Somerset Rivers Authority End of Year Report 2016-17: Contents

Somerset Rivers Authority End of Year Report 2016-17: Contents

END OF YEAR REPORT 2016-17 1 SOMERSET RIVERS AUTHORITY END OF YEAR REPORT 2016-17: CONTENTS 1. Introduction (page 2) 2. Performance Delivery: Summary (page 3), Delivery Status: By Funding Source (page 4) Finance: Summary (pages 4 to 5) 3. Progress of Works in Detail Key Projects (pages 6 to 10) SRA 2016-17 Enhanced Programme (pages 11 to 21) INTRODUCTION In 2016-17, Somerset Rivers Authority (SRA) spent just over £6million on actions designed to give Somerset an extra level of flood protection. This end of year report explains where the money came from and how it was spent. It also gives information about projects that have been delayed or had their funding moved to other activities. These details have been provided because the SRA wants people to know what it has achieved across the county – and it wants to be properly accountable. The SRA raises extra money to deliver extra work. Schemes are prioritised for SRA funding on the basis of the main objectives in Somerset’s 20 Year Flood Action Plan, which was developed in response to the floods of winter 2013-14. This report is divided into two sections. Performance covers delivery overall and by funding source, plus a table summarising 2016-17 finance; Progress gives more details about major projects, and smaller actions grouped according to SRA workstream – Dredging & River Management, Land Management, Urban Water Management, Resilient Infrastructure and Building Community Resilience. Somerset’s approach is uniquely joined-up. This report details just one year of the SRA’s extra work. For much more information about earlier years, works in progress and works coming up, visit www.somersetriversauthority.org.uk A note on Somerset Rivers Authority: The SRA is a partnership between 11 of Somerset’s existing flood risk management authorities: Somerset County Council, the five district councils, the Axe Brue and Parrett Internal Drainage Boards, the Environment Agency, Natural England and the Wessex Regional Flood & Coastal Committee. The SRA’s purpose is to provide a higher standard of flood risk management than is affordable from the existing budgets of those flood risk management authorities. Photographic credits: The front cover photograph by Charlie Granger shows works to create one of the two new river channels at Beer Wall. All photos copyright © Somerset Rivers Authority 2017, except for those used by kind permission of: p.7 (x2) Phil Brewin, Somerset Drainage Boards Consortium; p.8 Hendrik Robinson, Arcadis; p.9 Jon Woodward; p.10 Environment Agency archive; p.12 Environment Agency; p.14 (x2) Dave Coles, Sedgemoor District Council; p.15-16 all FWAG SW, except for Aisholt Common and Carhampton (SRA) and Dillington (Stephen Banks, Watershed PR); p.17 map detail, Westcountry Rivers Trust. 2 PART 2: PERFORMANCE This section provides an overview of delivery progress by funding source, together with a financial summary. Delivery: Summary In March 2016, the SRA Board approved the Enhanced Programme of works to be delivered through the 2016-17 financial year. The Programme included 32 different actions for delivery across the whole of Somerset, covering all SRA Workstreams: W1 – Dredging & River Management, W2 – Land Management, W3 – Urban Water Management, W4 – Resilient Infrastructure, W5 – Building Local Resilience. Table A shows the overall status of actions as at end of March 2017, by funding source and year. The pie-chart shows the amount spent by the SRA from all of its funding sources, split by workstream. Table A: No. of actions* Actions completed Actions yet to be Actions closed Funding Source programmed for during 2016-17 completed and funds re- delivery 2016-17 allocated during including those 2016-17 brought forward b/f SRA Local Partners Funds 2016-17 Enhanced 32 11 16 5 Programme Interim Funding 2015-16 Enhanced 12 6 6 0 Programme b/f CLG Funding 2014-15 10 4 6 0 Actions b/f * Excludes projects funded through the Heart of the SW Local Enterprise Partnership (HotSWLEP) Growth Deal Fund. These projects are longer-term works stretching out towards 2020-21. See Part 3a of this report: Key Projects. 3 Delivery Status: By Funding Source - see Table B 2016-17 SRA Local Partners Funds Funding available from SRA Local Partners (council tax and contributions from Somerset’s IDBs) in 2016-17 was £2,777m. Thirty-two actions were approved for the SRA Enhanced Programme 2016-17. Eleven were delivered. Five were closed – with their funds reallocated to a new project. The remaining 16 actions will be completed in 2017-18. Many of these 16 actions are in W1 - Dredging & River Management. Hold-ups were caused by a mixture of procurement delays, environmental considerations, staff resource constraints and alternative funding becoming available. For example, the SRA put £300k towards a major flood alleviation scheme at Cannington. Most of the construction was done by December 2016, but the need for some mains service works prevented the new relief channel being officially finished by 31 March, 2017.The value of the work yet to be completed amounts to £846k of the £2,328m shown in Table B (p.5) as Carry Forward to 2017-18. The remaining £1,482k is made up of £760k of work completed in 2016-17, invoices for which were not received from contractors in time for the year end accounts; £654k set aside for the Sowy/Kings Sedgemoor Drain (KSD) enhancements and/or further pioneer dredging, and £68k of staff cost savings and the remaining contingency. 2015-16 SRA Interim Funding Twelve actions (out of the 23 funded by the SRA’s 2015-16 Interim Funding) were planned for completion in 2016-17. Six of these were completed, including: four local flood risk management measures, previously delayed by the need to resolve problems such as leaks from a privately- owned septic tank; additional dredging of Hixham Rhyne; and re-instatement work on the banks of the Cripps. The remaining six actions are now due to be completed in 2017-18. One of these is the appointment of a Riparian Enabling & Enforcement Officer who is due in post in Summer 2017. Actions scheduled for late 2017 include River Brue tree work, further Mark Yeo dredging, and drainage improvements from Old Cleeve to Blue Anchor Road. Reasons for previous delay have included landowner consent and contract preparation matters. Remaining 2015-16 Interim Funding of £608k (see Table B, Carry Forward) will cover these outstanding actions, together with a provision of £200k set aside for the Sowy/KSD enhancements, a key project for the SRA. 2014-15 Department of Communities & Local Government Funding (CLG) Ten of the CLG-funded actions were planned for delivery during 2016-17; four were completed. The other six account for the unspent CLG funding of £167k (see Table B) carried forward to 2017-18. Some of these six actions involve community working, which demands a slower pace of delivery than anticipated in 2014. Ongoing actions include SRA funding to further support the Community Resilience in Somerset Partnership (CRiSP) and working with communities to provide grants for equipment and training. Phase 2 of the Community Land Trust activity gained Dream Fund funding, so its allocated CLG funds will instead support Phase 3 in 2017-18. Heart of the SW Local Enterprise Partnership Growth Deal Funding and Key Projects During 2016-17, the SRA spent £4,044m out of a total of £13.49m HotSWLEP’s Growth Deal funding, awarded for longer-term project work stretching out to 2020-21. This funded SRA Key projects, namely Pioneer Dredging of the River Parrett, Sowy/King’s Sedgemoor Drain enhancements, Bridgwater Tidal Barrier, and Slow the Flow Natural Flood Management schemes. Finance: Summary by Funding Source Table B shows the financial summary for the year, split by funding source. The total funding 4 available in 2016-17 (excluding HotSWLEP Growth Deal Funding) was £5.114m. This figure includes unclaimed funds brought forward from 2015-16 (Interim and CLG). Total funding spent by the SRA in 2016-17 was £6,055m. However, this is not a true reflection of the spend by SRA delivery partners on SRA works, as there is a time lag between delivery partners receiving their contractor invoices and then raising a claim to the SRA. The total spend by all SRA partners on works in 2016-17 was therefore greater than the £2,011m stated in the Spent column of Table B. A balance of £3,103m is to be carried forward to 2017-18. Funding requirements have been updated throughout the year by the SRA Board, and surplus funds have been re-allocated to new works which have emerged as delivering greater benefit. This is why in some cases in Table B the amount shown under ‘Carry Forward 2017-18’ varies from the ‘Difference’ figure. For a further explanation of Table B, please refer to the previous paragraphs. Table B: Somerset Rivers Authority 2016-17 Financial Summary Funding Source Original Spent** Difference Carry Forward Funding 2016-17 2017-18 2016-17 £’000 £’000 £’000 £’000 SRA Local Partners Funds - Council Tax & IDB Capital programme 757 48 709 603 Maintenance Programme 1,674 240 1,434 1,003 Provision for Sowy/KSD 0 0 0 654 Contingency 108 0 108 26 SRA Administration & IDB Staffing 238 161 77 42 Total SRA Local Partners Funding 2,777 449 2,328 2,328 Interim* Funding brought forward from 2015-16 Enhanced Maintenance Programme 1,488 1,416 72 72 Maintenance of Rivers & Rhynes 601 96 505 314 Provision for Sowy/KSD 0 0 0 200 Contingency 30 0 30 21 SRA Administration & IDB Staffing 2 1 1 1 Total Interim Funding 2,121 1,513 608 608 Department of Communities & Local Government Funding (CLG) Outstanding Activities 199 49 150 150 Contingency 17 0 17 17 Total CLG Funding 216 49 167 167 Total Funding 5,114 2,011 3,103 3,103 HotSWLEP Growth Deal Funding Dredging, Sowy/KSD, Bridgwater Barrier, Slow the Flow 4,044 Total Spent 2016-17** 6,055 * Interim: £1.9m contribution from DEFRA and £800k contribution from SRA Local Partners ** Spent: Amount claimed by delivery partners from the SRA during 2016-17 5 PART 3a: KEY PROJECTS – Dredging Pumping Station, that was carried out for the SRA by the Parrett IDB with contractors WM 1) 750m of Pioneer Dredging on the River Longreach before Easter 2016.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    21 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us