting system is proposed to recharge the GWL. 1.22 Stream crossings? No There are no stream crossings in the proposed site. 1.23 Abstraction or transfers of water from Yes Water requirement of the project will be ground or surface waters? met from Public Supply & Ground Water. 1.24 Changes in water bodies or the land No The development will be carried out with surface affecting drainage or run-off? no disturbance to major water or the land surface, affecting drainage or runoff. 1.25 Transport of personnel or materials for Yes Transportation of personnel or material construction, operation or will be by trucks on road. decommissioning? 1.26 Long-term dismantling or No Restoration works for the project on long decommissioning which could have an term will be an ongoing activity which will impact on the environment? not have any impact on physical environment.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    18 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us